| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹1.9 Cr+₹5.9 L (3.20%)Rejected-AOC | ₹1.9 Cr+₹5.9 L (3.20%) | L2 | Rejected-AOC Highest |
| 3 | L3₹1.9 Cr+₹7.3 L (3.99%)Rejected-AOC 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹1.9 Cr+₹7.3 L (3.99%) | L3 | Rejected-AOC Highest |
| 4 | L4₹2.0 Cr+₹13.0 L (7.04%)Rejected-AOC | ₹2.0 Cr+₹13.0 L (7.04%) | L4 | Rejected-AOC Highest |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | sunil verma L4 | TANUJ SHARMA L2 | sanjeev kumar L3 | Abhishek Bhardwaj L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring/strutting, planking, timbering & dewatering wherever required, stacking the useable & unuseable material/soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration of metaled unmetalled surfaces & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. (For Intake Structure) | 950.95 | Cum | 399 ₹3,79,429.05 | 495 ₹4,70,720.25 | 851 ₹8,09,258.45 | 235 ₹2,23,473.25 Lowest |
| 2.00 | Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring/strutting planking, timbering & dewatering wherever required, stacking the useable & unuseable material/soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration of metaled, unmetalled surfaces & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. (For Rising Main) | 835.6 | Cum | 299 ₹2,49,844.4 | 250 ₹2,08,900 | 151 ₹1,26,175.6 Lowest | 235 ₹1,96,366 |
| 3.00 | Providing and laying cement concrete 1:3:6 (1: cement :3 sand :6 graded crushed stone agg. of 40mm. Nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per direction of the Engineer-in-charge. | 49 | Cum | 6,109 ₹2,99,341 | 6,800 ₹3,33,200 | 7,551 ₹3,69,999 | 6,000 ₹2,94,000 Lowest |
| 4.00Providing and laying cement concrete 1:1.5:3 (1: cement:1.5 sand :3 graded crushed stone agg. of 20mm. Nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | |||||||
| 5.00 | Foundation footing bases of column and the like mass concrete with in all leads and lifts as per direction of the Engineer-in-charge. | 124.62 | Cum | 7,199 ₹8,97,139.38 Lowest | 7,800 ₹9,72,036 | 10,551 ₹13,14,865.62 | 8,500 ₹10,59,270 |
| 6.00 | Wall (any thickness but not less than 0.10 mtr. Thickness) including attached pilasters buttersses, plinth and string courses etc, from top of foundation upto floor two level complete in all respect with in all leads and lift as per direction & satisfaction of the Engineer-in-charges. | 64.14 | Cum | 7,199 ₹4,61,743.86 Lowest | 7,800 ₹5,00,292 | 10,651 ₹6,83,155.14 | 8,800 ₹5,64,432 |
| 7.00 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever upto floor two level with in all leads & lifts as per direction & entire satisfaction of the Engineer in-charge. | 110.23 | Cum | 7,199 ₹7,93,545.77 Lowest | 7,800 ₹8,59,794 | 10,751 ₹11,85,082.73 | 9,000 ₹9,92,070 |
| 8.00 | Providing and laying Cement concrete flooring 1:2:4 (1:cement :2 sand:4 graded crushed stone aggregate of 20mm nominal size) and curing complete laid in one layer finished with a floating coat of neat cement 40mm thick with in all leads and lifts as per the direction and satisfaction of the Engineer-in-charge. | 207.34 | Sqm | 309 ₹64,068.06 Lowest | 350 ₹72,569 | 651 ₹1,34,978.34 | 475 ₹98,486.5 |
| 9.00 | Providing mild steel/tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level with in all leads & lifts as per direction & entire satisfaction of the Engineer - in-charge. | 48,430.5 | Kg | 83 ₹40,19,731.5 Lowest | 98 ₹47,46,189 | 91 ₹44,07,175.5 | 96 ₹46,49,328 |
| 10.00Providing form work with steel plates 3.15mm. thick welded with angle iron in frame 30x30x5mm. So as to give a fair finish including centering shuttering strutting and propping etc, with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu reinforced concrete and plain concrete work in:- | |||||||
Tender Value
₹2.5 Cr
EMD Value
₹3.2 L
Closing Date
17 Jul 2026, 11:00 amClosed
EE
Jal Shakti Division Jawalamukhi
Relocation Reconstruction of various Lift water schemes
2026_HPIPH_138434_1
JAM-KNG02-742
Open Tender
Civil Works
Item Rate
180 days
Jawalamukhi
Please refer Tender documents.
8 documents required · 8 mandatory
₹7,000
EE Jawalamukhi
₹3.2 L
10 Sept 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation, trenches upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring/strutting, planking, timbering & dewatering wherever required, stacking the useable & unuseable material/soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration of metaled unmetalled surfaces & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. (For Intake Structure) | 950.95 | Cum | - | - |
| 2 | Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring/strutting planking, timbering & dewatering wherever required, stacking the useable & unuseable material/soil separately & after laying jointing & testing of pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoited layer by ramming & watering & then disposing of all surplus excavated soil /unusable material as directed with in all leads & lifts including restoration of metaled, unmetalled surfaces & including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. (For Rising Main) | 835.6 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:3:6 (1: cement :3 sand :6 graded crushed stone agg. of 40mm. Nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per direction of the Engineer-in-charge. | 49 | Cum | - | - |
| 4 | Providing and laying cement concrete 1:1.5:3 (1: cement:1.5 sand :3 graded crushed stone agg. of 20mm. Nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | - | - | - | - |
| 5 | Foundation footing bases of column and the like mass concrete with in all leads and lifts as per direction of the Engineer-in-charge. | 124.62 | Cum | - | - |
| 6 | Wall (any thickness but not less than 0.10 mtr. Thickness) including attached pilasters buttersses, plinth and string courses etc, from top of foundation upto floor two level complete in all respect with in all leads and lift as per direction & satisfaction of the Engineer-in-charges. | 64.14 | Cum | - | - |
| 7 | Suspended floor roofs, landing and shelves and their support balconies, beams, girders, bressumers and contilever upto floor two level with in all leads & lifts as per direction & entire satisfaction of the Engineer in-charge. | 110.23 | Cum | - | - |
| 8 | Providing and laying Cement concrete flooring 1:2:4 (1:cement :2 sand:4 graded crushed stone aggregate of 20mm nominal size) and curing complete laid in one layer finished with a floating coat of neat cement 40mm thick with in all leads and lifts as per the direction and satisfaction of the Engineer-in-charge. | 207.34 | Sqm | - | - |
| 9 | Providing mild steel/tor steel reinforcement for RCC work including bending, binding and placing in position complete upto floor two level with in all leads & lifts as per direction & entire satisfaction of the Engineer - in-charge. | 48,430.5 | Kg | - | - |
| 10 | Providing form work with steel plates 3.15mm. thick welded with angle iron in frame 30x30x5mm. So as to give a fair finish including centering shuttering strutting and propping etc, with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu reinforced concrete and plain concrete work in:- | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_205061.xls
BOQ • 0.36 MB
Termsandconditions.pdf
Tender Documents • 0.84 MB
Form6.pdf
Tender Documents • 0.43 MB
Form8.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .