Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹1.5 Cr+₹6.1 L (4.94%)Accepted-AOC C O RAGHUNATH NAYAK AT PO PS BELGHAR VIA TUMUDUBANDHA DIST KANDHAMAL ODISHA PIN 762107 | BELGHAR | KANDHAMAL | ODISHA | 762107 | ₹1.5 Cr+₹6.1 L (4.94%) Quoted ₹1.3 Cr | L3 | Accepted-AOC The L3 bidder, after availing the 10 percent price preference as per Govt. Resolution No. 16262 dated 30.10.2018, has become the L1 bidder. |
| 2 | L1₹1.2 CrRejected-Finance AT PO CONTRACTOR PADA PHULBANI | PHULBANI | KANDHAMAL | ODISHA | 762001 | ₹1.2 Cr | L1 | Rejected-Finance The L3 bidder, after availing the 10 percent price preference as per Govt Resolution No 16262 dated 30.10.2018 has become the L1 bidder. |
| 3 | L2₹1.3 Cr+₹5.9 L (4.79%)Rejected-Finance | ₹1.3 Cr+₹5.9 L (4.79%) | L2 | Rejected-Finance Bid rank is L2 |
| 4 | L4₹1.5 Cr+₹28.8 L (23.3%)Rejected-Finance | ₹1.5 Cr+₹28.8 L (23.3%) | L4 | Rejected-Finance Bid rank is L4 |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
16 Feb 2026, 5:00 pmClosed
PA ITDA, Phulbani
ITDA, Phulbani
Construction of 50 seated Primary School Hostel at Damingia AS under Phiringia Block
2026_STSCD_125326_1
PA ITDA PLB_04 of 2025-26
Open Tender
Civil Works - Buildings
Percentage
270 days
Office of the PA, ITDA, Phulbani
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.5 L
Yes
2 Apr 2026
2 Feb 2026
17 Feb 2026
2 Feb 2026
16 Feb 2026
2 Feb 2026
Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5 m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge.
Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other taxes if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge.
CC (1:3:6) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and taxes of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge.
Rigid smooth centering and shuttering for Mass concrete including dismantling them after csting including all cost, conveyance, taxes of materials and labour with T&P required for the work etc.
Fly ash Brick Masonry in C.M. (1:6) in Superstructure using 23cm x 11cm x 8cm size fly ash Brick including watering and curing, cost, conveyance,taxes and royalties and labour require for the work etc complete. (A) GROUND FLOOR
(B) FIRST FLOOR
RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all taxes of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. (A) GROUND FLOOR i) Column base & Footing
ii) Plinth Bend
iii) Column & Beam
iv) Lintel Bend
v) Chhaja
vi) Roof Slab
vii) Stair case excluding landing slab
(B) FIRST FLOOR i) Column & Beam
ii) Lintel Bend
iii) Chhaja
iv) Roof Slab
v) Stair case excluding landing slab
Supplying, fitting and placing uncoated HYSD bars reinforcement tying the grills, straighten placing them in position including cost of bindings wire 18 to 20mm gauge including cost of HYSD bar with conveyance and royalty etc. complete and as per technical specification and direction of Engineer-in charge. (A)GROUND FLOOR
(B)FIRST FLOOR
Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of 6mm size black. (A) FIRST FLOOR
20mm Thick C.P in C.M (1:6) over stone massonaryafter racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge.
16mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. (A) GROUND FLOOR
(B) FIRST FLOOR
12mm thick cement plaster (1:6) in cement mortar finished smooth surface on brick wall after racking out joints including watering curing to required period including cost conveyance, royalty of all materials, T&P complete etc. as per specification and direction of Engineer in charge. (A) GROUND FLOOR
(B) FIRST FLOOR
Fixing Vetrified tiles in dado, skirting & riser of steps on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete. (A) GROUND FLOOR
(B) FIRST FLOOR
6mm thick C.P. in CM (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with cost, conveyance, royalty, taxes of all materials & complete work. (A) GROUND FLOOR
(B) FIRST FLOOR
Fixing Vetrified tiles in floors, treads on steps and landing on 20mm thick bed of cement mortar 1:4 (1 cement: 4 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing etc. complete. (A) GROUND FLOOR
(B) FIRST FLOOR
Fixing glazed tiles in floors, treads on steps and landing on 25mm thick bed of cement mortar 1:1 (1 cement: 1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing, cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. (A) GROUND FLOOR
(B) FIRST FLOOR
Fixing glazed tiles in dado, skirting and risers of steps on 12mm thick cement plaster (1:3) joint with neat cement slurry mixed with pigment to match the shade of the tiles including cost, conveyance, royalty, taxes of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. (A) GROUND FLOOR
(B) FIRST FLOOR
Fixing of Chequred tiles in floors tread or steps and landing on 25mm thick bed on CM(1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing including cost, conveyance and tax of tile etc complete. (A) GROUND FLOOR
(B) FIRST FLOOR
Finishing surface of walls with acrylic wall putty (Water based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes, labour T&P etc complete. (A) GROUND FLOOR
(B) FIRST FLOOR
Weather coating two coats to wall with approved shade over one coat of Wall primer on new work to give on even shade including cost of Weather coat per 1 sqm . (A) GROUND FLOOR
(B) FIRST FLOOR
Wall painting two coats with plastic emulsion paint with approved plastic paint and one coat primer on wall after scraping and cleaning the surface including watering and curring all cost of materials, scaffolding, labour with T&P etc. complete as per direction of Engineer-in-charge. (A) GROUND FLOOR
(B) FIRST FLOOR
Supplying of MS grill gate, MS angle chowkhat of approved specification for doors and windows welded with MS sheet shutters of 18 to 20 gauge thick, openable and electrically welded with all necessary fittings including cost of all materials, labour, T&P, transportation to worksite etc all complete in all respect.
Labour for fitting and fixing of MS doors and windows, MS grill gate as per approved design & all complete.
Painting two coats of synthetic enamel paint over a coat of primer of approved quality, brand and shade including smoothening the surface by sand paper and filler etc complete with cost, conveyance, royalty, taxes of all materials, labours T&P required as per specification and direction of Engineer-in-charge. (A) GROUND FLOOR
(B) FIRST FLOOR
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.28 MB
Tendernotice_2.pdf
PDF • 1.42 MB
BOQ_578658.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .