CHIEF ENGINEER (G)
Work of Design, Supply, Erection, Testing and commissioning of new Generator Relay Panels in place of old panels for Unit No. 3 & 4 of Gandhinagar TPS.
325769
ET-248
Open
Miscellaneous Works
Turn-key
Gandhinagar
4 documents required · 4 mandatory
₹17,700
GUJARAT STATE ELECTRICITY CORP. LTD.
₹6.9 L
14 Sept 2026
22 Jul 2026
21 Sept 2026
22 Jul 2026
14 Sept 2026
22 Jul 2026
towards payment of EMD and Tender fee are found ok, then only Technical Bid
will be opened (On-line). Tenders submitted without Tender Fee-EMD by the
firms, will be rejected without entering into further correspondence.
Submission of required documents for exemption of Tender Fee & EMD is
The exemption in payment of Tender Fee & EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering
process for the product which they are manufacturing / service which
they are providing and have Udyam registration for items / service under
2. Start-ups which participate directly in tendering process for the product
which they are manufacturing/service which they are providing and re-
PUR-F-10 ET-248
cognized by DPIIT under the Start-up India Program and has obtained
Udyam registration.
3. Organization which has registration certificate for the manufacturing
product of the tender, from Gujarat Khadi Gramodyog Board or Khadi
and Village Industries Commission(K.V.I.C)or Commissioner of Cottage
4. Board/Corporations/PSUs of the Central/State Government for their
own manufactured items.
5. State Government recognized organizations like(i) organizations for
blinds, dumb and deaf, disabled, mentally disabled persons;(ii)women's
self-help group recognized by Gujarat Livelihood Promotion Company;
which participate directly in tendering process for the product which they
are manufacturing / service which /they are providing.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering
process as Manufacturers or Service Providers, and holds a valid Udyam
Registration, are eligible for exemption from payment of Earnest Money Deposit
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or
similar categories (i.e. other than Manufacturers/Service Providers) are not
eligible for EMD exemption.
3. Migration period for Reclassification of MSMEs: - ln case of an upward change
in terms of investment in plant and machinery or equipment or turnover or
both, and consequent re-classification, an enterprise shall continue to avail of
all non-tax benefits of the category (micro or small or medium) it was in before
the re-classification, for a period of three years from the date of such upward
Vendor Registration with GSECL is not compulsory for submitting this tender.
PUR-F-10 ET-248
GUJARAT STATE ELECTRICITY CORPORATION LTD.
THERMAL POWER STATION, GANDHINAGAR-382
TENDER Work of Design, Supply, Erection, Testing and commissioning
of new Generator Relay Panels in place of old panels for Unit
No. 3 & 4 of Gandhinagar TPS.
1 Tender Notice
2 Important Notes (Online Only)
3 Bidder Details (Online Only)
4 Technical Bid (Online Only)
5 Price Bid (Online Only)
Annexure (1 to 15, Certificate-A, Important Instruction & Integrity Pact)
of Commercial Terms & Conditions (Online Only)
Important : Pl. ignore “ Submission of Physical Document” wherever
mentioned, i.e. either in Tender Document or Commercial Terms & Condition.
For & On Behalf of GSECL
Chief Engineer (Gen)
GSECL, TPS Gandhinagar
Download & Submitted by _______________________________
(Name of Firm with Seal)
PUR-F-10 ET-248
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
e-mail: [email protected]; Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
(A Successor Company of Gujarat Electricity Board)
Work of Design, Supply, Erection, Testing and commissioning
Sub : of new Generator Relay Panels in place of old panels for Unit
No. 3 & 4 of Gandhinagar TPS.
CE [Generation], Gandhinagar, TPS invites “On-line Tenders” (e-tendering) for the
purchase of above subject item. Tender Papers & Specifications may be down loaded
from Web site https://gsecltender.nprocure.com (For view, down load and on line
submission) and GUVNL / GSECL web sites www.gsecl.in (For view & down load only).
“NO COURIER SERVICE OR HAND DELIVERY” will be accepted.
Tender No. ET-248
Tender Fees (Non-Refundable)
Earnest Money Deposit (EMD)
(Please refer page 1 & 2 of Tender Document)
Last Date of submission of Online [e-
tendering] tender / offer , Technical as
well as Price bid along with soft copy of all
other documents as stated here under up
to18.00 Hrs. (This is mandatory).
Only EMD/Tender Fee related physical
documents will be required from bidders
before due date. As per NIT Details
Date of opening of Online Technical bid at
15.30 hrs(if possible), all relevant
documents submitted through online
process. Online technical bid will be
opened for Bidders who have submitted
Physical Document against EMD/Tender
Fee within due date as per NIT.
Party has to be in touch with website
Tentative date of On-line opening of price https://gsecltender.nprocure.com and
bid at 15.30 hrs. (if possible) also with e-mail sent by above website.
120 Days from the Date of
Validity of Rates (Compulsory)
Opening of Technical Bid.
Delivery of Goods/Completion of work As per Technical Bid
Sample Approval As per Technical Bid
Security Deposit As per Cl. No. (1) of Notes for
Supplier mentioned under
PUR-F-10 ET-248
Important Notes to Bidders:
(1) It is mandatory for all the bidders to submit their tender documents Online (e-
tendering) and in schedule time. Please note that Price bid is to be submitted
online only. Bidders should have to fill and submit the tender documents
on n-procure websites only. Tender documents submitted in tenderer’s own
printed paper or format other than GSECL’s format is liable to be ignored.
(2) Any technical information and clarifications that may be required pertaining to
this tender should be referred to the Chief Engineer (Gen), Gujarat State
Electricity Corporation Ltd., Thermal Power Station, Gandhinagar–382041,
Gujarat (India).
(3) Bidder has to upload scanned copies of original (Notarized/ self attested copies
of original – as specified in tender document) documents with online bid and no
physical documents are to be submitted. If physical Tender documents
submitted by any bidder then offer of the same bidder is liable to be ignored and
no further communication in the matter will be entertained.
(4) It shall be sole responsibility of the bidder that the uploaded scanned
documents (in PDF format) remain legible and should not be password
protected. The size of PDF is to be suitable so that it can be uploaded online (n-
procure). No any documents will be accepted offline or hard copy.
(5) Bidder should have to give Validity of their offer for minimum 120 days from the
actual date of opening of Technical Bid otherwise their tender/offer will be
ignored/rejected. Bidder shall have to extend validity further for 60 Days, if
required on all tender items (not for individual items), otherwise your offer is
liable to be ignored.
(6) GSECL reserves the rights to reject any OR all tenders without assigning
any reasons thereof.
(7) Please note that Conditional Offers will liable to be ignored.
(8) Bidders should be in touch with N-Procure and GSECL websites for information
regarding revision/ corrigendum/ amendment in tender till due date of on line
submission and thereafter. No separate correspondence will be done in this
(9) If the bidder wish to submit Bank Guarantee (BG) in lieu of Earnest Money
Deposit (EMD)/ Security Deposit (SD) / Performance Bank Guarantee (PBG),
then the bidder should ask his BG issuing Bank to give intimation to our Bank
of Baroda (Beneficiary Bank), , SECTOR-21, GANDHINAGAR branch having IFS
Code as BARB0GANDHI (fifth letter is zero) through Structured Financial
Messaging Solution (SFMS). BG should be valid for minimum one year.
(10) Bidder shall have to submit scanned copy of Active GSTIN registration and PAN
in online bid. Tenders submitted without Active GSTIN by the bidders, the offer
will be rejected without entering into further correspondence.
(11) If any deviation in your offer with respect to Tender specification, then please
mention clearly in separate deviation sheet Annexure-12, otherwise your offer
will be considered exactly as per our Enquiry / Tender specification.
(12) Whichever terms conflict with “GENERAL COMMERCIAL TERMS AND
CONDITIONS” the terms mentioned in “TENDER DOCUMENT/NIT” will be
(13) GSECL reserves the right to place the order on technically qualified bidders for
item wise lowest quoted party.
(14) Party has to accept part order.
(15) If participating bidder/agency have stake in one or more other agencies /
bidders who are participating in same tender and on account of submission of
PUR-F-10 ET-248
wrong information / declaration in the tender / enquiry certificate – A, then the
bidder will be declared as disqualified automatically and EMD/SD will be
forfeited, Further, GSECL shall take stern action including Stop dealing with
(16) GSECL reserve the rights to accept/reject/cancel any or all the offers/tenders,
extend dates and/ or re-advertise tender, and/ or the whole process of
tenderization at any stage without assigning any reasons thereof.
(17) In case of short submission of documents with bid, GSECL reserves the right to
ask through e-mail / electronic mode / letter to submit the required details /
documents and/or clarification in physical form as well as in electronic form as
the case may be. The bidder has to submit the required document / details /
clarification asked by GSECL within stipulated time limit, failing which the bid
will be liable for rejection.
(18) The party must agree to participate in the VMS during tendering process and
provide necessary details to streamline the VMD registration process to avoid
delays in payment for supplies.
(19) Dispute Resolution Mechanism: Arbitration through the Arbitration Centre
(Domestic and International) High Court of Gujarat at Ahmedabad.
19.1) Amicable settlement
“Any dispute, difference, controversy or claim between the parties
arising out of or relating to this contract with reference to the
construction, interpretation, breach, termination or validity
thereof (herein after referred as “the Dispute”) shall, upon the
written request of either party by referred to the authorized
representatives of the disputing parties for resolution. The
authorized representatives shall promptly meet and attempt to
negotiate in good faith a resolution of the dispute within
days of the service of the request.”
19.2) Arbitration
If the parties fail to amicably resolve the disputes or
differences or contrary claims as indicated herewith in sub
clause (1) of Clause 19 arising under or in connection with the
present agreement, the same shall be referred to the
Arbitration Centre (Domestic & International) High Court of
Gujarat at Ahmedabad (“the Centre for short”), currently
functioning in the High Court Complex, Sola Ahmedabad for
appointment of arbitrator and thereupon, the Centre shall
appoint a sole arbitrator and conduct the arbitration
proceedings in accordance with its rules. If the parties
unanimously agree to appoint three arbitrators then in that
case, each party shall appoint one arbitrator from the panel of
arbitrators of the Centre, and the Centre shall appoint the
third arbitrator, who will act as the Presiding Arbitrator. Such
arbitration shall be the sole and exclusive remedy between the
parties for all disputes arising under or in connection with this
agreement. The arbitration shall take place at The Arbitration
Centre Ahmedabad, High Court Complex, Sola, Ahmedabad,
Gujarat, in accordance with the provisions of the Arbitration
and Conciliation Act, 1996 as amended from time to time, and
the proceedings shall be conducted in English. The arbitration
award shall be final and binding on the parties.
(20) Bidder should read and verify the documents of Commercial Terms & Conditions
of Tender & Supply (i.e. clause No. 1 to 71) of GSECL, Gandhinagar TPS and
confirm that all the above documents are verified & certified by you as below.
PUR-F-10 ET-248
“I/we read the above documents and agree for the Conditions of Tender &
Supply (i.e. Clause No.1 to 71) of GSECL, Gandhinagar, TPS and accordingly
submitted my / our offer.”
(a) It is mandatory to accept the Cl. 1 to 71. Bidder may accept the same on
a single paper instead of all 37 pages. [Pg. 1 to 37] and attach PDF copy
of seal & signed paper in online documents.
(b) It is mandatory to submit duly filled, stamped and signed PDF copies of
Tender Document up to Technical Bid, Annexure – 1 to 15 including
Annexure 10 (GSECL-GTPS), Integrity pact, Important Instruction and
certificate-A through online (n-Procure) process only.
(21) “All bidders shall submit the details/documents in support of Technical
Qualification Requirements duly certified and verified for authenticity from
Specified Third-Party Inspection Agency (TPIA) along with a certificate regarding
verification of authenticity of documents as per the format placed at Annexure-1.
All the documents submitted by the bidder in support of meeting Technical QR
only shall be digitally signed by the Specified Third-Party Inspection Agency
(TPIA). The verification and certification of authenticity of documents is
acceptable from any of the following TPIAs:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd.- Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt. Ltd.
9. M/s Bureau Veritas (india) Pvt. Ltd.
10. Hertz Inspection & Services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
The Bidder shall be responsible for getting their documents/ credentials verified &
certified by the Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of
their Company or Practicing CA/CA Firm in support of Technical QR. All the costs
pertaining to third party verification and certification (including those by statutory
auditors) shall be borne by the Bidder. GSECL shall have no liability (financial or
otherwise) towards the same and shall not be liable for any claim/ dispute between
the bidder and the Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor
of their Company or Practicing CA/CA Firm.”
Note:- The Above Clause No.(21), TPIA Verification for authenticity shall not be
applicable in following cases
(1) If Bidder having proven track record or regular suppliers/Contractors (i.e.
OEM/ OES/ PSU’s).
(2) If Bidder should have Past order copies of GSECL as these documents can
be Verified internally.
For & On Behalf of GSECL,
Chief Engineer (Gen)
GSECL, TPS Gandhinagar
PUR-F-10 ET-248
Undertaking from Third Party Inspection Agency/Statutory Auditor or
Practicing CA/CA Firm
(On letter head digitally signed by a person duly authorized to Sign on behalf of the
Power Station Gandhinagar.
Subject: Authentication of veracity of documents submitted by M/s
…………………………… in support of Meeting the Qualifying Requirements.
Ref : Tender no.: …………………..
Name of the Package/ Tender: ………………………………………
M/s. …………………… (hereinafter called Bidder) having Registered office at
…………………… intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party
Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA
Firm as per the list mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following
documents, which are also attached with this letter. The same has been verified from
the Original Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and
1. Doc ref. no. ……….. dated …….. (Name of Documents)
2. Doc ref. no. ……….. dated …….. (Name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of
We further confirm that we neither have any vested interest in aforesaid tender nor
have any conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose
of participating in the subject tender/s.
Bidder’s Signature
with Seal & Date
PUR-F-10 ET-248
GUJARAT STATE ELECTRICITY CORPORATION LTD
Thermal Power Station, Gandhinagar-382
Note: Bidder has to fill following Details without fail (It is Mandatory).
1. (a) Full Name and Address
2. Particulars of Registration as a
Contractor and class in which
(a) In the Gujarat Elect. Corp. Ltd.
(b) In other Government
3. Reference to be made to (Name &
4. Previous experience in Railway, PWD
and other works
5. Any other information the contractor
may desire to give
Bank Account Number
Name of Beneficiary
Type of Account
Branch Name & Address
Contact Number of The
Cancelled Cheque copy Scan copy of the same is mandatory
PUR-F-10 ET-248
Sub: Work of Design, Supply, Erection, Testing and commissioning of
new Generator Relay Panels in place of old panels for Unit No. 3 &
4 of Gandhinagar TPS.
Description of Material Unit
PRE WIRED PROTECTION PANEL COMPRISING
NUMERICAL GENERATOR PROTECTION SCHEME
FOR GENERATOR , GENERATOR TRANSFORMER
UAT PROTECTION RELAYS AND OTHER AUXILIARY
RELAYS AND ACCESSORIES AS PER
PC , NETWORKING CABLE, ETHERNET SWITCH
INTERFACING EQUIPMENTS ETC FOR DR WORK
STATION AND SCADA (W/O CONTROL)
APPLICATION AS PER SPECIFICATION.
SPARES SET OF ALL RELAYS INSTALLED IN
GENERATOR RELAY PANEL INCLUDING ALL TYPE
OF AUX RELAYS, FREQUENCY GENERATOR &
FILTER, CONTACTORS, RESISTANCES AND
ACCESSORIES INSTALLED IN SUPPLIED GRP
PANELS.(10% SPARE OR MINIMUM 1 (ONE) NO.)
INSTALLATION, TESTING AND COMMISSIONING
OF GRP PANELS MENTIONED AT SR. NO 1 ABOVE
INSTALLATION, TESTING AND COMMISSIONING
OF DR WORK STATION AND SCADA WITHOUT
CONTROL FOR GRP MENTIONED AT SR. NO.2
Note: Overall Lowest party’s offer will be considered for placement of order i.e.
considering supply and works part as a whole. Part/Partial offer will not
be considered and order will be awarded to overall L -1 bidder.
Pre Qualifying Criteria for Bidder
The bidders who wish to participate in the bidding shall satisfactorily establish that
they fulfill the following Qualifying Requirements:
A. Technical qualification criteria:
1) The bidder shall be Original Equipment Manufacturer (OEM)/OES. The
offered equipmenthave to be designed, manufactured and tested as per
relevantIS/ IEC with latest amendments.
2) The bidder should have executed / completed similar works during the
last seven (7) years in Government / semi government / state electricity
board / private limited company / public limited company / IPP , as on
last date of the month preceding the month of publication of tender,
having minimum contract /order values as indicated below :
a) One order of value not less than the amount equal to Rs.
b) Two orders, each of value not less than the amount equal to Rs.
PUR-F-10 ET-248
c) Three orders, each of value not less than the amount equal to Rs.
Similar work means: “The bidder should have engineered, manufactured,
supplied, erected and commissioned Numerical Relay based “Busbar Protection
system” and/or “Generator protection system” and/or “Transmission Line
protection system” for switchyard/substation/power plant. For above, purpose
work carried out at single or multiple locations will be acceptable.”
B. Financial qualification criteria:
1) The Average Annual Turnover of the bidder, shall not be less than Rs.
69,43,288.25 during the preceding three (3) financial years as one date of
Techno-Commercial bid opening.
2) Net worth of bidder shall not be less than 100% of the bidder’s paid up
share capital as on the last day of the preceding financial year. In case the
Bidder meets the requirement of Net worth based on the strength of its
Subsidiary (ies) and/or Holding company and/or Subsidiaries of its
Holding Companies wherever applicable, the Net worth of the Bidder and
its Subsidiary (ies) and/or Holding company and/or Subsidiary (ies) of the
Holding Company, in combined manner should not be less than 100% of
their total paid up share capital. However individually, their Net worth
should not be less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3 are
individual net worth which shall not be less than 75 % of the respective
paid up share capitals and y1, y2, y3 are individual paid up share capitals.
3) In case the bidder is not able to furnish its audited financial statements
on stand-alone entity basis, the unaudited unconsolidated financial
statements of the bidder can be considered acceptable provided the
bidder further furnishes the following documents for substantiation of
its qualification.
Copies of the unaudited unconsolidated financial statements of
the bidder along with copies of the Audited consolidated financial
statements of its Holding Company.
A Certificate from the CEO/CFO of the Holding Company, stating
that the unaudited unconsolidated financial statements form
part of the Consolidated Annual Report of the company.
4) In cases where audited results for the last preceding financial year as on
the date of techno-commercial bid opening are not available, the
financial results certified by a practicing Chartered Accountant shall be
considered acceptable. In case, Bidder is not able to submit the
Certificate from practicing Chartered Accountant certifying its financial
parameters, the audited results of three consecutive financial years
preceding the last financial year shall be considered for evaluating the
financial parameters. Further, a Certificate would be required from the
CEO/CFO, stating that the Financial results of the Company are under
audit as on the date of Techno-commercial bid opening and the
Certificate from the practicing Chartered Accountant certifying the
financial parameters is not available.
5) The bidder must submit Average Annual Turnover and Net worth
Certificate in support of Financial QR, duly certified and verified for
authenticity from Independent Statutory Auditor of their company /
Practicing Charted Accountant/ C.A. Firms / TPIA (Third-Party
PUR-F-10 ET-248
Inspection Agency ) empaneled approved by GSECL, along with copy of
Annual Audited Accounts of last three years.
Note for point No.1, 2, 3&4:
i. Other income shall not be considered for arriving at annual turnover.
ii. “Holding Company" and “Subsidiary Company” shall have the meaning
ascribed to them as per Companies Act of India, in vogue.
iii. Net worth means the sum total of the paid up share capital and free reserves.
Free reserve means all reserves credited out of the profits and share premium
account but does not include reserves credited out of the revaluation of the
assets, write back of depreciation provision and amalgamation. Further, any
debit balance of Profit and Loss account and miscellaneous expenses to the
extent not adjusted or written off, if any, shall be reduced from reserves and
Other requirements:
(1) Bidder should have a separate valid GST registration number and PAN
(2) Copy of P.F. code from the appropriate provident fund authorities.
(3) Labour License for Labour Contract: The contractor on getting the work order
but before starting the work shall have to furnish the copy of Labour License
under the Contract Labour (Regulation & Abolition) from the appropriate
authorities. Also required workman group insurance policy covering labour
(4) The bidder must submit performance certificates or satisfactory work
completion certificates (issued directly by the utility) or Copy of Processed
Final Bill of the executed / submitted PO from the utility. Bidders shall be
required to submit all the documents, in support of Technical QR (Such as
copies of Purchase orders/work orders / Contract Agreements, Client
Certificates, etc), duly certified and verified for authenticity by the
Independent Statutory Auditor of their company / Practicing Charted
Accountant/ C.A. Firms / TPIA (Third-Party Inspection Agency)
empaneledapproved by GSECL
(5) Tender fee & EMD will be application as per NIT.
PUR-F-10 ET-248
Technical Specifications: Detailed Item technical specifications of indented item
is attached as per Annexure-A separately.
TERMS & CONDITION:
(1) Party has to supply material as per detail technical specification only.
(2) Party has to clearly mention offered make/model in technical bid with detailed
technical literature for each item.
(3) Order Validity:- The validity of this order is 30 months from the date of issue of
Order however order validity may be extended by mutual agreed.
(4) Completion Time :-
Supply Portion:- The time limit for the supply of material at the GTPS site
is 6 months from the date of issue of LOI or 4 months from the date of
drawing approval, whichever is earlier. Penalty will be levied as per
applicable rules in case of delay.
Work Portion:- The retrofitting job work must be completed within 20 days
during the scheduled shutdown period. A prior intimation of 15 days will be
given before the shutdown. Failure to complete the work within the
stipulated time will attract penalties as per applicable rules.
(5) You have to give guarantee certificate for 36 Months from the date of receipt of
material at Main store GTPS for all supplied materials & 10 Years for all
supplied numerical relays/BCU/Injection Unit/protection devices. If
goods/equipments are found defective during guarantee period due to bad
design material or workmanship, the same should be replaced/repair free of
(6) You have to submit material test certificate along with supply.
(7) You shall have to supply necessary supply cable/connector.
(8) Delivery: F.O.R. GSECL, MAIN STORE GANDHINAGAR THERMAL POWER
(9) Payment: As per GSECL Standard Terms and Conditions.
PUR-F-10 ET-248
Sr. DESCRIPTION PAGE
1.00.00 Intent Of Specification
2.00.00 Scope of Bidder
3.00.00 Schedule Of Requirement
4.00.00 Standards
5.00.00 Climatic Conditions
6.00.00 General Description of the Project.
7.00.00 General Technical Requirement: - Panel
8.00.00 General Technical Requirement:-Relays
9.00.00 General Technical Requirement:-SCADA
10.00.00 Details Of Instrument Transformers, Power Transformers And
11.00.00 Principal Technical Parameters of Relay & Scheme
13.00.00 Inspection During Manufacturing
14.00.00 Quality Assurance Plan
15.00.00 Performance Guarantee
16.00.00 Deviations
17.00.00 Document Submission
18.00.00 Drawings / Data / Documents To Be Submitted By Bidder
Along with The Bid
19.00.00 Drawings / Data / Documents To Be Submitted By Successful
20.00.00 Demonstration
21.00.00 Packing And Transport
22.00.00 Training
23.00.00 Supervisory Installation & Commissioning
24.00.00 Guaranteed Technical Particulars
25.00.00 Guarantee For Maintenance Spares And Services
SIGN OF BIDDER CHIEF ENGINEER (Gen),
PUR-F-10 ET-248
1.00.00 INTENT OF SPECIFICATION
1.01.00 This specification is intended to cover design, engineering, manufacture,
Fabrication, assembly, inspection and testing at manufacturer's works,
packing & forwarding, supply, delivery at GTPS site, installation and
commissioning of complete Pre wired Generator Protection Relay Panel
having latest state of the art technology Microprocessor base Numerical
type Generator & Transformer protection relay including required Trip
relay , auxiliary relay , TBs etc. in place of existing Generator relay Panel
having Static and Electromechanical relays provided for Generator
Protection of Unit # 3 & 4 at Gandhinagar Thermal Power Station as
specified hereunder & as given in the schedule of requirements. The scope
also includes supply of spare set of relays for protection of Generator,
Generator Transformer and UAT similar to supplied in above protection
panels at GTPS.
1.02.00 DR work station/SCADA system to connect all these numerical relays of
above mentioned GTPS unit-3 & 4 with a dedicated PC for viewing online
parameters, data downloading and uploading etc. The SCADA application
should have suitable software and interface for viewing status of field
equipment’s like Isolators, Circuit breakers etc. and viewing parameters in
the Single line diagram graphic prepared in the software supplied and
installation & commissioning of the same for both units of Gandhinagar
Thermal Power Station. Number of binary inputs/binary outputs for field
equipments status will be as per scheme requirements plus minimum 10%
as spare for GTPS Unit 3 &
1.03.00 All drawings and Annexure appended are part of the specification and
supplement the requirement specified herein. The specification shall be
read and Construed in conjunction with the drawings and annexure to
determine the scope of work and terminal points.
1.04.00 As existing relays have been phased out and no technical support available
from OEM of GTPS Unit- 3&4, it has become necessary to replace existing
relays with panel. Modification required in the existing schemes / wirings,
for matching of new numeric protection relay scheme including design
programming , configuration , setting calculation , drawing preparation
,etc. to suit the requirements of existing protection scheme shall be
covered under scope of contract. The proposed scheme, based on the
existing protection requirements, must be thoroughly studied.
Thereafter, the bidder shall obtain approval from GTPS. The new
scheme should incorporate Main I and Main II redundancy; however,
the bidder may study the existing system and propose a suitable
scheme based on the offered relay architecture, provided that the
scheme covers all required protection functions and utilizes the
existing CT/PT inputs effectively to ensure a reliable protection
1.05.00 It is also intended to include complete relay application check and final
relay settings calculations to confirm suitability of new relays for the
existing equipments to be protected / existing relays both technically as
well as dimensionally.
1.06.00 The bidder shall visit the site and get him acquainted with the actual
requirements of site prior to quoting rates. No claims for inadequate
description of the scope shall be entertained at a later date.
1.07.00 It is not the intent to completely specify all details of design and
construction herein. Nevertheless, the equipment and installation shall
confirm to high standards of engineering design and workmanship in all
respects and shall be capable of performing continuous operation in a
PUR-F-10 ET-248
manner acceptable to the Purchaser. Reliability, availability and
maintainability are of the utmost importance to the Purchaser in the
design of the equipment described herein.
1.08.00 Preferred Make:- GE (formerly Alstom) and SIEMENS (SIPROTEC 5 series)
make relays only.
2.00.00 SCOPE OF BIDDER
2.01.00 The scope of supply shall include but not limited to FOR destination
supply of Pre wired Complete Panel with comprehensive numeric relays for
Generator , Generator Transformer and Unit Auxiliary Transformer
protection including Numerical Protection relay having sufficient no. of
Binary Input & Output and Analogue Input channels, Auxiliary relays
Tripping relays , TBs , Wires , Indicators , Test Switches / Sockets , Test
plugs , Stabilising resistors , illumination , pushbuttons , earth links etc.
to provide total functionality of protection for Generator , Generator
Transformer , UAT and integration of various functions in each unit as per
existing and new proposed protection scheme and logic.
2.02.00 Supplier can visit the Power Station to assess the quantum of work for
retrofitting the numerical relay if required.
2.03.00 It is not the intent to specify completely all the details of the design and
construction of equipment. However, the equipment shall conform in all
respects to high standards of engineering, design and shall be capable of
performing continuous operation up to the supplier’s guarantee. In a
manner acceptable to the purchaser, who will interpret the meaning of
drawings and specifications, and shall have the power to reject any work of
material which, in his judgment is not in accordance therewith. The offered
equipment shall be complete with all components necessary for their
effective trouble free operation. Such components shall be deemed to
whether those are specifically brought out in this specification and/or the
commercial order or not.
2.04.00 Software & Hardware for communication with relay, required accessories
Binary and Analogue input status and measurement interface cards &
equipments , com ports, connectors , networking accessories , cable , PC
Dedicated GPS for time synchronization, suitable furniture including
chairs, PC tables with facility of required inbuilt power supply board and
enclosed compartments with lock and key for DR work station and SCADA
application (without control) referred above shall be part of the scope of
2.05.00 The Bidder shall study the existing scheme of protection for Generator,
Generator Transformer, UAT and associated equipments and accordingly
offer complete protection scheme of Protection with redundancy (Main I &
Main II) covering all existing protections and additional functions as
available in the offered numerical relays. There should be sufficient
number of Analogue input, Binary Input, Binary Output to suit the
requirement of protection function and logic. (The proposed scheme shall
be based on the existing protection requirements. The bidder must study
the existing scheme and accordingly offer a new scheme based on the
offered relay architecture, ensuring that it covers all required protection
functions and utilizes the existing CT/PT inputs as indicated to provide a
reliable protection Scheme.) However final scheme and application will be
decided after discussion with bidder during technical scrutiny of the offer.
2.06.00 The existing scheme of protection, CT, PT detail, Transformer detail etc.
have been furnished with this specification , however bidder should visit at
site to access the requirement , quantum of work , scheme logic , location,
dimension detail etc. before submitting the bid. The bidder shall submit
PUR-F-10 ET-248
complete detail of the scheme to be offered viz. relay, panel, configuration
of scheme logic, protection function and features etc.
2.07.00 The characteristics and relay setting ranges shall be decided by the bidder.
During detailed engineering, co-ordinated relay settings shall be worked
out by the successful bidder and the calculations/time-charts shall be
submitted for approval to Owner/Consulting Engineer.
2.08.00 Trip Matrix required for implementing various class tripping schemes shall
be provided by the bidder and shall be indicated in block interlock
diagrams to be submitted.
2.09.00 The scope includes preparation and furnishing of settings, calculations,
installation, commissioning instructions and maintenance manual for all
protections with all operational feature/optional feature.
2.10.00 The scope includes preparation and furnishing softcopy as well as
hardcopy of five sets of all types of as built drawings including schematic,
internal external cable connection drawings, wiring/cable schedules,
electrical internal circuits indicating measuring points and measuring
values, relay data sheet, relay setting calculation.
2.11.00 The scope includes supply of wires, lugs, connectors, screws, nut bolts etc
required for retrofitting and other accessories which are necessary for
satisfactory operation of complete relay scheme though not individually or
specifically mentioned herein.
2.12.00 The disconnection of existing control wiring, indication, annunciation, CT,
PT connections from all the protection panels and removal of existing
relays, wires, terminal blocks etc. with proper tagging. Removal and
shifting of removed panel at place directed by engineer in charge.
2.13.00 Installation of New panel in place of existing removed panel including
shifting from storage with required mounting hardware, blanking plates,
Glands, earthing strip, relevant fabrication etc. with covering of remaining
portion of Cable trench including necessary civil work.
2.14.00 The scope includes wiring/terminations, grounding etc and also wiring
modifications to include all logic as per existing protection scheme.
2.15.00 Supply and mounting of all equipment as specified in this specification
together with such auxiliary equipment and materials as required. The
tenderer shall indicate make, type and designation of all equipments
2.16.00 Complete internal wiring of equipment and terminal blocks and wiring
between adjacent panels. Design and manufacture of relays and relay
assemblies to meet the requirement of various protection schemes,
specified in this specification or not.
2.17.00 The testing and commissioning of modified and retrofitted control and
relay panels including testing and commissioning of all relays including
supplied by gsecl for all functions/logics in totality and furnishing of test
2.18.00 The scope includes Commissioning of additional features /logics other
than existing scheme as per requirement with accessories and auxiliary
equipments if required.
2.19.00 Any defect arises in Panel , Communication equipments , Software , relay
auxiliary relay, GPS and found defective during commissioning at site
shall be replaced free of cost, which include transportation and re-
commissioning also.
2.20.00 The scope includes to time synchronize the supplied relays and
DR/SCADA PC with supplied dedicated GPS.
PUR-F-10 ET-248
2.21.00 The successful bidder shall be required to provide facility for training, at
no extra cost to the purchaser’s six to eight engineers in two batches from
GANDHINAGAR thermal power station to be nominated by the purchaser
for a period of at least two to three days at his works/at GSECL site as per
availability, where the equipment offered shall be manufactured. The
training shall cover familiarization with scheme, procedures of installation,
testing, commissioning, operation, maintenance and trouble shooting on
2.22.00 If the relay offered, is being designed and manufactured in collaboration
with any other manufacturer, the supplier shall provide facilities for the in-
plant training in the collaborators works.
2.23.00 In case of training within India, the to and fro travel expenses, lodging and
boarding charges as well as allowances for out of pocket expenses in
respect of the trainees, shall be borne by the Purchaser. However, the
supplier shall provide suitable facilities for lodging as well as to and fro
transport to place of training from the hotel/guest house.
2.24.00 The program of the training shall be mutually discussed and finalized by
the purchaser with suppliers.
2.25.00 Removal of all existing 6 nos. panels and any other associated works shall
be carried out by the bidder and will be under their scope of responsibility
including re termination, removal, fabrication, civil work as per system
requirement and as per directed by EIC.
2.26.00 Any other works and supply which could not be specified above but are
necessary to complete the job shall be the responsibility of the bidders.
2.27.00 Keeping in view, the above scope of work, the bidder shall furnish
sequence of activities to be carried out to avoid the generation loss, likely
to occur during above works. The bidder shall note that above work shall
be completed within shut down period of 20 Days. The bidder shall also
note that there may be uncertainty of Shutdown due to grid exigency.
However, no additional cost/ compensation on this account shall be
2.28.00 All work from commencement to completion shall be carried out in
accordance with applicable safety standards. The bidder shall strictly
comply with GSECL safety norms and ensure the use of appropriate
Personal Protective Equipment (PPE) at all times. In the event of any
unsafe practices or non-compliance, GSECL reserves the right to stop the
work at any time and impose penalties for violation of safety standards. No
extension of time shall be granted for completion of the work due to
stoppage arising from safety non-compliance.
2.29.00 Cable: - The cable requirement shall be assessed and finalized during the
pre-bid meeting. Armoured cables shall be used for all new installations
and for replacement of existing cables as per scheme requirements, subject
to approval of the Engineer-in-Charge (EIC). A quantity tolerance of +20%
shall be considered for cable requirements.
2.30.00 New Protection schemes not covered in the existing scheme (e.g., 100%
stator earth fault protection with injection unit requiring new CT
installation), the bidder shall arrange and supply all necessary materials,
including cables. Wherever shielded cables are required, the bidder shall
provide armoured shielded cables, subject to approval of the Engineer-in-
Charge (EIC). A quantity tolerance of +20% shall be applicable for cable
PUR-F-10 ET-248
3.00.00 SCHEDULE OF REQUIREMENT
3.01.00 The requirement of Panel, Relay and Communication network etc. to be
supplied against this specification and their required deliveries are given in
Commercial Terms and Conditions.
3.02.00 Delivery instructions shall be issued to the successful bidder after
placement of orders and after inspection and testing of Panels and relays
at manufacturer’s works.
3.03.00 Recommended spares:
The tenderer shall furnish in his offer, a list of recommended spare with unit rates
for PROTECTION PANELS that may be required for trouble free operation for a
period of 15 years. The purchaser reserves the right of selection of items and
quantities of these spares to be ordered.
3.04.00 Recommended tools, testing kits including laptop and test handles
The tenderer shall furnish in his offer a list of recommended testing kit, tools with
unit rates for PROTECTION PANELS those may be required during testing and
commissioning of said panel for off line as well as on line testing. The purchaser
reserves the right of selection of items and quantities to be ordered.
4.00.00 STANDARDS
4.01.00 Unless otherwise specified elsewhere in this specification, all equipment
and materials shall be designed, manufactured and tested in accordance
with the latest revisions of Indian Standards or British Standards and
International Electro-Technical Commission (IEC) Standard available at
the time of placement of order. The supplier shall submit the copies of the
relevant standards applicable to the relay.
4.02.00 Equipment meeting with any other standard, which ensures equal or
better quality, may be accepted. Where the equipment conforms to any
other standard, the salient points of difference between the standards
adopted and the above standards shall be clearly brought out in the
tender. A certified copy of such standard in English version shall be
submitted along with the bid.
4.03.00 The equipment shall also comply with the latest revision of Indian
Electricity Act and Indian Electricity Rules and any other applicable
statutory provisions, rules and regulations applicable in the locations
where these are to be installed.
5.00.00 CLIMATIC CONDITIONS:
5.01.00 The climatic and isoceraunic conditions at site are given below:
a Maximum ambient temperature (º C)
a Maximum ambient temperature in shade (º C)
b Minimum ambient temperature in shade (º C)
c Maximum daily average ambient temperature (º C)
d Maximum yearly average ambient temperature(º C)
e Relative humidity (%) 10 to
f Average annual rain fall (mm)
g Average number of thunder storms (days/year)
h Height above Sea level (Meters) Not exceeding
i Maximum wind pressure (Kg/m2)
PUR-F-10 ET-248
j Earth quake acceleration 0. 2 g to 0.3 g
5.02.00 The equipment offered shall be capable for continuous satisfactory
operation under the above conditions.
5.03.00 Since the equipment offered shall be used in the Thermal power station the
offered equipment shall be suitable for such atmosphere.
5.04.00 Equipment covered in this specification shall be suitable for indoor
5.05.00 Relays must have conformal coating which protects PCBs from moisture,
dust, chemical, heat & harsh environments.
6.00.00 GENERAL DESCRIPTION OF THE PROJECT:
6.01.00 The equipment specified herein will be installed at Gandhinagar Thermal
Power Station of Gujarat State Electricity Corporation Limited.
6.02.00 The site is located i.e. Gandhinagar TPS Located at about 30 KMs from
Ahmedabad Railway Station and about 20 KMs from Ahmedabad Airport.
The nearest Railway Station is Gandhinagar for Gandhinagar TPS.
6.03.00 The Generation voltage is 15.75kV, which is stepped up to 220 KV by
means of 3-phase Power Transformers (GTs). The connection between
generator terminals and GT would be by means of bus-duct up to 15.75kV
LT side terminals of GT.
6.04.00 The connections from the GTs to Take-off gantry would be by means of
overhead conductors. There are two Nos. 15.75 kV /7.0KV Unit Aux.
Transformers to cater auxiliary load per unit.
6.05.00 The existing protective functions and other diagram/detail will be provided
on demand as per bidder’s requirement and being appended to this
specification for the guidance of the bidders; however, bidders are advised
to get themselves acquainted with actual inputs at site.
7.00.00 GENERAL TECHNICAL REQUIREMENTS: PANEL
7.01.01 Existing Generator relay panel at Gandhinagar Thermal Power Station is of
Simplex type. The schematic of the existing panel will be provided during
designing and party has to visit and confirm scope of work. The existing
complete panel (all existing six nos. of panels) shall be removed and the
new panel to be supplied at Gandhinagar TPS shall be designed to have
matching dimension and colour shade with existing other panels to house
all required relays, equipments, accessories etc. as specified in this
specification for both units of Gandhinagar Thermal Power Station.
7.01.02 Panel shall be completely metal enclosed and shall be dust, moisture and
vermin proof to meet the requirement of IP 51 of IS:
7.01.03 The panel shall be free standing , floor mounting type, and shall comprise
rigid , welded structural frame enclosed completely with specially selected
smooth finished cold rolled sheet steel of thickness not less than 3.0 mm
for load bearing members ( Front Panel , base frame , door frame) and
mm for non-load bearing members ( side panel , cubicle roof , door). There
shall be sufficient reinforcement to provide level surfaces, resistance to
vibration, and rigidity during transportation and installation.
7.01.04 All doors and removable covers shall be gasketed all round with neoprene
gaskets, ventilating louvers with screen and filters.
PUR-F-10 ET-248
7.01.05 Design, material selection and workmanship shall be such as to result in
neat appearance inside and outside with no weld, rivets or bolt heads
apparent from outside and with all exterior surface true and smooth.
7.01.06 Cable entries to the panel shall be from the screwed type removable bottom
plates of the panel.
7.01.07 The panel should be completely wired and to be fixed with all accessories
like Relays , Auxiliary relays , TBs , ( Disconnecting type TBs with shorting
arrangement for CT , PT) , Earthing Bus , Terminal connection for CT – PT
Cables, Switches, LED type Illumination, space heaters, Power sockets,
Connection to Relays, Ethernet switch, Computer etc.
7.02.00 AUXILIARY SUPPLY:
7.02.01 The bidder will have to reconnect the existing AC / DC supply for
Switches, Panel illumination, space heater etc. and supplies for control
and protections of existing panels. Bidder will have to remove existing
panels of auxiliary DC supply and provide same DC changeover scheme
with all necessary arrangements in NEW panel.
7.02.02 The relays shall be suitable for 220-250V (+10 % to -15%) DC supply.
7.03.00 PANEL INTERNAL WIRING
7.03.01 All wiring shall be carried out with 1100V grade single core multi strand
flexible copper conductor wires with HRPVC insulation and shall be flame
retardant, vermin and rodent proof. The current carrying capacity of wire
shall be adequate for the duty assigned to it considering short circuit
condition and shall have sufficient flexibility to facilitate proper
termination at any location. Colour coded wires (red, yellow, blue, black)
shall be used for CT, VT and CVT secondary connections. The copper
conductor used for internal wiring be as follows:
a) All circuits except instrument transformer circuit of 1.5 Sq mm per
b) CT circuit - one 4 Sq mm per lead.
c) VT/CVT circuits one 2.5 Sq mm per lead.
d) Energy metering – 4 Sq mm per lead for both PT & CT circuits.
7.03.02 Auxiliary bus wiring for AC and DC supplies voltage transformer circuits,
annunciation circuits and other common circuits shall be provided near
the top of the panels running throughout the entire length of the panels.
7.03.03 The wire numbers shown in the wiring diagram shall be in accordance
with IS375/BS152/BS156. All wires directly connected to trip circuit
breaker or devices shall be distinguished by addition of a red coloured or
lettered ferrule. Number 6 and 9 shall not be used.
7.03.04 Panel wiring shall be securely supported, neatly installed by lacing and
tying, readily accessible and connected to equipment terminals and
terminal blocks. Flame retardant, plastic wiring channels/troughs with
strap on plastic covers shall be used for this purpose. Sufficient space in
channel for modification of wiring shall be kept.
7.03.05 Accidental short circuiting of certain wires is likely to result in malfunction
of equipment, such as closing or tripping of a breaker or positive and
negative wires, these wires shall not be terminated on adjacent terminal
7.03.06 The unused space on the front or rear of the panels shall be kept clear of
wiring to facilitate addition of devices without rewiring associated portion
7.03.07 Wire termination shall be made with solder less crimping type of tinned
copper lugs which firmly grip the conductor. Insulation sleeves shall be
PUR-F-10 ET-248
provided at all the wire terminations. Engraved core identification plastic
ferrules, marked to correspond with panel wiring diagram shall be fitted at
both ends of each wire. Ferrules shall fit tightly on the wire and shall not
fall off when the wire is disconnected from terminal blocks.
7.03.08 The bidder shall be responsible for the completeness and correctness of
the internal wiring and for the proper functioning of the connected
7.03.09 Terminations on T.B. shall be grouped function wise on one region of T.B.
(may not be full T.B) to take outlet connections in one cable for the
7.04.01 All front mounted equipment as well as equipment mounted inside the
panels shall be provided with individual labels with equipment designation
engraved. The labels shall be mounted directly below the respective
7.04.02 All the front mounted equipment shall also be provided tag numbers
corresponding to the ones shown in the panel internal wiring to facilitate
each tracing of wiring. These labels shall be mounted directly by the side of
the respective equipment and shall not be hidden by the equipment wiring.
7.04.03 Labels shall be made of Aluminium anodized plate P.V. Castings. Labels
shall have white letters on black background. All relays shall be given
standard abbreviation numbers with name of device, corresponding to the
ones shown in the panel internal wiring.
7.05.00 EARTHING
7.05.01 All metallic cases of relays, instruments and other mounted equipment
shall be connected to earth bus by copper wires of size not less than
sq. mm. The colour of the earthing wire shall be green.
7.05.02 Looping of earth connections which would result in loss of earth
connection to other devices when the loop is broken shall not be permitted.
However, looping of earth connections between equipment to provide
alternative paths, to earth bus shall be provided.
7.05.03 VT, CVT and CT secondary neutral or common lead shall be earthed at one
place only. Such earthing shall be made through links, so that earthing
may be removed from one group without disturbing continuity of earthing
systems for other group.
7.05.04 A separate earthing point shall be provided in the panel for cable screens
of static equipment, insulation between two earths prior to connections of
the two earths to the Purchaser’s earthing grid, shall withstand a test
voltage of 500V for 1 minute (or higher insulation resistance of not less
than 1 meg-ohms at 500V) connection between the screen terminals and
the screen earth – point shall be jumper wires. Connection of this earth
point to the station earth shall be carried out by Purchaser.
7.06.00 INDICATING LAMPS
7.06.01 Indicating lamps shall be of LED type suitable for panel mounting with
series resistors preferably built in the main assembly to avoid short
circuiting of control supply in the event of short circuit of lamps. The
lamps shall be rated for 220VDC unless otherwise specified. Lamp covers
shall be of screwed type, unbreakable and moulded from heat resisting
material and shall be translucent to diffuse light & coloured as specified.
PUR-F-10 ET-248
7.07.00 INTERIOR LIGHTING
7.07.01 The panel: shall be provided with LED type lighting fixture rated for 240V
AC supply, controlled by panel door switch and fuse. The number of such
lighting fixtures shall be 1 no. per panel.
7.07.02 The panel shall be provided with 240V, 50Hz. 15 A, 3 pin universal socket
with switch. The socket with switch shall be mounted inside the panel at
convenient location.
7.08.00 TERMINAL BLOCKS
7.08.01 Terminal blocks shall be 1100 V grade, 45 amps rated, one piece moulded,
complete with insulated barriers, stud type, melamine housing brass
terminals, washers, brass nuts and brass lock nuts and identification
strips. Markings on the terminals strips shall correspond to wire number
on the wiring diagrams. Not more than 2 wires shall be connected to any
7.08.02 Terminal blocks for CT, CVT and VT secondary leads shall be provided
with test links and isolating facilities. CT secondary wiring should be such
that it can connect additional circuit in series.
7.08.03 All spare contacts and terminals of the panel mounted equipment and
devices shall be wired up to terminal blocks with ferrule numbers starting
7.08.04 Unless otherwise specified, terminal blocks shall be suitable for connecting
the following conductors of purchaser’s cables on each side.
i) :All DC and auxiliary AC circuits -- minimum one of 2.5mm2 copper
ii) :All CT & PT circuits -- minimum two of 2.5mm2 copper
7.08.05 Moulding materials shall be self-extinguishing or resistant to flame
propagation, substantially non hydroscopic and shall not carbonized when
tested for tracking. The insulation between any terminal and frame work
between adjacent terminals shall with stand test of 2KV RMS for one
minute. The moulding shall be mechanically robust to withstand handling
while making terminations.
7.08.06 Easily removable Protective transparent plastic covers for placing over the
live parts of the terminal blocks shall be provided invariably.
7.09.00 PAINTING
7.09.01 All sheet steel work shall be phosphated in accordance with the following
procedures and in accordance with IS; 6005 `Code of Practice for
phosphating iron and steel’.
7.09.02 Oil, grease, dirt and swart shall be thoroughly removed by emulsion
7.09.03 Rust and scale shall be removed by pickling with dilute acid followed by
washing with running water, rinsing with slightly alkaline hot water and
7.09.04 After phosphating, through rinsing shall be carried out with clean water
followed by final rinsing with dilute bi-chromate solution and oven drying.
7.09.05 The phosphate coating shall be sealed by the application of two coats of
ready mixed, stowing type zinc chromate primer. The first coat may be
`Flash dried’ while the second coat shall be stowed.
7.09.06 After application of the primer, two coats of finishing synthetic enamel
paint shall be applied, each coat followed by stowing. The second finishing
coat shall be applied after completion of tests. The panel/sheet shall have
PUR-F-10 ET-248
colour confirming to shade of existing panel on outside & doors while white
7.09.07 Each coat of primer and finishing paint shall be of a slightly aesthetically
pleasing appearance free from dirt and uneven surface.
7.09.08 The bottom plate shall be painted with an anti-corrosive paint.
7.09.09 The paint thickness shall be 60-100 microns for powder coating.
7.10.00 MOUNTING
7.10.01 All equipment on front of panel shall be flush mounted.
7.10.02 Relays shall be mounted such that removal and replacement can be
accomplished individually without interruption of service to adjacent
7.10.03 No equipment shall be mounted on the doors without prior approval of the
8.00.00 GENERAL TECHNICAL REQUIREMENTS :RELAYS
8.01.00 The general requirements for the protective relays are described here
under however; all relays shall in general comply with the technical
specifications mentioned under clause 11.00.00 “Principal Technical
8.02.00 All relays shall confirm to the requirements of Standards listed as per IS:
3231/IEC-60255 or other applicable standards. Equipments meeting any
other authoritative standard, which ensures equal or better quality than
the standards mentioned shall also be acceptable. Equipment for which
Indian Standards are not available, the relevant British standards and IEC
recommendations will be applicable. Please attach photocopy of all such
standards according to which the equipment has been offered.
8.03.00 Relays shall be suitable for flush mounting on the front with connections
8.04.00 All protective relays shall be with proper on line testing facilities without
isolation from TB where inputs viz CT/ PT and DC are wired. All main
relays shall be provided with test plug to test the relay on line. Necessary
test plugs/ test handles per panel shall be supplied loose and shall be
included in contractor’s scope of supply.
8.05.00 All AC operated relays shall be suitable for operation at 50 Hz. AC voltage
operated relays shall be suitable for 110V VT secondary and current
operated relays for 1or 5 Amps. CT secondary. All DC operated relays and
timers shall be designed for the DC voltage specified, and shall operate
satisfactorily between 80% and 110% of rated voltage. Voltage operated
relays shall have adequate thermal capacity for continuous operation
8.06.00 Supervision relays having sufficient nos. of contacts for annunciation,
blocking and permissive function etc., to supervise healthiness of Auxiliary
supply, PT supply, voltage balance scheme, Trip relay healthiness, and
Trip circuits shall form part of the scheme to be supplied.
8.07.00 Bidder has to provide auxiliary relays as per existing requirement plus
minimum 10% extra relays for future use must be installed in supplied
8.08.00 Bidder has to make sure that all external tripping must be via auxiliary
relays only and each auxiliary relays having minimum 4 nos of contact.
PUR-F-10 ET-248
8.09.00 Any other requirement which is not specify in tender and required for
system reliability/requirement observed by Engineer in charge than bidder
has to provide that without any obligation at free of cost.
8.10.00 The protective relays shall be suitable for efficient and reliable operation of
the protection scheme described in the specification. Necessary auxiliary
relays and timers required for interlocking schemes, multiplication of
contacts, monitoring of control supplies and circuits, lockout relay
monitoring circuit etc. shall be provided.
8.11.00 All protective relays, auxiliary relays and timers except the lockout relays
and interlocking relays specified shall be provided with self-reset type
contacts. All protective relay and timers shall be provided with externally
hand reset positive action operation indicators with inscription.
8.12.00 Built-in hand-reset operation indicators shall have additional auxiliary
relays with operating indicators (flag relays) for this purpose.
8.13.00 No control relay which shall trip the power circuit breaker when the relay
is de-energized shall be employed in the circuits.
8.14.00 Any alternative/ additional protections or relays considered necessary for
providing complete effective and reliable protection shall also be included
in the scope of supply.
8.15.00 Provision shall be made for easy isolation of trip circuits of each relay for
the purpose of testing and maintenance.
8.16.00 The setting ranges of the relays offered, if different from the ones specified
shall also be acceptable if they meet the functional requirements.
8.17.00 All relays and their drawings shall have phase indications as R-Red, Y-
Yellow and B-Blue.
8.18.00 Wherever numerical relays are used, the scope shall include the following:
8.18.01 The relay shall have Ethernet / USB / RS232 on front side for
communication with Laptop/Desktop and on rear side RS485 /
Ethernet / USB / fibre optic port shall be provided for rear
communication. Necessary converter for communication with
PC / Laptop shall be part of scope of supply.
8.18.02 Necessary licensed copy of software and hardware to
upload/download the data to/from the relay from/to the
personal computer installed in the power station shall be
provided. Relay shall be looped by Fibre Optic/ twisted wire
Cables up to PC (DR work station).
8.18.03 The relay shall have suitable communication interface on rear
side for the IEC 61850 standard for station communication.
8.18.04 The relay shall be supplied with IRIG port / fibre optic /
Ethernet for time synchronisation with supplied GPS. The relay
shall also have facility for time synchronisation through min.
two different protocols.
8.18.05 The relay shall have sufficient no. of Analogue Inputs for CT –
VT of suitable rating to include all protection functions intended
in this specification.
8.18.06 The software shall be suitable for operations like switching,
retrieval of information or changing of setting groups, retrieve
oscillographic fault data from the relay memory and to store
fault record data as oscillographic records in standard
COMTRADE format or other latest standard format. The
software shall be suitable to provide oscillographic data into
several different graphical representations that can be used to
PUR-F-10 ET-248
analyse the fault or event captured by the relay. It shall also be
possible to calculate additional values from the captured signals
and displaying analogue curve with time base phasor diagrams,
locus diagrams, harmonic graphs etc. Automatic upload of DR
files should be possible.
8.18.07 The relay shall be supplied with all the original customized
licensed software, IO Cards, required cable for local or remote
communication, disturbance uploading, disturbance evaluation
8.18.08 The offered relay must be compliant with latest applicable and
prevailing cyber security norms in accordance with the
requirements of this tender. The offered relay shall be of the
latest proven technology, conforming to all applicable and
prevailing norms, and shall be suitable for long-term reliable
8.18.09 Relays must have conformal coating which protects PCBs from
moisture, dust, chemical, heat & harsh environments.
8.19.00 All not used terminal shall also be provided with screws washers, lugs etc.
as for used terminal.
8.20.00 The type test offered for relay shall be supplied with full options of
protection and control functions mentioned in the catalogue.
9.00.00 GENERAL TECHNICAL REQUIREMENTS: SCADA
SCADA SYSTEM for Gandhinagar Thermal Power Station
At Gandhinagar Thermal Power Station Unit-3 & 4, all supplied relays
shall be interfaced with two separate systems, namely a Dedicated DR
Workstation PC and a Dedicated SCADA PC. The DR Workstation PC shall
be used for disturbance record downloading, relay parameterization,
settings management and analysis. The SCADA PC shall be used for
monitoring, event logging, graphical display, status indication and
metering functions without control operation. Both PCs shall be supplied
by the bidder along with all necessary software, hardware, communication
interfaces, networking accessories and licensed applications.
9.01.00 The DR work station should be able to communicate with all relays for DR
downloading, viewing, Parameterisation etc.
9.02.00 The OEM’s SCADA application software must be suitable to all relay and
interface for viewing status of field equipments like Isolators, Circuit
breakers etc. and viewing parameters in the Single line diagram graphic
prepared in the software supplied.
9.03.00 The SCADA software must have same make of supplied relay & you have
to approve by EIC before supply.
9.04.00 The software should have latest OS window based platform.
9.05.00 The system should have event history recording and retrieving capability.
9.06.00 The time resolution for event recorded should not be more than 1 ms.
9.07.00 The protocol used should be open protocol for communication. If the
protocol used is of proprietary nature then use of Open protocol should
also be possible without major changes & free lifelong licence.
9.08.00 No. of binary inputs and binary outputs for field equipments (i.e. breaker,
isolator, switches etc.) status will be as per scheme requirements plus 10%
as spare for each unit at Gandhinagar TPS Unit-3&4.
PUR-F-10 ET-248
9.09.00 No. of circuits for which metering parameters to be monitored in SCADA
are 100 and accordingly no. of analogue points shall be suggested by
bidder. The bidder shall also Indicate clearly the method of connection, CT-
PT input, required equipments etc. as per site requirement.
9.10.00 Necessary PC, interfacing equipments, cable, Software, hardware &
accessories, furniture, panel etc. shall be part of this system.
9.11.00 Licensed version of OEM SCADA software, Operating system, Office
application, antivirus with original media software shall be part of the
9.12.00 Bidder must approve exact detail of software and required hardware with
its features, facilities and application with offer.
9.13.00 The bidder should furnish configuration and specification of PC, Hardware,
interfacing equipments etc. with bid. The specification should be such as
to suit the existing requirement of the project; however the same will have
to be approved from GSECL before finalisation of requirement in detail
9.14.00 The software should have capabilities to create user defined graphics
having desired input configuration in the created screen depending on
9.15.00 The interfacing hardware & software should be expandable to suit addition
of future requirement of binary input.
9.16.00 Suitable capacity of UPS having inbuilt battery set and sufficient back up
shall be supplied for SCADA equipments and PC.
9.17.00 The bidder should submit clear bill of material required for the proposed
data acquisition system with schematic and on basis of which requirement
shall be finalised in detail order.
9.18.00 All the equipment except field equipments, supplied should be properly
housed in a suitable IT rack or panel.
9.19.00 Necessary cabling including supply for binary input for status shall be in
the scope of bidder; the successful bidder shall provide sufficient technical
information for the same during execution.
9.20.00 Required cable for communication from relay, interfacing panel, PC,
networking equipment etc and cables required for status indication in
SCADA including supply, laying, termination shall be in the scope of
9.21.00 The bidder should demonstrate the offered scheme at site if demanded by
9.22.00 Procurement shall be finalised on the basis of evaluation of performance
and applicability of the system for software and hardware offered.
9.23.00 Server Make – HP/DELL with 3 year warranty
Tower Type Server computer prefered
1x Intel Xeon Silver 4410Y or I7 13th Generation or higher or
similar for server requirement
1x HPE 32GB 2Rx8 PC5-4800B-R Smart Kit (32 DIMM) preferred
HPE 1TB SATA RI SFF BC MV SSD – 2 Qty with 3-year warranty
Windows Server 2022 or Windows 11 pro or compatible latest OS
with back up CD
Latest Microsoft Office licence version
Latest Antivirus with 3 year license
PUR-F-10 ET-248
Monitor 23.5” FHD
USB Keyboard and Mouse
UPS for Server with minimum 20 minutes power backup
Fire wall – Sonicwall/ Fortinet with 1 year warranty if required
Ethernet Ports: 8x1GbE
10.00.00 DETAILS OF INSTRUMENT TRANSFORMRS, POWER
TRANSFORMRS AND GENERATOR of GTPS Unit-3 &4.
10.01.00 All available technical details—including specifications of Current
Transformers (CTs), Potential Transformers (PTs), power transformers,
generators, existing protection schemes, relay settings, and any other
relevant system data—pertaining to Gandhinagar Thermal Power Station
Units 3 & 4 shall be provided to the bidder for the purpose of detailed
engineering study.
Bidders can visit the plant to understand the existing installation and
collect necessary information. A pre-bid meeting or site visit shall be
arranged by the GTPS upon the bidder’s request to facilitate clarification of
technical queries and ensure proper understanding of site conditions.
11.00.00 PRINCIPAL TECHNICAL PARAMETERS OF RELAY & SCHEME.
11.01.00 The protective gear shall be as fast in operation as possible, so as to
maintain the maximum stability under fault conditions. The protective
scheme shall provide suitable protection for the individual equipment and
at the same time ensure proper operation of the entire protective system as
a coordinated whole. Various protective systems shall be designed to
isolate only the faulty circuits and to avoid Indiscriminate tripping of
healthy circuits. The protective scheme shall not be susceptible to
incorrect operation as a result of transient phenomenon, which may arise
during disturbances on the system.
11.02.00 The experience on various power systems in India has shown that a great
majority of system faults originate as earth faults, the no. of phase faults
being comparatively small. Special attention shall therefore, be given to the
problem of providing a reliable and high-speed earth fault protection. The
phase faults should also be cleared in minimum possible time in order to
minimise damage and to maintain synchronous stability.
11.03.00 All auxiliary relays, matching CTs, PTs and various timer relays etc. to
complete the protection scheme, shall be part of the bidder's scope of
supply. The successful bidder shall also recheck parameters of CTs and
11.04.00 The electrical protection scheme proposed to be adopted for unit
comprising of generator, GT & Aux. Transformer shall have following
11.05.00 The protection system shall comprise pre-engineered modular or discrete
self-contained system comprising multifunction numerical relays
(interfaced with computer system for Gandhinagar Thermal Power Station).
In addition to the relays/protections mentioned in this specification, any
additional protections/relays considered necessary by the Bidder for his
system shall be included and offered by the Bidder. Licensed software to
read, set, configure and analyse the relay shall also be supplied. (Along
with Computer system at GTPS free of cost).
11.06.00 DC auxiliary supply shall be supervised by supply supervising relays. The
NC contact of the relays shall be delayed on drop off by approximately
PUR-F-10 ET-248
to 200 m sec. for annunciation in CRT / Generator control desk. The relay
shall be provided with flag indicators wherever required. Supervision of
GRP DC supply availability (DC supervision relay) shall be provided.
11.07.00 The relays shall be provided with continuous self-diagnostic facilities to
indicate the location of the failed component when pre-engineered
protection system is offered. Apart from this, facilities for comprehensive
testing with external test kits shall also be provided.
11.08.00 In addition to the contacts required as per schemes, Contractor shall wire
out to the terminal block at least two NO & two NC spare contacts of each
11.09.00 The protection scheme shall include all the necessary contacts to achieve
the functions required, alarms in CRT, annunciation windows, sequence
event recorder and for Control room control panel annunciation wherever
required. Contact multiplication relays for generator circuit breaker, UAT-
A&B circuit breaker, Field Breaker and associated isolators shall be
provided for this purpose.
11.10.00 Additional Features
The relay shall have a local friendly password-protected user man-
machine interface (MMI) comprising of a 4-5 line alphanumeric
LCD/LED display and a soft touch key pad to access the settings,
events and records in the relay.
Optically isolated inputs & outputs (digital & analog)
Digital signal processing
Built-in circuit breaker failure protection
Monitoring of CB trip circuit, CB condition and status
Monitoring & alarming of DC failure, coil failure, other aux. tripping of
UAT, GT & Gen. and voltage balance scheme.
Supervision of CTs & VTs
Complete mechanical/electrical & atmospheric environmental
protection/immunity as per relevant standards.
The protection system shall have facility to synchronize its time
generator from dedicated GPS system for time synchronization. One
dedicated master clock of GPS system shell be provided for Gandhinagar
The protection system shall have programmable scheme logic, multiple
setting groups, programmable settings and programmable
characteristics.
The relays/protection system shall have in-built facilities to measure
electrical instantaneous & integrated quantities, event & fault
records/disturbance records.
Required support software for realizing full capabilities of the protection
system including programming of settings, scheme logic &
characteristics, viewing of measurements, fault diagnostics,
disturbance/fault records, depending trends & historical data, fault
analysis etc. , shall be part of supply.
Note: The specification mentioned above are as per general
technical requirement however, the bidder may offer as per their
standard product. The any deviations to this general specification
will be allowed at the sole discrimination of GSECL
11.11.00 GENERATOR PROTECTION:
PUR-F-10 ET-248
It should minimum cover following protections
Differential protection-87G.
Inter turn Differential protection -87GI.
Impedance Protection by Distance protection Zones- 21G
Negative phase sequence protection -46G
Loss-of-Excitation protection with provision for instantaneous trip-
Pole Slip Protection- 98G
Low forward power protection -37G1 and 37G2
Power Decay Relay-37
Reverse power protection 32G
Thermal Over Load protection- 49 G
Over Current Protection -50 O/L
Dead Machine protection- 94G
100 % Stator earth fault protection (both 0-95% and 95-100%) -
Standby Stator Earth Fault protection.-64G2
Inter Turn Protection -95G
Generator over voltage protection -59G. (High set , Over speed)
Generator Under Voltage Protection – 27G
Over and under frequency protection- 81GU & 81GO
1st Rotor Earth Fault Protection-64 F1 (Rotor E/F Alarm)
2nd Rotor Earth Fault Protection-64 F2 (Rotor E/F Trip)
Gen overload-51G
DC failure for source-I&II
11.12.00 GENERATOR TRANSFORMER PROTECTION
It should minimum cover following protections
Restricted Earth Fault Protection -64 GTR
Over-flux protection-99GT.
Non Directional back –up Over Correct Protection- 51GT
Non Directional back up neutral over-current protection- 51GTN
Interlocked Over Current Protection
Local Breaker Backup
11.13.00 GENERATOR, UAT AND GENERATOR TRANSFORMER PROTECTION :
It should minimum cover following protection
Over All differential protection -87GT
Restricted Earth Fault Protection
11.14.00 UAT PROTECTION:
UAT-A and UAT-B over Current Protection.
UAT-A and UAT-B Earth fault Protection.
UAT-A and UAT-B Differential protection.
11.15.00 Shall have following Facility in 100% stator Earth fault injection
In service / faulty (Self Supervision) LED / Flag should be there.
Make must be SIEMENS/GE.
PUR-F-10 ET-248
Auxiliary supply 220V DC.
This unit work on Low frequency injection method must be
compatible with Generator Protection Relay (a).
This protection must be stable on external fault.
11.16.00 Shall have following minimum Specification of Lockout relays.
Auxiliary supply 220V DC.
Heavy duty latch contact (16N/O + 4N/C) relays and (14N/O +
6N/C) relays for both unit including spare with model no
MVAJM25 or similar. Nos. of relays as per scheme requirement
and suggested by EIC.
Relay operated Flag must be provided.
Relay must come with robust case.
11.17.00 PROTECTION SCHEME PERFORMANCE REQUIREMENTS:
11.17.01 GENERATOR PROTECTION
(a) GENERATOR DIFFERENTIAL PROTECTION (87-G):
This protection is to detect multiphase faults in the generator. The
protection shall be high speed and immune to AC transients. The
relay shall not mal-operate due to harmonics in the spill currents
produced due to saturation of CTs during heavy through faults and to
limit voltage across the relay in the event of heavy internal fault
causing CT saturation. It shall be based on a three-phase high
impedance / low impedance circulating current principle selectable at
(b) GENERATOR BACK-UP PROTECTION (21 G):
The system back-up protection against all types of un cleared faults
in generator, main transformer & 220 KV line shall be provided by
means of a three phase two stage under impedance protection with
offset mho characteristics. Suitable time delay timers shall be
provided for grading with other devices. The element shall not operate
under maximum load conditions.
(c) NEGATIVE PHASE SEQUENCE PROTECTION (46G):
The negative phase sequence protection against rotor overheating
shall be provided by a two-stage true thermal replica relay. The
protection shall have a long inverse time characteristics and shall be
provided in each phase of the machine. The time characteristics of
the relay shall be adjustable to match I22t characteristics of the
machine. It shall be provided with thermal memory to take care on
repeated periods of unbalanced loading. The relay shall provide two
stages, one for alarm and one for trip. The alarm stage shall have a
definite time delay setting for giving early warning of an unbalanced
condition that may lead to generator tripping. The second stage for
tripping shall be based on a true thermal characteristic and shall
have adjustable time current characteristics that must be matched
with negative sequence current withstand characteristics of the
generator. A definite minimum time setting shall be provided to
ensure an adequate grading margin between the operation of the
negative phase sequence element and any downstream protection
that may respond to unbalanced faults.
(d) LOSS OF EXCITATION RELAY (40 G):
This protection function shall detect the failure of generator
excitation. It shall be provided with an adjustable, offset circular
PUR-F-10 ET-248
impedance characteristic with an adjustable tripping delay timer and
an adjustable measuring element reset time delay. The field failure
characteristic shall enclose as fully as possible the impedance orbit
corresponding to that of the asynchronous condition; however the
characteristic should be clear of the power swing loci and the limiting
generating point of the machine when under excited. The element
shall have a provision to issue an instantaneous tripping, if the
terminal voltage of the machine falls drastically The element shall
have an under voltage check feature.
(e) GENERATOR POLE SLIPPING PROTECTION (98 G):
The loss of excitation protection should be supplemented by an out of
step relay which detects slipping of poles. The relay shall be capable
of detecting a power swing which can lead to instability in addition to
its ability to detect an actual pole slip.
The pole slipping protection shall be based on apparent impedance
measurement using Blinder and Lenticular Characteristic
(adjustable). If the measured impedance as seen at the generator
terminal crosses the two halves of the lens characteristic and spends
longer than a specified time in each half a pole slip is encountered.
The timer range and lens characteristics shall be adjustable to suit
the network requirements. Two zones shall be created in the
characteristics by a reactance line which can clearly distinguishes
between pole slip occurring with a system centre with in the power
system or in the generator. Reliable detection of the first and
subsequent pole slips of the generator shall be achieved through
separate and adjustable counters to be provided for each zone. Pole
slipping protection operating on some other principle shall also be
acceptable provided it has given satisfactory service.
(f) LOW FORWARD POWER PROTECTION (37G):
The purpose of this protection is to detect a unit running at low active
power indicating fault in increase load sequence. This threshold
depends on turbine characteristic and tripping is usually delayed.
Suitable interlock shall be provided for operation during synchronous
condenser mode.
(g) REVERSE POWER PROTECTION (32G):
Reverse power relay will be used to initiate tripping in case of
motoring of machine or turbine trip. A three phase reverse power
element with a short time delay stage interlocked with turbine
tripping and a long time delayed stage independent of turbine
tripping shall be provided. The relay shall have a provision of
sensitive directional reverse power element such that sensitive
reverse power setting of 0.5% of rated power can be achieved.
Suitable provision shall be made to prevent the operation of this
element during machine start-up and synchronizing conditions.
(h) STATOR THERMAL OVER LOAD PROTECTION (49G):
This protection shall be used as an additional check of the stator
winding temperature against excessive heating due to very high
continuous overload current (thermal replica). The protection relay
must match the machine characteristics with an inverse time thermal
replica response defined by the generator supplier.
(i) OVER LOAD PROTECTION (50G):
The relay shall be single pole type having continuously adjustable
current setting range of 50-200 % and an adjustable time setting
PUR-F-10 ET-248
range 0.5 to 60 secs for givingalarm on the onset of overload. The
relay shall have a drop off/pick up ratio greater than 95 %.
(j) DEAD MACHINE ENERGISATION PROTECTION (94G):
A three phase high speed relay shall be provided for protection
against inadvertent energization of the machine at standstill. It shall
comprise of a three phase over current relay with a range 0.1 to 4In
to initiate tripping if generator terminal voltage in all three phases
falls below a set threshold value. The under voltage threshold setting
shall be variable from 0.2 to 1.0 Vnom. A pick-up timer shall be
provided to prevent initiation of the element on event of close-up
three phase faults. A drop-off timer with a setting of 500 ms shall
ensure that the under voltage detector does not reset following
accidental energisation.
(k) STATOR EARTH FAULT PROTECTION (64 G1):
Generator neutral will be connected to earth through a earthing
transformer, the secondary side of which is connected across a
resistor. The stator earth fault relay shall be connected across
secondary of transformer. Protection consisting of 0-95% & 95-100%
stator winding fault detection shall be provided. The protection
should be insensitive to external faults, transients and inherent
harmonics.0 TO 95% STATOR EARTH FAULT PROTECTION:
• For coverage of faults within about 95% of the stator winding or
better, a sensitive neutral voltage displacement function shall be
provided. The element shall be tuned to the fundamental frequency.
The element shall have a DT/Inverse time characteristic.
95 to 100% STATOR EARTH FAULT PROTECTION :
(a) Third harmonic Under voltage
• Protect 100% stator winding against earth fault in combination with
the 95% stator earth fault protection.
• Be sensitive to external faults, transients and inherent harmonic
• Shall operate on the principle of detection of change in the
magnitude/ distribution of stator 3rd harmonic voltages caused by
stator earth fault.
• Have time setting range from 0 to 100 sec. In steps of 0.01 secs.
(b.) Stator E/F protection using Low frequency injection principle
• 100% Stator Earth fault protection shall be provided by low
frequency injection principle thereby providing protection for
generator during standstill, startup and running conditions.
(l) OVER VOLTAGE PROTECTION (59 G):
This protection is designed to protect the generator against over-
voltages generated internally or externally and liable to damage the
machine.The element shall comprise of two stages, each separately
adjustable of over voltage with threshold variable from 100% to 140%
of rated voltage. The phase – phase voltage shall be measured by the
relay to prevent the element operating during rise of voltage on
downstream earth faults. The first and second stages shall have
variable time delay setting ranges of 0.5 to 5 sec and 2 to 20 sec
respectively. The relay shall have a drop-off to pick up ratio greater
(m) GENERATOR UNDER FREQUENCY / OVER FREQUENCY
PROTECTION (81U/O):
PUR-F-10 ET-248
This protection element shall prevent the running of the generating
unit from exceeding the permissible operation time at above or below
the set frequencies. Five stages of frequency protection shall be
provided. Each stage shall be independently settable as under
frequency or over frequency protection. The time delays for each stage
shall vary from 0.1 to 20 sec in steps of 0.1s. The frequency setting
range shall be variable from 45 Hz -55 Hz in steps of 0.1 Hz.
(n) ROTOR EARTH FAULT PROTECTION (64R):
This shall detect the rotor earth fault by the injection of ac low voltage
between the winding of the protected synchronous machine and the
ground providing two independent time delayed thresholds for the
resistance with measurement display. The AC injected input shall be
able to trip the system based on the injected over current or Over
voltage conditions. In case of opening of the field, there shall be a
separate provision of DC injection to detect under/over voltage and
provide tripping. The protection shall be provided which shall be of
Numerical type (Inbuilt or external to the comprehensive Generator
protection relay).
(o) INTER TURN FAULT PROTECTION (95G)
The purpose of this protection is to detect a fault between the
windings of the same phase for generators made up of several circuits
in parallel. This function shall be performed by a time delay over-
current protection connected between the natural points of each
parallel winding. According to the alternator specification, if the
generator has only common neutral of parallel circuits for each phase
brought out, the interturn fault protection shall be based on zero
sequence voltage measurement.
(p) Under Voltage function (27G)
11.17.02 GENERATOR TRANSFORMER PROTECTION:
(a) RESTRICTED EARTH FAULT PROTECTION – 64GTR:
The Restricted Earth Fault protection function shall be provided to
protect the HV winding of generator transformer against internal
faults for protected zone
Be single pole type
Be high / low impedance differential protection (Selectable at site)
Be high speed circulating current type
Be tuned to the system frequency
Be high speed with typical operating time of less than 30 ms at
Be stable for through fault & provision for preventing CT saturation,
harmonics and DC transients
Have current setting of 10-40% of rated current
Be suitably protected against high voltages.
The restricted earth fault protection shall be configurable as either
high impedance or low impedance biased differential at site.
(b) OVER FLUX PROTECTION (99 GT):
The over flux protection shall be provided to safeguard the
transformer against the operation at flux densities which may cause
damage to the core.
PUR-F-10 ET-248
Operate on the principle of voltage to frequency ratio and shall be
phase to phase connected.
Have inverse time characteristics, matching with transformer over
fluxing withstand capability curve.
Provide an independent `alarm’ with the time delay continuously
adjustable between 0.1 to 6 seconds.
Tripping time shall be governed by v/f vs. time characteristic of the
V/F setting shall be adjustable from 1.0 to 1.5 times rated flux.
Have a set of characteristics for various time multiplier settings. The
maximum operating time of the relay shall not exceed 3 seconds and
1.5 seconds at `V/F’ values of 1.4 and 1.5 times of rated values
have an accuracy of operating time, better than ± 10% Have a
resetting ratio of 95% or better, rated voltage 110V AC. 50Hz..
Provide sufficient number of potential free contacts to cater the needs
of connection to alarm annunciation. Data acquisition and optional
trip facility to be connected by purchaser where needed Includes
hand reset LED for Alarm & Trip operated indication.
(c) NON-DIRECTIONAL BACK UP GT OVER CURRENT PROTECTION
WITH HIGH SET-50/51GT.
(i) Over current protection with IDMT characteristic shall provide
backup protection for generator transformer against faults which
produce over current.
(ii) Shall have an adjustable range of 50-200 %. This shall be
connected to the HV/ Neutral bushing CT with suitable current
(d) NON DIRECTIONAL BACK UP GT NEUTRAL OVER CURRENT
PROTECTION (51 NGT):
Over current protection with IDMT characteristics shall be provided
for system earth fault. This shall be connected to the HV neutral
bushing CT with suitable current setting range.
(e) Local Breaker Backup (LBB) Protection
(f) Interlocked Over Current Protection
11.17.03 GENERATOR & GENERATOR TRANSFORMER PROTECTION
(a) OVERALL DIFFERENTIAL PROTECTION (87GT):
This relay/function shall be provided for protecting the generator and
generator transformer, HV side of Unit auxiliary transformer,
excitation transformer, 15.75 KV bus duct from power house to
generator transformer and O/H line from PH to 220KV Gantry in the
switchyard. The measurement system shall have 3 phase features
and it should be possible to detect phase faults on both sides of the
generator transformer and single phase faults on HV side. The relay
shall be biased differential protection. The relay shall be stable for
through faults and provision for preventing CT saturation. The relay
shall be immune to magnetizing inrush current and the relay shall
have features to provide stability under over excited conditions and
have 2nd and 5th harmonic restraint features.5th harmonic bypass is
not acceptable. The relay shall be triple pole type with faulty phase
identification/ indication. The relay shall be high speed with an
PUR-F-10 ET-248
operating time of less than 30 ms at 5 times the rated current. The
relay shall have an additional high set instantaneous element for
rapid clearance of heavy faults (which shall not operate during
inrush) have internal features in the relay to take care of the angle
and ratio correction. The relay shall display differential and bias
11.18.00 ADDITIONAL FUNCTIONS AND FEATURES
Apart from the protection functions specified above, the numerical
protection equipment shall be provided with the following mentioned
functions and features:
GT/UAT Transformer Trouble relays for OTI/WTI/Buchholz etc
are required to be included/separately for tripping &
Breaker Trip Circuit Supervision relay is required for TC-1 &2 for
(GT bkr and Middle Bkr)
Master Trip Relays is required for Class-A/B/C protection
Other unit/excitation trouble relays are required to be
included/separately for tripping & annunciation
11.19.00 CURRENT CIRCUIT SUPERVISION AND FUSE FAILURE SUPERVISION
The relay unit shall give alarm or block protection functions expected
to give unwanted tripping during open or short circuited CT cores and
failure in the secondary circuits of the voltage transformer.
11.20.00 MEASUREMENT :
IED shall measure and display on line information on the local HMI
and on the Substation Automation System about:
measured voltages, currents, frequency, active, Reactive and
apparent power and power factor
The primary and secondary phasers
Differential currents, bias currents
positive, negative and zero sequence currents and voltages
measured values and other information of the different parameters
for included functions
logical values of all binary in- and outputs and general IED
All measured values shall be time tagged with real clock in the
11.21.00 SELF DIAGNOSIS AND SUPERVISION:
Continuous self-diagnostics tests on microprocessor, memory, timers and
the analog input module and the stand alone relays shall be carried out by
the equipment to immediately signal any failure. Internal and external
auxiliary supplies shall in particular be continuously supervised. The self-
monitoring shall be executed through hardware and software separately
and in the event of failure, the relays shall either lockout or attempt a
recovery depending on the type of failure detected.
11.22.00 HUMAN MACHINE INTERFACE. :
The HMI shall be with LCD/LED to display at least 7 lines of text and
characters and shall include LEDs for status indication and at least
configurable LEDs for alarm indication.
PUR-F-10 ET-248
11.23.00 PROGRAMMABLE SCHEME LOGIC:
The relay should have number of logic blocks and timers to adapt the
configuration to the specific application needs.
11.24.00 DISTURBANCE REPORT:
The disturbance report shall include Timed Tagged Events, Status of
Binary Signals, Sampled data of Analogue input & Binary signals and Pre
fault & Fault values for currents, voltages.
(i) Up to 2000 number of Continuous time tagged event logging in the
Event List shall be available and 200 number time tagged events in
the Event recording per recording.
(ii) 100 Disturbance Record with a total Disturbance Recording time of
340 secs with facility for programmable pre and fault recording time.
It should be possible to save the record in a COMTRADE format for
replaying by relay test kit.
(iii) The disturbance recorder shall be with 40(External & Internal)
Analogue channels and 96 binary signals
(iv) Any digital signal can be programmed to act as trigger for the DR.
Analog channels should have programmable threshold levels for
triggers and selection for over or under levels should be possible
(v) Latest software CDs for configuring / programming / setting the
relay, extracting and analyzing the disturbance records shall be
supplied. Interconnecting cable between relay front port and local PC
shall also be supplied with the relay.
11.25.00 COMMUNICATION:
It shall have Communication ports: RS232 /Ethernet/USB/Optical port on
front side for communication with Laptop/Desktop and Optical/ Ethernet
port / RS485 at rear side for connection to substation automation system
for IEC 61850 standards. All numerical relays
Offered shall be IEC 61850 compliant. Bidder shall submit KEMA
certificate showing compliance for major functions like Buffered Reports
(6), Time synchronization (13), GOOSE (9ab), Direct Control (12a), File
11.26.00 TIME SYNCHRONISATION:
Time synchronization shall be done by dedicated GPS system to be
provided by bidder. GPS system shall have SNTP, IRIG-B & Binary input
signal, optical port for time synchronization. All these facility should be
available in the Relay/DR PC & SCADA PC.
11.27.00 BINARY INPUTS.
At least 36 number optically isolated inputs.
11.28.00 BINARY OUTPUT RELAYS:
At least 48 number independent Programmable outputs.
11.29.00 HOUSING:
Screw Terminals: (‘O’ Lug for CT Connection)
Degree of Protection: IP51
11.30.00 LAPTOP SPECIFICATION:
1. Make: - HP/Lenovo/Sony/Dell/Acer/Asus/IBM
2. Processor: - Core i7 13th gen with 4 GB Graphics or higher version
PUR-F-10 ET-248
3. RAM:-16GB or higher
4. Hard Disk: - 1TB SSD or higher
5. Screen Size: - 14” to 16”
6. Operating System: - Windows 11 Professional licence version
7. Antivirus: - Antivirus software with at least 3 year licence
8. Software: - All required software for relay communication and SCADA
with licence, software like office, PDF, software for printer should be
given with laptop.
11.31.00 FURNITURE:
1. Desktop Computer Table with Lockable Doors with exhaust fans, it
should have MCB protected power supply board with 4 nos. switch plug
arrangement with spike guard.(Quantity : Minimum 2 nos. or more as
per requirement)
2. Printer / UPS Table with Lockable Doors with exhaust fans, it should
have MCB protected power supply board with 4 nos. switch plug
arrangement with spike guard. (Quantity: Minimum 1 nos. or more as
per requirement)
3. Chairs for Desktop computer table having Adjustable seat Height, Head
support Seat lock, wheels, adjustable arm rest and locking mechanism.
(Quantity: Minimum 4 nos. or more as per requirement).
12.01.00 TYPE TEST
12.01.01 The relay offered shall be fully type tested as per the relevant
standards. Test certificate not older than 5 years shall be supplied
along with offer by the bidder.
12.01.02 The reports for following type tests shall be submitted by the bidder.
a) Insulation tests as per IEC – 60255-5.
b) High frequency disturbance test as per IEC-60255-4
(Appendix – E) Class III
c) Fast transient test as per IEC 1000-4 Level III.
d) Relay characteristics, performance and accuracy test as per
Steady state characteristics and operating time.
Dynamic Characteristics and operating time for distance
protection relays and current differential protection relays.
For Disturbance recorder and even logger only performance
tests are intended under this item.
e) Tests for thermal and mechanical requirements as per IEC-
f) Tests for rated burden as per IEC – 60255-6
g) Contact performance test as per IEC – 60255-0-20.
h) Electrostatic Discharge (ESD) Test
Standard: IEC 61000-4-2
Level: Typically Level
Purpose: Verifies immunity to electrostatic discharges.
i) Radiated Electromagnetic Field Immunity Test
Standard: IEC 61000-4-3
PUR-F-10 ET-248
Purpose: Ensures reliable operation in presence of radiated RF
j) Conducted Disturbance Immunity Test
Standard: IEC 61000-4-6
Purpose: Tests immunity to RF signals conducted along cables.
k) Surge Immunity Test
Standard: IEC 61000-4-5
Purpose: Ensures protection against high-energy transients
(e.g., lightning surges).
l) Power Supply Variation and Interruption Test
Standard: IEC 60255-11
Purpose: Tests relay performance during supply voltage dips,
interruptions, and variations.
j) EMC Emission Tests
Standard: IEC 60255-26
12.01.03 The purchaser reserves the right to demand repetition of some
or all the type test in the presence of the purchaser’s
representative. For this purpose the bidder may quote unit
rates for carrying out each type test. For any change in the
design/type already type tested and extra cost in case, the
equipment has not been type tested earlier, the entire type test
as per relevant standards shall be carried out by the successful
bidder in the presence of purchaser’s representative without
any extra cost.
12.02.00 ACCEPTANCE AND ROUTINE TESTS:
12.02.01 All acceptance and routine test as stipulated in the relevant
standards shall be conducted at the place of manufacturer in
presence of purchaser’s representative without any extra cost.
12.02.02 Immediately after finalization of the programme of type/
acceptance/ routine/ testing the supplier shall give two weeks
advance intimation to the purchaser to enable him to depute his
representative for witnessing the tests.
12.02.03 No equipments shall be dispatched before all tests and
inspection have been carried out according to the approved
quality assurance plan unless otherwise instructed by the
13.00.00 INSPECTION DURING MANUFACTURING:
13.01.00 The inspection may be carried out by the purchaser at any stage of
manufacture. The successful bidder shall grant free access to the
purchaser’s representative at a reasonable time when the work is in
progress. Inspection and acceptance of any equipment under this
specification by the purchaser shall not relieve the supplier of his
obligation of furnishing equipment in accordance with the specifications
and shall not prevent subsequent rejection if the equipment is found to be
13.02.00 The supplier shall keep the purchaser informed well in advance, about the
manufacturing programme so that the arrangement can be made for
13.03.00 The purchaser reserves the right to insist for witnessing the acceptance
routine testing of bought out items.
PUR-F-10 ET-248
14.00.00 QUALITY ASSURANCE PLAN:
14.01.00 The bidder shall invariably furnish along with his offer the quality
assurance plan adopted by him/his sub-supplies in the process of
manufacturing all major equipment/component.
14.02.00 Precaution taken for ensuring usage of quality raw materials and sub-
components shall be stated in the quality assurance plan.
14.03.00 The bidder should specifically express their consent to accept additions,
revisions to their quality assurance plan to meet the purchaser’s
requirements if needed. The final quality assurance plan to be adopted,
with mutual consent, shall be decided after discussion with successful
15.00.00 GUARANTEE:
You have to give guarantee certificate for 36 Months from the date of
receipt of material at Main store GTPS for all supplied materials &
Years for all supplied numerical relays/BCU/Injection Unit/protection
devices. If goods/equipments are found defective during guarantee period
due to bad design material or workmanship, the same should be
replaced/repair free of cost.
16.00.00 DEVIATIONS
No deviations to this specification shall be acceptable unless specifically
indicated in the offer in the relevant schedule. All deviations shall be
clearly spelt out by the Bidder and the price implications thereof. GSECL
at their discretion will decide regarding acceptance of deviation. Bidder
must furnish List of Technical Deviations mentioning the specification
clause nos. against which deviations have been sought for. Compliance
with this specification will be taken for granted in absence of any specific
mention of deviations in the said list of deviations. Any implied deviation
or any deviation mentioned elsewhere in the offer shall not be
17.00.00 DOCUMENT SUBMISSION:
17.01.00 All drawings/documents submitted by supplier shall be in sufficient detail
to indicate the type, size, arrangement, weight (as applicable) the external
connections, fixing arrangements required, the dimensions required for
installation and interconnections with other equipment and materials,
clearances and spaces required between various portions of equipment
and any other information specifically requested.
17.02.00 Drawings / Documents submitted shall be signed by responsible
representatives of the Bidder and all drawings shall be of A-3 size.
(297mmX420mm). All dimensions on drawings shall be in Metric Units,
unless otherwise specified. The details in the drawings shall be in English
17.03.00 In addition to the information provided on drawings, each drawing shall
carry a revision number, date of revision and brief details of revisions
arrived out. Wherever any revision is carried out, correspondingly revision
number must be updated. All revisions carried out shall be highlighted on
the drawing and a Separate sheet furnished stating the reasons for such
revision. A note stating drawing is generally revised is not acceptable.
17.04.00 Drawings submitted by the Bidder for approval will be checked / reviewed
by the Purchaser’ and comments, if any, on the same will be conveyed to
PUR-F-10 ET-248
the Bidder. It is the responsibility of the Bidder to incorporate correctly all
the comments conveyed by the Purchaser on the Bidder’s drawings. The
drawings which are approved with comments are to be resubmitted to the
Purchaser for purpose of records. Such drawings will not be checked /
reviewed by the Purchaser to verify whether all the comments have been
incorporated by the Bidder. If the Bidder is unable to incorporate certain
comments in his drawings he shall clearly state in his forwarding letter
such non-compliance along with valid reasons and justification.
17.05.00 Any work performed or material ordered by the Bidder prior to receipt of
drawings stamped ‘Approved with comments as noted’ by the Purchaser
shall be at the risk of the Bidder. After print of any drawing has been
returned ‘Approved’, the Bidder may release the parts covered by the
drawing, for production / construction.
17.06.00 Reproducible, where called for in the Drawing Submission Schedule, shall
be submitted after the approval of drawings. These should be of good
quality and capable of producing clear and legible prints.
17.07.00 Upon completion of the installation, the Bidder shall furnish a complete
set of drawings on reproducible form on which the Bidder shall make in a
neat and accurate manner, a complete record of all changes and revisions
to the original design, as installed in the completed work. These drawings
shall be submitted to the Purchaser.
17.08.00 Drawings prepared by the Bidder and approved by the Purchaser shall be
considered as a part of the Contract Specification. However, examination
and approval of the drawings by the Purchaser shall not relieve the Bidder
of his responsibility for engineering, design, workmanship, materials and
construction under the Contract.
17.09.00 If, at any time before the completion of the work, changes are made
necessitating revision of approved drawings; the Bidder shall make such
revisions and proceed in the same routine as for the original approval.
17.10.00 The drawing and documents which are not subject to approval shall be
stamped “FOR INFORMATION”. However, the Purchaser shall reserve the
right to comment.
17.11.00 The Bidder shall prepare and submit to the Purchaser, operation and
maintenance manuals in accordance with the Purchaser’s requirements
and in sufficient detail, for the Purchaser to get familiarized with the
equipment and to enable him to operate, maintain, dismantle, reassemble,
adjust and repair the equipment in a safe and efficient manner. O&M
Manual shall contain
i) Vendor Contact Details
ii) Storage Instruction
iii) Erection & Commissioning Instruction
iv) Operating Procedure /Instruction and Maintenance Schedule
v) List of Bought out component & sub vendor’s addresses
vi) Technical Data Sheet
vii)Leaflets of Bought Out component
vii)Drawings etc.
17.12.00 A separate section of the manuals shall be devoted to each size/ type of
equipment and shall contain a detailed description of construction and
operation, together with all relevant pamphlets, catalogues, drawings and
a list of parts with procedure for ordering spares. Maintenance
instructions shall include checking, testing and replacement procedures to
be carried out to ensure trouble-free operation.
PUR-F-10 ET-248
17.13.00 All documents including drawings, data sheets, erection and
commissioning manuals, O&M manuals shall be provided on electronic
media viz. CD’s / Pen Drive Each electronic media shall be of high quality
and suitable for long-term storage. The reproduction from media shall be
of good quality.
18.00.00 DRAWINGS / DATA / DOCUMENTS TO BE SUBMITTED BY
BIDDER ALONGWITH THE BID
18.01.00 As a minimum, the bidder shall furnish the following in two sets failing
which the bids shall be rejected.
i) Typical general arrangement drawing of the equipment showing overall
ii)Typical schematic drawing in respect of Panel , relay/scheme offered
looking to the scope , visit at site , discussion with GSECL which shall
include Analogue input , Binary Input Output , Logic , etc. on the basis of
which technical scrutiny will be made.
iii) Catalogues for equipment and fittings & accessories
iv) Operation & Maintenance Manual.
v) Schedules as per Section III.
vi) Quality assurance plan
vii) Type test reports of similar rating equipment
viii) Experience certificates of supply of identical types of equipment
ix) List of sub-vendors for purchaser’s approval.
19.00.00 DRAWINGS / DATA / DOCUMENTS TO BE SUBMITTED BY
SUCCESSFUL BIDDER
19.01.00 After issue of detailed purchase order, the successful bidder shall submit
within four weeks, four sets of complete drawings along with detailed bill
off material for approval. In normal practice, the documents submitted for
the approval will be commented upon or approved if in order, within 15 days
from the date of receipt of the same.
19.02.00 Before dispatch of equipments to consignees, the supplier is required to
submit sets of following drawings / documents in suitable files. There shall
be such five sets per equipment and shall be forwarded to (a) Three sets to
consignee before Dispatch of equipment at Gandhinagar TPS (b) one set
with equipment at Gandhinagar TPS and (c) One set to C.E. (G) GSECL
Vidyut Bhavan , Race Course, Vadodara-390007
a. Control schematics and wiring diagrams.
b. Operation and maintenance manual.
c. Commissioning manual.
d. Catalogues for all bought out items.
e. Relay setting calculation details
The manuals and test reports should be submitted in bound form suitable
for long storage with the necessary information printed on the cover page
as well as back for easy traceability. The documents not submitted in the
above manner will not be accepted.
All Erection, operation & maintenance manuals & drawings shall be
furnished in reproducible form (CDs/Pen Drive) also.
PUR-F-10 ET-248
20.00.00 DEMONSTRATION
During technical scrutiny of the bid purchaser may ask to give
demonstration of offered relay. The bidder shall demonstrate the same
within two weeks of intimation from purchaser.
21.00.00 21.00.00 PACKING AND TRANSPORT:
21.01.00 All equipment/material shall be suitably packed for transport, carriage at
site and outdoor storage during transit. The contractor shall be responsible
for any damage to the equipment during transit due to improper and
inadequate packing. The cases containing easily damageable material shall
be very carefully packed and marked with appropriate caution symbols i.e.
`FRAGILE’ `HANDLE WITH CARE’, `USE NO HOOK’ etc. The contents of
each package shall bear marking that can be readily identified from the
package list and packing shall provide complete protection from moisture,
termites and mechanical shocks etc.
21.02.00 Wherever necessary proper arrangement for attaching slings for lifting
shall be provided and all packages clearly marked with gross weight, signs
showing `UP’ and `DOWN’ sides of boxes, contents of each package, order
no. and date, name of the plant of which the material in the package forms
part of and any handling and unpacking instructions considered
necessary. Any material found short inside the intact packing cases shall
be supplied by the manufacturer/supplier without any extra cost.
21.03.00 Bidder shall ascertain, prior to shipment, from concerned authorities, the
transport limitations like weight and maximum allowable package size for
transportation. Fragile material such as relay cases, Instruments and
other glass material shall be carefully covered with shock absorbing
protective materials, such as thermocol, silica gel or equivalent moisture
absorbent material in small cotton bags shall be placed inside the packing
wherever necessary.
21.04.00 Each consignment shall be accompanied by a detailed packing list
containing the following information.
a) Purchase order reference.
b) Name of consignee
c) Details of consignment
e) Total weight of consignment
f) Handling and unpacking instructions.
g) Bill of materials indicating contents of each package
h) Sign showing upper/lower side of the crate.
22.00.00 TRAINING:
22.01.00 The successful bidder shall be required to provide facility for training, at
no extra cost to the purchaser’s six to eight engineers from Gandhinagar
thermal power station to be nominated by the purchaser for a period of
Three to Five days at his works, where the equipment offered shall be
manufactured. The training shall cover familiarization with scheme,
procedures of installation, testing, commissioning, operation, maintenance
and trouble shooting on the relays.
22.02.00 If the relay offered, is being designed and manufactured in collaboration
with any other manufacturer, the supplier shall provide facilities for the in-
plant training in the collaborators works.
PUR-F-10 ET-248
22.03.00 In case of training within India, the to and fro travel expenses, lodging and
boarding charges as well as allowances for out of pocket expenses in
respect of the trainees, shall be borne by the Purchaser. However, the
supplier shall provide suitable facilities for lodging as well as to and fro
transport to place of training from the hotel/guest house.
22.04.00 The programme of the training shall be mutually discussed and finalized
by the purchaser with suppliers.
23.00.00 SUPERVISORY INSTALLATION & COMMISSIONING:
The bidder shall depute their Engineer, technician to the site for carrying
out the retrofitting work, testing and commissioning of relays, schemes
24.00.00 GUARANTEED TECHNICAL PARTICULARS
The bidder shall fill Guaranteed Technical Particulars indicated in
Annexure which form part of the bid specification and offer. If the
Guaranteed Technical Particulars are not submitted duly filled in with
the offer, the offer is likely to be rejected.
25.00.00 GUARANTEE FOR MAINTENANCE SPARES AND SERVICES:
The bidder shall guarantee for supplying maintenance spares and
services as well as repairing of relays for a period of the life expectancy of
SIGN OF BIDDER CHIEF ENGINEER (Gen),
PUR-F-10 ET-248
1 Name of Bidder with registered office
2 Bidder’s proposal number and date
3 Telegraphic / Telex Address
4 Telephone No.
7 Name and Designation of the Official of
the Bidder to whom all reference shall
8 Project organization chart showing Yes / No
staffing, furnished?
9 List of important personnel with brief Yes / No
curriculum vitae, furnished?
PUR-F-10 ET-248
GUARANTEED TECHNICAL PARTICULARS
(TO BE FILLED IN BY THE BIDDER -FURNISH WITH TECHNICAL BID)
The GTP is to be filled up in this format and , to be submitted in duplicate along with
the offer. This is intended for speedy comparison of various bidders GTP. The Bidder
shall fill in the particulars against appropriate items in respect of each rating and
type of equipment offered in the broad categories listed below. However, bidder shall
minimum cover all the specifications mentioned in tender document.
II PROTECTION RELAY Generator
protection relay
2. Type Model No.
3. Whether Numerical measurement.
4. Auxiliary DC Voltage
5. CT input, specify whether selectable at site.
6. Specify range of setting & availability of following
(1) Generator Differential protection
(2) Generator Inter turn differential protection
(3) 100% stator earth fault protection
(4) Gen loss of excitation protection
(5) Generator rotor earth fault protection
(6) Generator low forward power protection
(7) Generator reverse power protection
(8) Generator thermal overload protection
(9) Generator over voltage protection
(10) Generator Over/Under frequency
(11) GT Over fluxing protection
(12) Generator dead machine protection
(13) Generator under impedance protection
(14) Generator pole slip protection
(15) Generator overall differential protection
(Three winding )
(16) Generator negative phase seq. protection
(17) Generator transformer REF protection
(18) Generator back up over current
(19) Generator breaker failure protection
(20) Any other protection should specify by
(21) The HMI display size.
12. Programmable scheme logics .
Nos. of ‘AND’ Logic scheme.
Nos. of ‘OR’ Logic scheme.
No of other logic scheme
PUR-F-10 ET-248
13. Burden at CT input
14 No. of setting Groups.
15. Whether Trip Circuit supervision in built.
16. CB Monitoring facility
17. Whether Broken conductor / phase discontinuity
protection in built
18. Operating Time
19. Operational Accuracy Current and Time.
20. Reset Ratio.
Other features.
21. No. of Binary inputs.
22. Out put relays with contact configuration.
23. Out put relay contact rating
Make and carry continuous
Make and carry for 0.5 S.
24. Display type and character.
26. Communication
Time synchronization.
27. Facilities through HMI
28. Disturbance recorder
Total Duration of fault recording.
Pre fault and post fault time.
No. Of records.
Duration of each record
No. of analog channel.
No. of digital channel
29. Fault records
30. Events recording capacity.
31. Self supervision facility.
32. Relay housing
Flush / Projected
Degree of protection
33. Terminal Type
Other connections
34. Temperature and humidity
Relative humidity
Operating Range.
35. Supply of software for relay programming and
extraction of disturbance records
PUR-F-10 ET-248
38. Other additional inbuilt function of the relay to
39. Any other information
40. Literature attached.
Function / Features of relay 50 LBB, Other Other
III 51GT,51NGT offered offered
Prot. Relay relay relay
1 Make , Type and Model No.
2 Auxiliary DC Voltage
3 CT input, specify whether selectable at
4. Programmable scheme logics.
Nos. of ‘AND’ Logic scheme.
Nos. of ‘OR’ Logic scheme.
No of other logic scheme
5 Burden at CT and VT input
6 No. of setting Groups.
7 Whether Trip Circuit supervision in
8 CB Monitoring facility
9 Operating Time
Other features of relay
10 No. of Binary inputs with rating
No. of Binary Out put with rating
11 Output relays with contact
12. Output relay contact rating
Make and carry continuous
Make and carry for 0.5 S.
13. Display type and character.
15. Communication
Whether suitable for any
communication scheme.
Communication Protocol available
Front port Type & No.
Rear Port Type & No.
Time synchronization , Specify port
16. Facilities through HMI , Setting
Parameterization , DR Evaluation etc.
17. Disturbance recorder
Total Duration of fault recording.
PUR-F-10 ET-248
Pre fault and post fault time.
No. Of records.
Duration of each record
No. of analog channel.
No. of digital channel
18. Fault records
19. Events recording capacity.
20. Self supervision facility.
21. Relay housing
Flush / Projected
Degree of protection
22. Terminal Type
Other connections
23. Temperature and humidity
Relative humidity
Operating Range.
24. Name of Software and purpose which
will be supplied with relay.
25. Other additional inbuilt function of the
relay to specify.
26. Any other information
27. Literature attached.
III DR Work Station
1. Software offered.
3. Type / Version No.
5. List feature / facility of the system offered.
Literature attached.
6. Type of Database used.
7. Network schematic attached offered for complete scheme.
8. Specification of PC offered. (should be of latest
9. Type of OS and Antivirus offered.
10. UPS make , model , rating , capacity , backup time
11. List of Material required for the system with qty. , rating
make , model , specification etc.
12. Any other detail to furnish.
PUR-F-10 ET-248
DEVIATIONS FROM TECHNICAL SPECIFICATION
All the deviations from this specification shall be set out by the bidder, clause by
clause, in this schedule. Unless specifically mentioned in this schedule, the bidder
shall be deemed to confirm to the specification.
Reference Description of Exceptions / Reason for Exception /
Section and Deviations Deviation
Sr. Name of the Location of Date of Performance Details of Person to
No. Purchaser / the Plant / Commission Certificate Equipment whom
Owner with Equipment ing submitted supplied & reference be
full address (Yes/No) installed made
PUR-F-10 ET-248
PERFORMANCE AND EXPERIENCE DETAIL
Bidder shall furnish here a list of similar orders executed/under execution by him
and name of persons to whom the reference may be made by the Purchaser in case
he considers such reference necessary.
LARGEST QUANTITY ORDER EXECUTED
Sr. ITEMS ORDER ITEM QUANTITY ORDER STATUS REMARKS
No SUPPLIE REFERENC S FULLY IF ORDER
. D TO E NO. & EXECUTE UNDER
DATE D EXECUTIO
LIST OF DOCUMENTS SUBMITTED WITH THE BIDS
Documents Title and Description
PUR-F-10 ET-248
LIST OF STNDARDS
Sr.No. Standard no. Title
1. IS-3231 Electrical relays for power system protection.
2. IEC-255 Electrical relays for power system protection.
3. BS – 142 Electrical relays for power system protection
4. IS – 1248 Indicating instruments.
5. BS – 89 Indicating instruments
6. IS – 6236 Recorders
7. BS-90 Recorders
8. IS – 722 Energy meters & control switches (LV Switching devices
for control and auxiliary circuits.)
9. BS – 37 Energy meters, control switches (LV Switching devices
for control and auxiliary circuits)
10. IEC-337 & Energy meters, control switches (LV Switching devices
337-1 for control and auxiliary circuits)
11. IS – 2705 Current transformers
12. IS – 3156 Voltage transformers
13. IS – 4237 General requirements for switches and control gear for
voltages not exceeding 1 kV.
14. IS – 375 Marking and arrangements for switch gear, bus bars,
main connections and auxiliary wiring.
15. BS – 152 Relay coding, auxiliary wiring and panel and wiring.
16. IS – 8686 Static protective relays
17. IS – 2147 Degree of protection for cubicles
18. IEC-297 Dimensions of mechanical structures of the 482.6mm
Part 1-3 (19)” series.
19. IS – 6875 Control switches (LV Switching devices for control and
auxiliary circuits)
20. IS – 5 Colour for ready mixed paints and channels.
21. IS – 1554 PVC insulated cables up to and including 1000 volts.
22. IS – 3842 Application guide for protection
23. IS – 9224 HRC Cartridge fuse links.
24. IS – 6005 Code of practice for phosphating iron and steel
25. IS-5578 Guide for making of insulated conductors.
26. IS – 11353 Guide for uniform system of marking and identification
of conductors and apparatus terminals.
27. IS – 9482- Characteristics values of input and outputs of single
1980 side band PLCC terminals.
28. IS- 9528 Part- Planning of (single side band) power line carrier systems.
29. IS – 10706 – Methods of tests for single side band PLC terminals.
30. IS-8997-1978 Coupling device for PLC systems (note This is to be
referred for the PLCC terminal connections.
31. IEC-686-1 Transducers
32. IS – 2206 Fuses
33. IS – 9000 Dry heat test
34. IEC – 801-4 Electrical heat transient bursts.
35 IS 694 PVC Insulated cable for working voltage up to &
including 1100 volt.
PUR-F-10 ET-248
Latest IEC Standards:
Sr.No. Standard no. Title
Electromagnetic Compatibility type test:
1. IEC-60255-22-1, Class-III, MHz burst disturbance
2. IEC-60255-22-2, Class-III Electrostatic discharge
Direct application
IEC-61000-4-2, Class-III Indirect application
3. IEC-60255-22-4, Class-A Fast transient disturbance
4. IEC-, 60255-22-5 Surge immunity test
5. IEC-60255-22-7, Class-A Power frequency immunity test
6. IEC-61000-4-8, Class-V Power frequency magnetic field
7. IEC- 60255-22-3 Radiated electromagnetic field
8. EN-61000-4-3 Radiated electromagnetic field
9. IEEE/ANSI/C37.90.2 Radiated electromagnetic field
10. IEC- 60255-22-3 Conducted electromagnetic field
11. IEC- 60255-25 Radiated emission
Insulation tests:
1. IEC- 60255-5 Dielectric test
Impulse voltage test
Insulation resistance
Environmental tests:
1. IEC-60068-2-1 Cold test
2. IEC-60068-2-2 Dry heat test
3. IEC-60068-2-3 Damp heat test, steady state
4. IEC-60068-2-30 Damp heat test, cyclic
1. IEC- 60255-26 Immunity
2. IEC- 60255-26 Emissive Test
3. EN-50178 Low voltage directive
Mechanical tests
1. IEC- 60255-21-1 Vibration
2. IEC- 60255-21-2 Shock and bump
3. IEC- 60255-21-3 Seismic
PUR-F-10 ET-248
Other Terms & Conditions
1. Contractor shall indemnify GSECL against for any injury and/or damage that
may be caused in his man or material. Moreover, the contractor shall be fully
responsible for any damage caused to the Corporation’s properties done by his
man/materials while executing the work. The Corporation will be entitled to
recover the damage from the party’s bill.
2. At any time if GSECL feels that progress of work is unsatisfactory and work
force of contractor is inadequate, other agencies/ departmental personnel will
be put in parallel for expediting the work. Amount so incurred will be recovered
from the contractor’s bill. In this case decision of the Engineer-in-charge shall
be final and binding to the contractor.
3. At any stage of the contract period, if the contractor fails to complete the job or
his work is not found satisfactory the same will be got done at his cost and risk
and additional expenditure incurred by the Corporation will be recovered from
him by giving one week's notice.
4. Sublet of contract: - Subletting the contract to another agency is not permitted
unless approved by the competent authority. However, if the contractor wishes
to sublet any portion of the work, prior approval from GSECL must be obtained.
Additionally, the contractor or subcontractor must appoint an OEM's
technically expert engineer to supervise the work on-site during its progress.
5. Details of skilled/semi-skilled persons presently employed by the contractor
having sufficient knowledge of similar jobs.
6. The bidder shall guarantee for supplying maintenance spares and services as
well as repairing of relays for a period of the life expectancy of 15 years.
7. Conditional tender will not be accepted. Withdrawal of condition
unilaterally before or after opening of tender will not be permitted.
8. The contractor has to carry out the required work strictly according to guidance
given by the Corporation's responsible officer.
9. The Corporation reserves the right whether the materials to be accepted, or not.
Only specified and scheduled materials are to be examined by Corporation's
officer and then if suitable will be accepted by the Corporation.
10. The contractor shall submit his bill in triplicate to the CE(G), GSECL, TPS,
Gandhinagar which will be paid after the certificate regarding correct receipt of
the materials in good condition.
11. In case of any dispute, the decision of the Chief engineer (Gen) is final and
bound to the bidder.
12. Revision of prices or any commercial terms affecting the price after opening of
technical bids shall not be considered and will be ignored.
13. Security deposit:- It is mandatory to submit security deposit before order
placement. Party shall have to pay security deposit of 5% of contract value on
receipt of Letter of Intent. Such Security Deposit will be payable either in D.D. /
Bank Guarantees. Bank Guarantees from Scheduled / Nationalized Banks
will be acceptable if the amount of security deposit payable exceed Rs.5,000/-.
The Bank Guarantees will be executed on the standard form prescribed by the
corporation. In case of the Bank Guarantees furnished / submitted, they
should have clear one time validity till the completion of the order in all respects
and up to the expiry of Guarantee period from the date of the work completion.
Bank Guarantee for Interim period will not be allowed. If by any reasons the
work period is extended then contractor should undertake to renew the Bank
Guarantee at least one month before the expiry of the validity failing which
GSECL will be at liberty to encash the same. CORPORATE BANK GUARANTEES
PUR-F-10 ET-248
“It shall be mandatory to submit 5% security deposit within 10 days from
the date of issue of Letter of Intent before order placement. In case when
successful bidder not at all responding within notice period or withdraws
his offer then his EMD shall be forfeited and he will not be allowed to
participate in the tenders invited from the same office for the period of
One year for that place from where tender is invited.”
If the Tenderer fails to pay the Security Deposit or defaults in execution of
the orders placed or if GSECL suffers any financial loss due to this, then
GSECL will be at liberty to adjust the amount from other orders of the
same firm or by encashing the Bank Guarantee. SD will be refunded after
submission of valid PBG.
All the costs of the stamp papers, other than required for payment is to be made
through SIDBI / ICICI by Board, are to be borne by you as per the Govt. of
India’s latest guidelines.
14. Any terms and conditions mutually agreed to writing shall be for a part of the
15. The authorized officer/person of the Corporation will have the liberty to check
the material and work etc.
16. Regarding the quality and acceptance of the jobs the authorized officer's
decision will be binding and final and no dispute on this account will be
17. General terms and conditions of the Corporation for works contract will be
made applicable for this work also.
18. No material for the said work will be supplied by the Corpn. Except specified in
schedule thereof.
Supply: If the supply is not done within 6 months from the date of issue of LOI
or 4 months from the date of drawing approval, whichever is earlier in all
respects then the penalty will be levied as per Corporation's rules. Any delay
that may take place in supply beyond contractual cut off date shall be subjected
to penalty (not liquidated damages) at the rate ½ % of the contract price on
supply portion per week or part thereof subjected to a maximum of 10% of the
total contract value price on supply portion (i.e. End cost including GST).
Work: The contractor must have to complete the Erection, Testing and
commissioning of GRP panel retrofitting work within 20 Days for each Unit. If
any delay that may take place in Erection, Testing and commissioning of GRP
panel retrofitting work of allotted Unit within stipulated time shall be subjected
to penalty (not liquidated damages) at the rate ½ % of the work portion of
contract price of particular unit work per day subjected to a maximum of 10%
of the total work contract value of particular unit work. (i.e. End cost including
applicable taxes if any)
20. For any type of penalty GST is applicable.
21. Statutory variations:-any statutory increase or decrease on the taxes and
duties subsequent to your offer if it takes place within the original contractual
delivery date will be to the company’s account subject to the claim being
supported by documentary evidence. However if any decrease takes place after
the contractual delivery date the advantage will have to be passed on the
22. The Contractor will have to enter into agreement with GSECL on stamped paper
of Rs. 300/- and indemnity Bond of Rs 300/- (Non-judicial) at his cost for this
23. While execution of this job our plant and auxiliaries will be in running
conditions. Hence contractor has to take all precautions for safety etc. Safety
PUR-F-10 ET-248
Shoes, Safety belts, Safety Goggles, Safety Gloves etc. also to be used wherever
necessary while working.
24. Corporation reserve the right to place the repeat order for the quantity shown in
Schedule-B within the period of one year with all the specification and terms
condition remain unchanged.
25. All the terms and conditions specified in Industrial & safety laws are binding on
26. The bidder, prior to bidding, can visit the site for assessment of supply and
works of GRP Panel.
27. The contractor has to carry out the work strictly as per the instruction of EIC.
He has to commence the work only after EIC gives clearance & after ensuring
proper power isolation. GSECL shall not be in any case responsible for any
accident to the contractor’s personnel. It is solely the responsibility of the
contractor to ensure his men’s safety.
28. Contractor has to take all necessary precaution so that no damage to the
equipment or any of the GSECL's property takes place. GSECL shall recover the
cost in the event of any damage to its property.
29. Order Validity:- The validity of this order is 30 months from the date of issue of
order however order validity may be extended by mutual agreed.
30. Contractor has to follow all the safety rules attached herewith. The general
rules and regulations of Corp. for tender and contract for work shall be
applicable. The contractor is deemed to have gone through it and considered to
be fully aware of the conditions mentioned in the book let.
31. The contractor should take care of his own persons for prevention of any type of
accident and must follow the safety rules. GSECL will not be responsible for any
accident (fatal or non fatal) to contractor's person during work and any legal
compliance arising thereafter.
32. The contractor shall be responsible for satisfactory performance. Any problem
arising shall be set right by contractor without any extra cost.
33. Unsatisfactory progress of work: In case the work of contractor is found
unsatisfactory or not progressing according to the requirement, GSECL may
take such action as deemed fit to see that the work is completed in time at
contractor's risk and cost, including termination of the contract.
34. Completion Time :-
Supply Portion: - The time limit for the supply of material at the GTPS site
is 6 months from the date of issue of LOI or 4 months from the date of
drawing approval, whichever is earlier. Penalty will be levied as per
applicable rules in case of delay.
Work Portion: - The retrofitting job work must be completed within 20 days
during the scheduled shutdown period. A prior intimation of 15 days will be
given before the shutdown. Failure to complete the work within the
stipulated time will attract penalties as per applicable rules.
35. TIME LIMIT EXTENSION: If the contractor shall desire an extension of the
time limit for completion of the work on the ground of his having been
unavoidably hindered in execution or any other ground he shall apply in writing
to the Executive engineer and the executive Engineer may, if in his opinion
there are reasonable grounds for granting extension recommend such extension
as he thinks necessary or proper. The decision of the competent authority in
this shall be final. However, Time Limit of order may be extended by mutual
agreed as per GSECL rules.
36. Payment Terms:
PUR-F-10 ET-248
Supply Portion:- Payment of supply portion of schedule B will be released
at 80 % within 45 days after received and verification at GTPS store and
balance 20 % payment will be released after successful testing &
commissioning of relays. (i.e.10% of supply price on successful completion
of testing & commissioning of each unit).
Work Portion:- Payment of Works portion of schedule B will be released at
100 % on completion of work of each unit, within 45 days after receipt of
invoice. Party has to accept payment terms as per GSECL rules only i.e. as
per actual work done. NO ADVANCE payment will be allowed. Net
Payment will be released within 45 days after completion of work and
submitting their relevant invoices.
37. Guarantee/Warranty: You have to give guarantee certificate for 36 Months
from the date of receipt of material at Main store GTPS for all supplied materials
& 10 Years for all supplied numerical relays/BCU/Injection Unit/protection
devices. If goods/equipments are found defective during guarantee period due
to bad design material or workmanship, the same should be replaced/repair
38. ‘If participating bidder/agency have stake in one or more other agencies /
bidder who are participating in same tender and on account of submission of
wrong information / declaration in the tender / enquiry certificate – A, then the
bidder will be declared as disqualified automatically and EMD / SD will be
forfeited. Further, GSECL shall take stern action including stop dealing with
39. The CE(G), GSECL, Gandhinagar, reserves right to reject/accept any or all
tenders without assigning any reasons thereof and to split up the work between
the parties as the case may be.
Chief Engineer (Gen),
GSECL: TPS: Gandhinagar.
PUR-F-10 ET-248
Additional Terms & Conditions:
(1) Details of EPF Code No. with Registration copy.
(2) Income Tax PAN No. with Registration copy.
(3) The Last three-year Annual Accounts, Positive Net worth certificate, and Average
Annual Turnover certificate shall have to be submitted.
(4) Labour Law Compliance: “The supplier/contractor shall comply with all
applicable provision of labour laws related to wages, leave, provident fund, EMP.
Compensation act, factory act, contract labour (R&A) act etc.”
(5) Bond: You will have to execute bond on non judicial stamp of Rs. 300.00 at
your cost if materials are to be supplied by the corporation/firm.
(6) Arbitration: All questions disputes or difference, whatsoever, which may at any
time arise between the parties to this contract or any matter arising out of or in
relation there to, shall be referred to the Gujarat Public Works Contract Dispute
Arbitration Tribunal Act
(7) Termination of Contract: “GSECL reserve the right to terminate the contract
(i.e. purchase/work order) at any time, without assigning any reasons,
whatsoever, by giving notice period of one month from the date of notice of
termination of the contract, supplier/contractor will not be entitled for any
compensation/damages/losses whatsoever, on account of such termination of
(8) Firm Offer: The quoted rate should be firmed and no price escalation will be
given during contractual period and extended period.
(9) Insurance: You will arrange at your own cost for insuring all the materials and
equipments by you or drawn from the corporation and also your labour etc. The
corporation will not be responsible for any loss of damage to your equipment
materials or personnel.
(10) General Terms and Conditions: All the terms and conditions enumerated in
the printed booklets attached with the tender will apply for the carrying out this
work however whenever the terms and condition enumerated in the booklet”
Tender and contract of works” conflict with those state therein the later shall
prevail over the former, In case disputes differences arises to this contracts shall
be referred to the “Gujarat Public Works Contracts Tribunal Act 1992.”
Notes for Supplier:
(1) SECURITY DEPOSIT: It shall be mandatory to submit security deposit as per
below table within 10 days from the date of issue of Letter of Intent (LOI)
before order placement. Party shall have to pay Security Deposit in the form of
Demand Draft/Bank Guarantee/RTGS/NEFT only. In case when successful
bidder is not at all responding within notice period or withdraws his offer then
his EMD shall be forfeited and he will not be allowed to participate in the tenders
invited from the same office for the period of One year for that place from where
tender is invited.
Category of the Unit Security Deposit
Order End Cost Order End Cost
Up to Rs. 5 Lakh More than Rs. 5 Lakh
Enterprise or Organization Exempted 3% of Order End Cost
which are exempted from
paying Tender Fee & EMD as
mentioned on Tender Page
For all other Enterprises 5% of Order End Cost 5% of Order End Cost
PUR-F-10 ET-248
(2) Guarantee: as per clause No. (37) of Other Terms & Conditions mentioned
under Technical Bid. .
(3) Performance Bank Guarantee (Applicable): The supplier/contractor/party (i.e.
tenderee) has to give 5% of order end cost as a Bank Guarantee with validity
period of additional 01 (one) month i.e. more than actual Guarantee/Warranty
period of 36 months from the date of receipt of material at site to safeguard
Company’s interest in case of any eventuality happening on the last day of the
Guarantee/Warrantee period after office hours of the Bank or Bank Holidays.
(4) The GSECL reserves the right to prefer overall lowest party, to reduce/enhance
the tender quantity as per GSECL’s requirement at the time of finalization of
tender. GSECL also reserves the right to close the Tender at any time, without
assigning any reasons, whatsoever. Tenderers will not be entitled for any
compensations/ damages/losses, whatsoever, on account of such cessation of
(5) GSECL reserves the right to terminate the Contract (i.e. Purchase order) at any
time, without assigning any reasons, whatsoever. Suppliers will not be entitled
for any compensations/damages/losses, whatsoever, on account of such
termination of the Contract.
(6) Delivery Period: As per Technical Bid. Bidder should accept delivery period as
per GSECL requirement and same should be confirmed in Technical bid. The
party has to submit required documents within 10 days and delivery period will
be start from the date of issue of LOI. If party does not submit the documents
within specified time, necessary action may be initiated as per GSECL rules.
(7) Penalty: as per clause No. (19) of Other Terms & Conditions mentioned
under Technical Bid.
(8) Outside Gujarat material should come through RR sale at destination (i.e.
(9) Payment Term : Payment will be made by the GSECL directly to you as per
clause No. (36) of Other Terms & Conditions mentioned under Technical
Bid. Amount of GST and applicable cess will be kept under retention till
submission of documentary proof of payment of GST or till reflection of amount
of GST in GST return after due verification.
Additional Note: Vendor get to register in VMS System through vms.guvnl.com.
For registration following documents are required and mail to
[email protected] and [email protected]. After registration vendor
have to upload the invoice in the VMS system for smooth functioning of payment.
Documents required for Registration:
(2) GST Certificate Copy
(4) Full Name of Vendor
(10) Supplier shall have to submit all the necessary documents like material Test
certificate, other required test certificates, guarantee certificate, invoice etc along
with supply as per the order terms. Payment will not be processed without
required documents.
(11) REPEAT ORDER: GSECL reserves rights for the placement of repeat order @
% of the order quantity/value of A/T at the same prices, Terms and Conditions
stipulated in the original contract within 6 (Six) months of the order. In special
circumstances GSECL reserve the right to place repeat order up to 100% of the
original quantity of the A/T at the same prices, Terms and conditions stipulated
in the original Contract as mutually agreed upon.
PUR-F-10 ET-248
(12) In case of submission of Bank guarantee against Earnest Money Deposit/
Security Deposit/ Performance Guarantee following changes must be look
into by supplier/ contactor and followed by bank.
(a) There should be claimed period of at least one year after expiry of the bank
(b) For lodgment of claim for invocation of bank guarantee, the clause should
specifically state that said bank guarantee can be presented by GSECL at
the local branch of the issuing bank.
(c) The invocation of BGs a written application from the GSECL should be
sufficient for lodgment of our Claim.
(d) On receipt of original bank guarantee a written confirmation should be
obtained by GSECL from the issuing bank.
(e) GSECL shall accept bank guarantee issued by the bank as per approved
bank list mentioned in tender copy.
(f) E-BG is acceptable.
(13) Purchase Agreement:
The supplier shall have to enter into a ‘Purchase Agreement’ with GSECL. This
purchase Agreement has to be executed on Non-Judicial stamp paper of Rs.
300/- duly notarized.
The cost of Non judicial stamp & Notary charges will be borne by supplier.
Format for the Agreement is attached in the tender.
The Purchase Agreement shall be signed by the authorized representative and
have to produce documents as hereunder:
1. If the authorized representative is from a partnership firm, then a certified copy
of the registered partnership deed must be attached along with the signatures of
other partners who have authorized the particular partner to execute and sign
2. If it is a private or public limited firm, a copy of the resolution, authorizing the
person to execute & sign the agreement on behalf of the firm, passed by the
Board of Directors along with the Company’s Seal must be attached with the
3. If it is a proprietary firm, then the proprietor himself should execute & sign the
agreement and his full residential address must be available in the record
document. Statutory evidence (Aadhar Card / Voter card) of the person signing
the agreement should accompany the agreement.
Upon submission Security Deposit against LOI and signing of Agreement, GSECL
shall issue a detailed A/T /Purchase order incorporating various terms and
You have to accept all the GSECL’s terms and conditions without any deviations.
I/We agree to supply the article noted above at the rates herein tendered by
me/us subject to the condition of ‘tender and supply above given at the tender
inquiry which I/We have carefully read and which I/We have thoroughly
understood and to which I/We agree.
I /We hereby agree to keep this offer open for 120 days after the returnable date
of the tender and shall bound by communication of acceptance dispatched within
the prescribed time.
Date: Yours faithfully,
Signature of Tenderer
With Company's Round Seal
PUR-F-10 ET-248
SCHEDULE-B (PRICE BID FORMAT FOR ET-248)
(TO BE FILLED IN ONLINE / e-TENDER FORMAT ONLY)
Rate Quantity Unit Total Unit Unit END Total
Ex- Freight, GST F.O.R.
Sr. Description of materials With HSN with Tender offered Insurance FOR COST END
UOM Works P&F with COST
No. Details of Specifications Code CESS, Quantity by Charges Destination with GST COST
price in Charges CESS in Rs.
if any Tenderer in Rs. Cost in Rs. in Rs. in Rs.
PRE WIRED PROTECTION
PANEL COMPRISING
NUMERICAL GENERATOR
PROTECTION SCHEME
TRANSFORMER , UAT
PROTECTION RELAYS AND
OTHER AUXILIARY
ACCESSORIES AS PER
PC , NETWORKING CABLE,
ETHERNET SWITCH
EQUIPMENTS ETC FOR
DR WORK STATION AND
SCADA (W/O CONTROL)
APPLICATION AS PER
SPARES SET OF ALL
RELAYS INSTALLED IN
GENERATOR RELAY
PANEL INCLUDING ALL
TYPE OF AUX RELAYS,
FREQUENCY GENERATOR
& FILTER, CONTACTORS,
RESISTANCES AND
ACCESSORIES INSTALLED
IN SUPPLIED GRP
PUR-F-10 ET-248
Rate Quantity Unit Total Unit Unit END Total
Ex- Freight, GST F.O.R.
Sr. Description of materials With HSN with Tender offered Insurance FOR COST END
UOM Works P&F with COST
No. Details of Specifications Code CESS, Quantity by Charges Destination with GST COST
price in Charges CESS in Rs.
if any Tenderer in Rs. Cost in Rs. in Rs. in Rs.
PANELS.(10% SPARE OR
MINIMUM 1 (ONE) NO.)
INSTALLATION, TESTING
AND COMMISSIONING OF
GRP PANELS MENTIONED
AT SR. NO 1 ABOVE
INSTALLATION, TESTING
AND COMMISSIONING OF -----------------------------ONLINE SUBMISSION ONLY---------------------------
DR WORK STATION AND
5 SCADA WITHOUT Job
CONTROL FOR GRP
MENTIONED AT SR. NO.2
Note: Overall Lowest party’s offer will be considered for placement of order i.e. considering supply and works part as a
whole. Part/Partial offer will not be considered and order will be awarded to overall L -1 bidder.
1. Applicable GST rates needs to be mentioned in column no. 4 above and in case of tenderer opting for Composition scheme, “C” shall
be mentioned and amount (in Rs.) shall be “0” (Zero) in column no. 12. Also, such tenderer shall have to submit the copy of
Composite Registration Certificate.
2. I/We agree to supply the articles noted above at the rates herein tendered by me /us subject to the condition of Tender and supply of
the Tender inquiry which I/ We have carefully read and which I/ We have thoroughly understood and to which I/ We agree.
3. I/ We here by agree to keep this offer open for 120 days after the written date of the tender and shall be bound by communication of
acceptance dispatched within the prescribed time.
Date: Yours faithfully,
(Signature of Tenderer)
(With Company's Round Seal)
PUR-F-10 ET-248
(on Non-judicial stamp paper of Rs.300/- duly Notarized)
THIS AGREEMENT made on this …………. day of …………… Two thousand ……………
……………..……………………………… (Name of the Company), having Registered Office
at ……………………………………………. and represented by
……………………………………… …………. (Name and designation of the Authorized
Officer (herein after called “The Supplier”, which expression where the context so
requires or admits shall include his legal heir, administrators, executors, assignees
and legal representatives) of the ONE PART.
……………..……………………………… (Name of the Company), having Registered Office
at ……………………………………………. And represented by …………………………………
………………. (Name and designation of the Authorized Officer (here in after called
“The Purchaser / purchaser Company”, which expression where the context so
requires or admits shall include his administrators, executors, authorised person,
assignees and legal representatives) of the OTHER PART.
WHEREAS, the Supplier willingly submitted bids for the Tender No………………
……………… of the Purchaser company for supply of ……………………………….. [Name
of the material / items to be supplied by the Supplier] as specified and as per
delivery instructions provided in the Acceptance of Tender (AT) / Letter of Acceptance
(LOA) issued vide No………………. dtd……………. by the Purchaser company at the
accepted respective prices or rates mentioned against the said items / materials.
AND WHEREAS THE PURCHASER Company has accepted the tender of the Supplier
for the supply for the total sum of Rs. __________ (Rupees ___________________________
only) *including / excluding taxes upon the terms and subject to the conditions herein
mentioned in the agreement.
AND WHEREAS, a list is made out in the “SCHEDULE” hereunder written and all of
which said documents of the Schedule are deemed to form part of this agreement and
included in the expression “the Supply” wherever herein used, upon the terms and
subject to the conditions hereinafter mentioned.
NOW THIS AGREEMENT WITNESSES AS UNDER AND IT IS HEREBY AGREED AND
DECLARED THAT:-
(1) The Supplier has accepted the Terms and Conditions set out in the Tender Notice
No. ……………… dtd. ………….. as well as in the form of Acceptance of Tender (AT)
/Letter of Acceptance (LOA) No. .………………………...............…… dtd. …………….
which will hold good & valid during the period of this Agreement.
(2) The supplier shall do and perform for all supplies and things mentioned and
described in this agreement or which are implied therein or therefrom respectively
or are reasonably necessary for the in-time and in manner supplies as mentioned
and subject to the general / commercial terms & conditions and stipulations
contained in this agreement.
PUR-F-10 ET-248
(3) In consideration of the due provision, executions, completion of the Supply, as
agreed to by the Supplier as aforesaid, the Purchaser company hereby agrees to pay
all the sums of money as and when they become due and payable to the supplier
under the provisions of the agreement and such payment to be made at such times
and in such manner as provided in the agreement.
(4) In respect of the said Tender as per the terms & conditions of this Agreement, the
Supplier has deposited amount in Cash or DD or has provided valid Bank
Guarantee of Rs. …........……. (Rupees.……………….............…………………….. only)
with the Purchaser Company towards performance guarantee of execution period
i.e. for security deposit of the supply material / items.
(5) Upon breach by the Supplier of any of the conditions of this Agreement, the
Purchaser Company may give a notice in writing to rescind, determine and put to
an end to the A/T without prejudice to the right of the Purchaser company to claim
damages for antecedent breaches thereof on the part of the Supplier and also to
claim reasonable compensation /risk & cost purchase for the loss occasioned by the
Purchaser Company due to failure of the Supplier to fulfill the Order as certified in
writing by the Purchaser for which Certificate shall be conclusive evidence of the
amount of such compensation payable by the Supplier to the Purchaser.
(6) The Purchaser Company shall not be bound to take the whole or any part of the
ordered quantity herein or therein mentioned in the LOA / AT and may cancel the
contract at any time after giving ONE MONTH’S NOTICE IN WRITING without
compensating the Supplier.
(7) This Agreement shall remain in force till the expiry of satisfactory performance of the
Supply during Guarantee /Warranty period including for the quantity mentioned in
the repeat order, if any as per the terms & conditions of the LOA / AT.
(8) Any Notice in connection with the Supply including the Notice for termination may
be given by the Purchaser or any Authorized Officer for the said purpose as per the
Commercial Terms & Conditions of the LOA / AT.
(9) If subject to the circumstances beyond control i.e. Force Majeure conditions, the
Supplier fails to deliver the materials, the same shall be governed as per the Tender
(10) The agreed value, extent of supply, delivery dates,specifications, and other relevant
matters may be altered by mutual agreement as per the policy of the purchaser
Company and if so altered shall not be deemed or construed to mean or apply to
affect or alter other general /commercial terms & conditions of the agreement and
the agreement so altered or revised shall be and shall always be deemed to have
been adhered subject to and without prejudice to said stipulation.
(11) The following is the Schedule forming part of this agreement as provided herein
PUR-F-10 ET-248
List of documents:
In witness whereof the parties hereto have set their hands and seals this day,
month and year first above written.
1. Signed, Sealed and delivered by (Supplier):
(Signature with Name, Designation & official seal / stamp)
For and on behalf of M/s. _________________________________________ (Supplier)
(Complete Name, Address of the authorised person of the Supplier with
Authority letter or Board’s Resolution in case of company)
In the presence of Name, full Address & Signatures:
2. Signed, Sealed and Delivered by (Purchaser):
(Signature with Name, Designation & official seal / stamp)
For and on behalf of ____________________________________________ (Purchaser),
(Complete Name, Designation & Location / Address of the authorized officer
as per DOP of the Purchaser Company)
In the presence of Name, full Address & Signatures:
PUR-F-10 ET-248
EMD BANK GUARANTEE FORMAT
(BANK GUARANTEE ON NON-JUDICIAL STAMP PAPER OF Rs.300/-)
FOR TENDER No.: …………….. (Gujarat State Electricity Corporation Limited).
WHEREAS M/s. ____________________________________________ (Name and Address of the
Firm) having their registered Office at _______________________________________
__________________ (Address of the Firm’s registered Office) (hereinafter called the
“Tenderer”) wish to participate in the Tender No. ______________ for _______________work
____________________________________ of (Supply / Erection / Supply & Erection/Work) of
_____________________ (Name of material / equipment / work) for Gandhinagar TPS,
Gujarat State Electricity Corporation Limited (hereinafter called the “Beneficiary”)
and WHEREAS a Bank Guarantee for Rs. _______________ (Amount of EMD) valid till
______________ (mention here date of validity of this Guarantee which will be
months beyond initial validity of Tender’s offer) which is required to be submitted
by the Tenderer along with the Tender.
address of the Branch giving the Bank Guarantee) having our registered Office at
_____________________ (Address of Bank’s registered Office) hereby give this Bank
Guarantee No. _________________ dated ____________ and hereby agree unequivocally
and unconditionally to pay immediately on demand in writing from the Gujarat
State Electricity Corporation Limited or any Officer authorized by it in this behalf
any amount not exceeding Rs.____________ (amount of E.M.D.), (Rupees
Gujarat State Electricity Corporation Limited on behalf of the Tenderer.
agree that withdrawal of the tender /Bid / EOI or part thereof by the Tenderer within its
validity or non-submission of Performance Guarantee towards execution/supply
period by the Tenderer within 15 days from the date of issue of Letter of Acceptance
by Gujarat State Electricity Corporation Limited would constitute a default on the
part of the Tenderer and that this Bank Guarantee is liable to be invoked and encashed
within its validity by the Beneficiary in case of any occurrence of a default on the part of
the Tenderer and that the encashed amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank upto and inclusive of
____________________ (mention here the date of validity of Bank Guarantee) and shall not
be terminable by notice or by Guarantor change in the constitution of the Bank or the
Firm of Tenderer or by any reason whatsoever and our liability hereunder shall not
be impaired or discharged by any extension of time or variations or alterations made,
given, conceded with or without our knowledge or consent by or between the
Tenderer and the Gujarat State Electricity Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. Gujarat State Electricity Corporation Limited) Notice or invocation by any person
such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank.
Any invocation of the Guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this
Guarantee is restricted to Rs. _______________ (amount of EMD) (Rupees
PUR-F-10 ET-248
Guarantee shall remain in force till _____________ (Date of validity of the Guarantee).
Unless demands or claims under this Bank Guarantee are made to us in writing on or
before ___________ (Date of validity of the Guarantee), all rights of Beneficiary under
this Bank Guarantee shall be forfeited and we shall be released and discharged from all
liabilities there under.
Please mention here complete Postal Signature of the Bank’s authorized
Address of the Bank with Branch Signatory with Official Round Seal.
Code, Telephone and Fax Nos..
NAME OF DESIGNATED BANKS as per attached List:
(i) The Banks shall be the Banks recognized notified by the Finance Department,
Government of Gujarat (GOG) from time to time.
(ii) Bank Guarantee should be confirmed through Structured Financial Messaging
PUR-F-10 ET-248
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
For Supply Period (Security Deposit)
as per Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of the
Branch giving the Bank Guarantee) having our registered Office at
office) hereby give this Bank Guarantee No. __________________________________ dated
_________________ and hereby agree unequivocally and unconditionally to pay immediately on
demand in writing from the Gujarat State Electricity Corporation Limited, or any
Officer authorized by it in this behalf any amount up to and not exceeding Rs. _____________
(Amount of Performance Guarantee towards execution/supply period ) Rupees
Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract for the
supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be terminable by
notice or by change in the constitution of the Bank or the firm of Contractors /
Suppliers or by any other reason whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given
conceded or agreed, with or without our knowledge or consent, by or between parties to the said
within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not
be entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is
guarantee shall remain in force until _______________ (date of validity of the Bank
Guarantee).Unless demands or claims under this Bank Guarantee are made to us in writing on
or before _____________ (Date of validity of the Bank Guarantee, claim period 1 year after
validity of BG), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we
shall be released and discharged from all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS as per attached List:
(i) The Banks shall be the Banks recognized notified by the Finance Department,
Government of Gujarat (GOG) from time to time.
(ii) Bank Guarantee should be confirmed through Structured Financial Messaging
PUR-F-10 ET-248
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(For Performance Guarantees (PBG) towards Guarantee / Warranty period as per
Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of the
Branch giving the Bank Guarantee) having our registered Office at ____________________
______________________________________________ (Address of Bank’s registered office) hereby give
this Bank Guarantee No. _______________________________________ dated _____________ and hereby
agree unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited, or any Officer authorized by it in this
behalf any amount up to and not exceeding Rs. _____________ (Amount of Performance
Guarantee towards Guarantee/Warranty period) Rupees ________
Electricity Corporation Limited on behalf of M/s.______________________________
____________________ who have entered into a contract for the supply / works specified below:
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be terminable by
notice or by change in the constitution of the Bank or the firm of Contractors /
Suppliers or by any other reason whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given
conceded or agreed, with or without our knowledge or consent, by or between parties to the said
within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not
be entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is
guarantee shall remain in force until _______________ (date of validity of the Bank
Guarantee).Unless demands or claims under this Bank Guarantee are made to us in writing on
or before _____________ (Date of validity of the Bank Guarantee, claim period 1 year after
validity of BG), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we
shall be released and discharged from all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS as per attached List:
(i) The Banks shall be the Banks recognized notified by the Finance Department,
Government of Gujarat (GOG) from time to time.
(ii) Bank Guarantee should be confirmed through Structured Financial Messaging
PUR-F-10 ET-248
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(Combined Performance Guarantees (PBG) towards Execution / Supply period and
Guarantee / Warranty period as per Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of the
Branch giving the Bank Guarantee) having our registered Office at _________________________
_________________________________________ (Address of Bank’s registered office) hereby give this
Bank Guarantee No. _______________________________________ dated _________________ and hereby
agree unequivocally and unconditionally to pay immediately on demand in writing from the
Gujarat State Electricity Corporation Limited, or any Officer authorized by it in this
behalf any amount up to and not exceeding Rs. _____________ (Amount of Combined Performance
Guarantees (PBG) towards Execution/Supply period and Guarantee/Warranty period) Rupees
State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract for the
supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be terminable by
notice or by change in the constitution of the Bank or the firm of Contractors /
Suppliers or by any other reason whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made, given
conceded or agreed, with or without our knowledge or consent, by or between parties to the said
within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e. GSECL).
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not
be entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is
guarantee shall remain in force until _______________ (date of validity of the Bank
Guarantee).Unless demands or claims under this Bank Guarantee are made to us in writing on
or before _____________ (Date of validity of the Bank Guarantee, claim period 1 year after
validity of BG), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we
shall be released and discharged from all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS as per attached List:
(i) The Banks shall be the Banks recognized notified by the Finance Department,
Government of Gujarat (GOG) from time to time.
(ii) Bank Guarantee should be confirmed through Structured Financial Messaging
PUR-F-10 ET-248
Financial Department, GR.No. FD/MSM/e-file/4/2025/2712/DMO Dtd.
[To be revised as per GoG notification issued from time to time.]
List of Banks Notified by GSECL
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent
All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD/EMD for period up
to March 31, 2027. The validity cut-off date in the GR is with respect to date of
issue of Bank Guarantee irrespective of date of termination of Bank Guarantee.
No. Name of Banks No. Name of Banks
1 AXIS Bank 23 A U Small Finance Bank
2 Bandhan Bank 24 City Union Bank
3 CSB Bank 25 DBS Bank India Limited
4 DCB Bank 26 Dhanlaxmi Bank
5 Equitas Small Finance Bank 27 Federal Bank
6 HDFC Bank 28 HSBC Bank
7 ICICI Bank 29 IDBI Bank
8 IDFC First Bank 30 IndusInd Bank
9 Jammu and Kashmir Bank 31 Jana Small Finance Bank
10 Karnataka Bank 32 Karur Vysya Bank
11 Kotak Mahindra Bank 33 RBL Bank
12 South Indian Bank 34 Standard Charter Bank
13 Tamilnad Mercantile Bank 35 Ujjivan Small Finance Bank
14 YES Bank 36 Ahmedabad Mercantile Co-
15 Nutan Nagrik Sahakari Bank 37 Rajkot Nagrik Sahakari Bank
16 Sarswat Co-Operative Bank 38 SBPP Co-operative Bank Ltd.
17 SVC Co-Operative Bank Ltd. 39 The Cosmos Co-op Bank Ltd.
18 The Gujarat State Co- 40 The Surat District Co-operative
Operative Bank Bank
19 The Surat Peoples Co- 41 The Baroda Central Co-operative
operative Bank Ltd. Bank
20 The Panchmahal District Co- 42 The Kalupur Commercial Co-Op.
operative Bank Bank
21 The Rajkot Commercial Co- 43 The Banskantha Mercantile Co-
operative Bank operative Bank Ltd.
22 Gujarat Gramin Bank
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document ET-248.pdf
Commercial Terms and Conditions.pdf
Labour Laws.pdf
Safety Rules.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].