Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.1 Craccepted-aoc | ₹1.1 Cr | accepted-aoc |
| 2 | ₹1.3 Craccepted-aoc | ₹1.3 Cr | accepted-aoc |
| 3 | ₹1.4 Craccepted-aoc | ₹1.4 Cr | accepted-aoc |
| 4 | ₹1.5 Craccepted-aoc | ₹1.5 Cr | accepted-aoc |
| 5 | ₹1.5 Craccepted-aoc | ₹1.5 Cr | accepted-aoc |
Tender Value
₹24.0 Cr
EMD Value
₹39.7 L
Closing Date
17 Feb 2026, 9:30 pmClosed
Hubli Electricity Supply Company Limited
Ramesh Rathod
Repairs and Re conditioning of faulty Conventional and BEE Any star Rated Distribution Transformers of various capacities (25, 63 & 100kVA) of different makes at various sub divisions/ divisions in HESCOM
HESCOM/2025-26/SE0722
HESCOM/2025-26/SE0722
Open
Three Cover
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
₹7,500
₹39.7 L
17 Feb 2026
2 Feb 2026
18 Feb 2026
9 Feb 2026
9 Feb 2026
……………………... ELECTRICITY SUPPLY COMPANY LIMITED
DETAILS OF THE TRANSFORMERS REPAIRED BY BIDDER (REPAIRER)
1. Name and Address of the Firm/Repairer (with Phone no and E-Mail ID)
2. Name of Division and ESCOM.
3. Total No. of Transformer repaired
Sl. No. DWA No. & Date P.O/Award.No. & Date No. of Transformer issued for repairs No. of good Transformers returned after repairs Remarks
25 kva 63 kva 100 kva TOTAL 25 kva 63 kva 100 kva TOTAL
Signature with Seal of the officer
(Note: Bidder has to upload this completed letter along with Bid Documents)
No: _______ Date:
This is to certify that M/s. _____________________________ camp at _________________ have under taken the repair and reconditioning of faulty distribution transformers work and the % failure rate of repaired distribution transformers within guarantee period is less than 7%.
The details of capacity wise transformers repaired and faulty within guarantee period is as here under.
Sl. No. Year No. of transformers repaired in KVA No. of transformers faulty within guarantee % failure Penalty imposed if any Rs. in Lakhs
25 Total 25 Total 25 Total
It is hereby certified that the performance of the above said transformers is found satisfactory for the guaranteed period
Name & Designation
Executive Engineer (Ele)
Note: Clearly mention Penalty imposed or Not.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT.doc
Others - NIT • 1.04 MB
Technical specification.doc
Others - Specifications • 7.96 MB
Bid documents.doc
Others - Bid documents • 0.26 MB
annexure-c.pdf
Others - Annexures • 0.14 MB
annexures a_b.xls
Others - Annexures • 0.04 MB
Instruction to bidders.doc
Others - Instructions to bidder • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .