Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹98.6 L
EMD Value
₹99,000
Closing Date
7 Mar 2024, 12:00 pmClosed
Executive Engineer, Boleng Divn. PWD
Office of the Executive Engineer, Boleng Division PWD, PO/PS-Boleng, District-Siang, PIN-791103
Construction of Helipad at Lampang (Pangin).
2024_PWDAP_1749_1
BD/e-NIT/SIDF/2023-24/09
Open Tender
Civil Works
Item Rate
365 days
Lampang (Pangin)
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,500
EE PWD Boleng
₹99,000
Office of the Executive Engineer, Boleng Divn. PWD
7 Mar 2024
1 Mar 2024
7 Mar 2024
1 Mar 2024
7 Mar 2024
1 Mar 2024
5 Mar 2024
Amount
SH:I (Jungle Clearance)
Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) (I) By Manual Means:- B) In area of thorny jungle
SH:-Site development (Earth Cutting/Levelling).
Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto distance of 100 metres ( average lead 50 metres), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
SH:-Approach Road
Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
SH:-Boundary Wall With MS Gate
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposit layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in: a) Foundation and plinth.
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundations, footings, bases of column and mass concrete.
Brick work with best available local bricks in foundations and plinth in cement mortar 1:4(1cement:4 fine sand)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. RCC Grade M20 Height upto 5m Case-I Using concrete Mixer
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications.
Providing and fixing MS gate as per technical drawing and specification complete.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular Materials
SH:-CC SURFACE FOR LANDING AREA
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) Granular Sub-Base
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.) Dry Lean Cement Concrete
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip,dowel bar, tie rod, admixtures as approved, curing compound, finishing tolines and grades as per drawing. ) Pavement Quality Concrete
M/s Continental Traders
stage.html
html • 0.02 MB
finance_1885.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .