Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-Finance | L1 | Accepted-Finance L1 in Financial Bid | |
| 2 | L2₹7.9 L+₹932.57 (0.12%)Rejected-Finance | L2 | Rejected-Finance L2 in Financial Bid | |
| 3 | L3₹7.9 L+₹1,078.02 (0.14%)Rejected-Finance | L3 | Rejected-Finance L3 in Financial Bid |
| Sl No | Description | Qty | Unit | SS BUILDERS AND CONSULTANT L3 | M/s Rakesh Kumar L2 | BASERA DEVELOPERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete. | 99.37 | cum | 64 ₹6,359.68 | 63 ₹6,260.31 Lowest | 63 ₹6,260.31 Lowest |
| 2.00 | Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | 13.54 | sqm | 244 ₹3,303.76 | 243 ₹3,290.22 Lowest | 243 ₹3,290.22 Lowest |
| 3.00 | Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | 8.74 | cum | 5,987 ₹52,326.38 | 5,987 ₹52,326.38 | 5,985 ₹52,308.9 Lowest |
| 4.00 | 1st Class brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | 43.61 | cum | 5,480 ₹2,38,982.8 | 5,480 ₹2,38,982.8 | 5,478 ₹2,38,895.58 Lowest |
| 5.00 | Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. | 32.99 | sqm | 684 ₹22,565.16 | 683 ₹22,532.17 | 682 ₹22,499.18 Lowest |
| 6.00 | R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. | 14.39 | Cum | 7,428 ₹1,06,888.92 | 7,428 ₹1,06,888.92 | 7,425 ₹1,06,845.75 Lowest |
| 7.00 | Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | 1.19 | M.T | 97,235 ₹1,15,709.65 | 97,236 ₹1,15,710.84 | 97,230 ₹1,15,703.7 Lowest |
| 8.00 | P.C.C.1:6:12 in approch slab including all cost of material, labour and T&P etccomplete. | 1.91 | cum | 5,556 ₹10,611.96 Lowest | 5,557 ₹10,613.87 | 5,556 ₹10,611.96 Lowest |
| 9.00 | Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | 61.5 | sqm | 105 ₹6,457.5 | 105 ₹6,457.5 | 104 ₹6,396 Lowest |
| 10.00 | S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. | 2 | Rm | 239 ₹478 | 239 ₹478 | 238 ₹476 Lowest |
Tender Value
₹7.9 L
EMD Value
₹15,800
Closing Date
25 Mar 2026, 12:00 pmClosed
E.E
MGCCD-3 Amroha
LOT 06 CONSTRUCTION OF V.R.B AT KM 2.350 OF HANDALPUR MINOR OF MGC-II
2026_UPIDC_1123188_12
02/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
MGCCD-3 Amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
Yes
₹15,800
28 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in Foundation in ordinary soil including lead up to 30 m. , ramming and dressing the surface up to required level , slope and all labour, T&P etc.complete. | |||||
| 2Shuttering for P.C.C. including all cost of material, labour and T&P etc complete. | |||||
| 3Providing and laying P.C.C. 1:3:6 in foundation including all cost of material, labour and T&P etc. complete. | |||||
| 41st Class brick work in 1:4 cement coarse sand mortar including all cost of material, labour and T&P etc. complete. | |||||
| 5Shuttering for R.C.C. including all cost of material, labour and T&P etc. complete. | |||||
| 6R.C.C.(M – 20) in 1:1.5:3 including all cost of material, labour and T&Petc complete. | |||||
| 7Supplying and placing steel reinforcement for RCC work in including all cost of material, labour , cutting, bending, binding and T&P complete | |||||
| 8P.C.C.1:6:12 in approch slab including all cost of material, labour and T&P etccomplete. | |||||
| 9Struck deep Pointing in 1:2 cement mortar including all cost of material, labour and T&P etc complete. | |||||
| 10S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.39 MB
LOT06.pdf
Tender Documents • 2.99 MB
BOQ_2103444.xls
BOQ • 0.28 MB
RETENDER06.pdf
Additional Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .