| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹14.3 LAccepted-AOC AT PO PS JAGANNATHPRASAD DIST GANJAM ODISHA | GANJAM | ODISHA | ₹14.3 L | L2 | Accepted-AOC work order win through lottery system |
| 2 | L1₹14.2 LRejected-Finance | ₹14.2 L | L1 | Rejected-Finance Not Qualified |
| 3 | L2₹14.3 LRejected-AOC | ₹14.3 L | L2 | Rejected-AOC not qualify through lottery system |
| 4 | L2₹14.3 LRejected-AOC CONTRACTOR RAJGANGPUR | ₹14.3 L | L2 | Rejected-AOC not qualify through lottery system |
| 5 | L2₹14.3 LRejected-AOC | ₹14.3 L | L2 | Rejected-AOC not qualify through lottery system |
Tender Value
₹16.8 L
EMD Value
₹16,781
Closing Date
21 Jan 2026, 5:00 pmClosed
Divisional Forest Officer
O/o the Divisional Forest Officer, Rourkela Forest Division
Construction of Large Water Body at Forest Block CHHATAM
2026_DFORL_124364_1
BID No. 05 of 2025-26 dtd.07.01.2026
Open Tender
Civil Works - Water Works
30 days
Chhatam at Rajgangpur
2 documents required · 2 mandatory
₹7,080
Yes
₹16,781
Yes
11 Mar 2026
12 Jan 2026
22 Jan 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
12 Jan 2026 - 21 Jan 2026
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC.
Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc. inter spread with boulders up to 1/2 Cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineering- charge including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete within an initial lead of 1km from the place of excavation complete.
Ramming or rolling eath work with light H.R.R. in embankment in layers not exceeding 0.3m including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC.
Fine dressing and turfing with initial lead of 50 m & Extra lead of 100 m and 1.5 m initial lift & Extra lift of 4.5 m including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work Labour welfare cess@1% etc. complete as per the direction of the EIC.
Construction of Stone Gabion Structure with GI Wire mesh & rough stone as per approved drawing & design including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.
Earth work in excavation of foundation in all kinds of soil within initial lead and initial lift including rough dressing and breaking rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.
Supplying, Filling sand in foundation & plinth well watered and rammed including cost, conveyance, taxes, royalty of sand, labour & T&P, Labour welfare cess@1% etc. complete as per specification and direction of the EIC.
Cement Concrete (1:3:6) by using 40 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.
Plain cement concrete (1:2:4) using 12 mm size hard granite crusher broken chips of approved quality and form approved quarry including lowering laying concrete, watering and curing etc. complete for required levels laid in layers including cost and conveyance, royalty & taxes of all materials and cost of all labour T&P required for the work,Labour welfare cess@1% etc. complete as per the direction of the EIC.
Rigid and smooth centering & shutering for RCC work including false works & dismentalling then after casting including cost, conveyance and taxes of all materials and cost of labour, T&P required for the work etc. complete as per specification and direction for the EIC. -RCC foundation and plinth band footings,bases of columns. Mass concrete & pre cast slabs
Supplying MS round / deformed / tor steel reinforcement bars of approved companies & grade of required diameters of approved quality including straightening, cutting to size, bending, and binding, lifting and placing in position as per design, complete including cost of bars, binding wires 18 gauge, including cost of all materials , labour, conveyance, loading and unloading, taxes, cess, royalties. sundries, tools and plants etc. Labour Welfare cess @1% complete as per the direction of the EIC. (Linear measurement will be taken and quantity will be calculated on standard weight for all heights).
Providing & erecting of project display board as per approved design by department.
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_575008.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
LWBChhatam.pdf
Tender Documents • 0.81 MB
BOQ_575008.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid