| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹7.1 L+₹12,730 (1.82%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Bianca E Dias L2 | Bjorn Socrates Dias L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil,silt, sand, clay, gravel moorum of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated submerged, foul conditions etc including pumping or bailing out water/ dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. backfilling the excavated earth to the extent required and disposing of the surplus excavated soil/ rock at specified areas within intial lead of 50 mtrs and all lifts etc. as per specification and drawing and as directed by the Engineer in charge etc complete. | 68.4 | Cum | 270 ₹18,468 | 220 ₹15,048 Lowest |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 13.68 | Cum | 2,375 ₹32,490 | 1,200 ₹16,416 Lowest |
| 3.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: b) Above 2.50 meters upto 3.50 meters long pile | 133 | Metre | 190 ₹25,270 | 125 ₹16,625 Lowest |
| 4.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured) b )Above 2.50 meters upto 3.50 meters long pile | 117.8 | Metre | 340 ₹40,052 | 180 ₹21,204 Lowest |
| 5.00 | Centering & shuttering including Strutting, Propping & removal of forms for : i)Foundations, Footings, Bases for columns | 137.4 | Sq.m | 415 ₹57,021 | 300 ₹41,220 Lowest |
| 6.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level | 72.54 | Cum | 7,400 ₹5,36,796 Lowest | 8,100 ₹5,87,574 |
| 7.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge a) 110 mm dia | 14.4 | RM | 270 ₹3,888 | 220 ₹3,168 Lowest |
Tender Value
₹8.3 L
EMD Value
₹16,600
Closing Date
18 Aug 2025, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Construction of retaining wall behind Smt. Shoba Vaigankar house at Mala in Panaji Constituency.
2025_WRD_24099_1
6-9/WDI/WRD/ASW/2025-26/e-17/7
Open Tender
Miscellaneous Works
Item Rate
45 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹16,600
22 Sept 2025
5 Aug 2025
19 Aug 2025
5 Aug 2025
18 Aug 2025
5 Aug 2025
Amount
Earthwork in excavation by mechanical/manual means in all types of strata comprising any of the materials such as soil,silt, sand, clay, gravel moorum of all varieties shingles, pebbles, all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered, decomposed rock and all such other materials either in full or in parts as the case may be by adopting any approved method or methods as may be convenient or permitted inclusive of chiseling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated submerged, foul conditions etc including pumping or bailing out water/ dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. backfilling the excavated earth to the extent required and disposing of the surplus excavated soil/ rock at specified areas within intial lead of 50 mtrs and all lifts etc. as per specification and drawing and as directed by the Engineer in charge etc complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: b) Above 2.50 meters upto 3.50 meters long pile
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile complete at site (portion in ground only to be measured) b )Above 2.50 meters upto 3.50 meters long pile
Centering & shuttering including Strutting, Propping & removal of forms for : i)Foundations, Footings, Bases for columns
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a)All works upto plinth level
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge a) 110 mm dia
Bianca E Dias (BID ID -51710)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .