Loading…
Loading…
Tender Value
₹6.8 L
EMD Value
₹16,921
Closing Date
1 Oct 2026, 6:00 pm4d left
Executive Engineer
Executive Engineer
Proj No 39 27 Maintenance of Transferred Institutions Govt UPS Kunnukuzhy maintenance and Retaining wall construction in Kannamoola ward
2026_LSGD_872595_2
EE(C)/PLANFUND TENDER/2026-27 (6)
Open Tender
Civil Works - Buildings
Item Wise
180 days
Thiruvananthapuram
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,495
Yes
₹16,921
Yes
24 Sept 2026
24 Sept 2026
3 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RETAINING WALL | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 22.4 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 5 | cum | - | - |
| 1.003 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.2 | cum | - | - |
| 1.004 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 12 | sqm | - | - |
| 1.005 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 15 | cum | - | - |
| 1.006 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 100 | sqm | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,148 | kilogram | - | - |
| 1.008 | OD108215/2026-2027:PVC WEEP HOLES. Providing weep holes using 75mm dia. PVC pipes working pressure 4Kg/sq.cm includin cost of materials, conveyance, labour charges etc complete. | 24 | metre | - | - |
| 1.009 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 20 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
nit.pdf
Tender Documents • 0.36 MB
epay.pdf
Tender Documents • 0.23 MB
integrity.pdf
Tender Documents • 0.23 MB
affidavit.pdf
Tender Documents • 0.27 MB
viewsbd.pdf
Tender Documents • 1.89 MB
BOQ_1479921.xls
BOQ • 0.24 MB
fot.pdf
Tender Documents • 0.28 MB
preagmnt.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .