| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91,645Accepted-Finance | ₹91,645 | L1 | Accepted-Finance 1ST LOWEST |
| 2 | L2₹97,000+₹5,355 (5.84%)Rejected-Finance | ₹97,000+₹5,355 (5.84%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹98,090+₹6,445 (7.03%)Rejected-Finance | ₹98,090+₹6,445 (7.03%) | L3 | Rejected-Finance 3RD LOWEST |
| 4 | L4₹1.3 L+₹38,355 (41.9%)Rejected-Finance | ₹1.3 L+₹38,355 (41.9%) | L4 | Rejected-Finance 4TH LOWEST |
| 5 | L5₹1.6 L+₹68,833.85 (75.1%)Rejected-Finance 0 EROO ARU GAM TA JALAPORE DI NAVSARI 814 NAVSARI GUJARAT 396450 UDYAM GJ 16 0010444 | NAVSARI | GUJARAT | 396450 | ₹1.6 L+₹68,833.85 (75.1%) | L5 | Rejected-Finance 5THJ LOWEST |
| Sl No | Description | Qty | Unit | GPS2 SURVEY ENGINEERING L3 | G.TECH INDIA L4 | C.R. ENGINEERING AND SURVEYS L2 | DISHA ENTERPRISE L5 | GEOCON INDIA L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Mobilisation Charges of all tools & Plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different Bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of Engineer-in-Charge. Detailed Investigation | 2 | L.S | 15,000 ₹30,000 | 13,000 ₹26,000 | 2,500 ₹5,000 | 22.84 ₹45.69 Lowest | 9,685 ₹19,370 |
| 2.00 | Carriage of all Disturbed & Undisturbed Samples from site of work to the Divisional office or elsewhere including loading and unloading as per direction of Engineer-in-Charge. Detailed Investigation. | 1 | L.S | 1,000 ₹1,000 | 2,010 ₹2,010 | 500 ₹500 Lowest | 1,462 ₹1,462 | 1,000 ₹1,000 |
| 3.00 | Labour for making Bore-Holes of 150mm to 250 mm dia. by any standard method to any depth below ground level / bed level in all kinds of soil like clay, silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of collecting Disturbed & Un disturbed soil samples, conducting Standard Penetration Test at suitable intervals etc.) including preparation and submission of bore-log as per IRC : 75 and 78 and Clause 2400 of Specifications for Road & Bridge Works (5th Revision), Published by IRC, and also including hire charges of tools and plants complete as per the direction of Engineer-in-Charge. When drilling mud “Bentonite of suitable consistency” is used to prevent collapse of bore hole Depth 0m to 10m | 30 | Mtr | 550 ₹16,500 | 300 ₹9,000 | 250 ₹7,500 Lowest | 310.6 ₹9,318 | 500 ₹15,000 |
| 3.01 | Depth greater than 10 Mtr. and up to 20 Mtr. | 30 | Mtr | 550 ₹16,500 | 315 ₹9,450 | 250 ₹7,500 Lowest | 365.5 ₹10,965 | 500 ₹15,000 |
| 3.02 | Depth greater than 20 Mtr. and up to 30 Mtr. | 30 | Mtr | 550 ₹16,500 | 325 ₹9,750 | 275 ₹8,250 Lowest | 429.46 ₹12,883.8 | 500 ₹15,000 |
| 4.00 | A. Laboratory Investigation Liquid Limit as per IS 2720 (Part – V). | 16 | Each | 10 ₹160 Lowest | 200 ₹3,200 | 175 ₹2,800 | 319.81 ₹5,116.96 | 100 ₹1,600 |
| 4.01 | Plastic Limit as per IS 2720 (Part – V) | 18 | Each | 10 ₹180 Lowest | 200 ₹3,600 | 200 ₹3,600 | 319.81 ₹5,756.58 | 100 ₹1,800 |
| 4.02 | Grain size analysis by Sieving as per IS 2720 (Part – IV). | 18 | Each | 10 ₹180 Lowest | 350 ₹6,300 | 350 ₹6,300 | 484.28 ₹8,717.04 | 100 ₹1,800 |
| 4.03 | Grain size analysis by Hydrometer Method as per IS 2720 (Part – IV). | 18 | Each | 10 ₹180 Lowest | 350 ₹6,300 | 300 ₹5,400 | 630.48 ₹11,348.64 | 100 ₹1,800 |
| 4.04 | Determination of Water Content as per IS 2720 (Part – II). | 18 | Each | 10 ₹180 Lowest | 140 ₹2,520 | 200 ₹3,600 | 127.92 ₹2,302.56 | 100 ₹1,800 |
Tender Value
Refer Docs
EMD Value
₹4,708
Closing Date
10 Aug 2026, 12:00 pmClosed
EX.ENGG.NORTH 24PGS.DIVN.S.S.P.W.DTE.BARASAT
N/70/2 Banamalipur Road Barasat North 24 Parganas.
Sub-soil Investigation for 3(three) nos bore holes for Construction of 01 (one) building less Community Health Centre (CHC) in under XV-FC HG for FY 2025-26. at Sundarpur BPHC under Bongaon Block
2026_WBPWD_5017459_2
WBSSPWD/EE/24PN/NIQ 04/2026_2027
Open Tender
CIVIL WORKS
Item Rate
15 days
Sundarpur
AS PER NIQ
5 documents required · 5 mandatory
₹4,708
Yes
31 Aug 2026
27 Jul 2026
12 Aug 2026
1 Aug 2026
10 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Mobilisation Charges of all tools & Plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different Bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of Engineer-in-Charge. Detailed Investigation | - | L.S | 4,755.4 | - |
| 2 | Carriage of all Disturbed & Undisturbed Samples from site of work to the Divisional office or elsewhere including loading and unloading as per direction of Engineer-in-Charge. Detailed Investigation. | - | L.S | 4,755.4 | - |
| 3 | Labour for making Bore-Holes of 150mm to 250 mm dia. by any standard method to any depth below ground level / bed level in all kinds of soil like clay, silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of collecting Disturbed & Un disturbed soil samples, conducting Standard Penetration Test at suitable intervals etc.) including preparation and submission of bore-log as per IRC : 75 and 78 and Clause 2400 of Specifications for Road & Bridge Works (5th Revision), Published by IRC, and also including hire charges of tools and plants complete as per the direction of Engineer-in-Charge. When drilling mud “Bentonite of suitable consistency” is used to prevent collapse of bore hole Depth 0m to 10m | - | Mtr | 4,755.4 | - |
| 3.01 | Depth greater than 10 Mtr. and up to 20 Mtr. | - | Mtr | 4,755.4 | - |
| 3.02 | Depth greater than 20 Mtr. and up to 30 Mtr. | - | Mtr | 4,755.4 | - |
| 4 | A. Laboratory Investigation Liquid Limit as per IS 2720 (Part – V). | - | Each | 4,755.4 | - |
| 4.01 | Plastic Limit as per IS 2720 (Part – V) | - | Each | 4,755.4 | - |
| 4.02 | Grain size analysis by Sieving as per IS 2720 (Part – IV). | - | Each | 4,755.4 | - |
| 4.03 | Grain size analysis by Hydrometer Method as per IS 2720 (Part – IV). | - | Each | 4,755.4 | - |
| 4.04 | Determination of Water Content as per IS 2720 (Part – II). | - | Each | 4,755.4 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
2911.pdf
Tender Documents • 1.58 MB
BOQ_5087668.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .