| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance NEAR SBI TAKULA ROAD DISTT BAGESHWAR | ₹1.9 Cr | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4.1 L
Closing Date
9 Jul 2020, 3:00 pmClosed
Superintending Engineer
Superintending Engineer 1st Cirle P.W.D. Almora
Renewal work Chandra Singh Sahi Motor Road and Kapkot Pindari Glacier Motor Road
2020_pwd_24509_1
1782/Nivida-01/20 dated 17-06-2020
Open Tender
Civil Works
Item Rate
365 days
Kapkote
As per technical bid
2 documents required · 2 mandatory
₹5,900
EE CD PWD Kapkote
₹4.1 L
Almora
18 Jul 2020
23 Jun 2020
9 Jul 2020
24 Jun 2020
9 Jul 2020
2 Jul 2020
1 Jul 2020
Amount
Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Tack coat using VG-10 grade bitumen Over normal bituminous surfaces @0.35kg/sqm,
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete all respects Grading II - 10mm using VG - 10 bitumen (Density 2.31 tonne /cum for SDBC .Grading II Bituminous contant 5% by weight of total Mixed VG -10 bitumen)
Construction of unlined surface drains of average cross-sectional area 0.40sqm in soil to specified lines, grades, levels and dimensions. Excavated
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .