Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Qualified | Qualified |
Tender Value
Refer Docs
EMD Value
₹3.7 L
Closing Date
7 Sept 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manuji Chaubey
12, Rana Pratap Marg, Lucknow
Manpower assistance for Sub-station AM & TL-AM for 02 years at Ballia & Gorakhpur sites
5002001306/OTHERS/DOM/K00 - NR3 RHQ -1
Open
Manpower Supply
Supply
Ballia and Gorakhpur
₹5,000
₹3.7 L
8 Sept 2020
13 Aug 2020
8 Sept 2020
13 Aug 2020
4 Sept 2020
13 Aug 2020
Estimate for Switch yard and transmission line maintenance of 400/220KV Kanpur, Kanpur GIS, Orai, Auraiya & Fatehpur Gp for 02 year Period.
SN DESCRIPTION OIF ITEM UNIT Estimated QTY. for 02 year RATE (in Rs.) AMOUNT (in Rs.)
A Substation maintenance
W 400/220KV Kanpur 4
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 4 manpower operation 600 #REF! #REF! 2
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 02 manpower operation 600 #REF! #REF! 3
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 2 manpower operation 600 #REF! #REF! 14
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 02 manpower operation 600 #REF! #REF! 5
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 3 manpower operation 600 5178.02 3106810.08 38 600 22800 30% 6840 6900
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 02 manpower operation 600 2211.93 1327158.36 2300 4600
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 2 manpower operation 600 1899.64 1139785.68
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 02 manpower operation 600 1726.01 1035603.36
B Transmission Line Maintainance
1 400/220KV Kanpur :Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of transmission line. Capable of working on earthwires/Conductor etc. Highly-skilled - 14 manpower operation 600 #REF! #REF!
2 Orai :Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of transmission line. Capable of working on earthwires/Conductor etc. Highly-skilled - 5 manpower operation 600 6904.02 4142413.44
3 Auraiya:Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of transmission line. Capable of working on earthwires/Conductor etc. Highly-skilled - 8 manpower operation 600 #REF! #REF!
C Outstation Stay charges a)Total Skilled fitter for Agra & Aligrah group including TL and Sub-station = 38, b)Total deployed Skilled Manpower for 02 years = 600*38= 22800 c)Considering 30% of total deployed skilled manpower for out station stay charges = 22800*30%= 6840~ 6900 d) Ratio of Lodging not arranged by POWERGRID and lodging arranged by POWERGRID= 1:2 i.e 2300: 4600
1 If tent/ house will not be arranged by POWERGRID, Boarding and lodging charges for outstaion stay made by labors during Insulator cleaning, breakdown in Transmission line /SS (400 KV KNP & KNP GIS GP= 1200, Orai=500, Auraiya=500, FTP= 100) EA 2300 500.00 1150000.00
2 If house/tent will be arranged by POWERGRID, outstaion stay charges made by labors during Insulator cleaning, breakdown in Transmission line /SS ( 400 KV KNP & KNP GIS GP : 2200, Orai: 1100, Auraiya : 1100, FTP: 200) EA 4600 100.00 460000.00
D Height allowance for work above 30ft height with regard to Highly Skilled Contract worker working in Switchyard, S/s Maintainance AND TLM
1 20% extra for minimum wage for work above 30 feet height as per gazette notification: SO.188 (E) dated: 19.01.2017, even for one hour in a day on certification of Engg. In-charge. 400/220KV KNP: 9600 (1200 SS+ 8400TL), KNP GIS: 600 S/S, EA 10200 154.40 1574880.00
2 20% extra for minimum wage for work above 30 feet height as per gazette notification: SO.188 (E) dated: 19.01.2017, even for one hour in a day on certification of Engg. In-charge. Orai : 3900 (900 SS+ 3000 TL), Auraiya : 4800 (TL), Fatehpur : 6600 (600 SS + 6000TL) EA 15300 129.00 1973700.00
E Total Operational charge for two year = Rs. #REF!
F Add contractor profit @ 10% on operational charge for estimation purpose = Rs. #REF!
G Gross Amount including profit = Rs. #REF!
H Add GST as applicable at present @ 18% on gross amount = Rs. #REF!
Total Grass amount including GST (G+H)=Rs. #REF!
Detailed Standard Calculation of Operation Rates for Switch yard and Transmission Line maintenance
Minimum wages for Highly Skilled manpower @ 645/- per day as per min. wage circular of central government as on 01.04.2019
Minimum wages for Skilled manpower @ 551/- per day as per min. wage circular of central government as on 01.04.2019
Actual rate to be paid for one no. manpower for one day
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Qty. No. of days Amount
(i) Highly Skilled manpower (Basic + VDA) 645 1 1 645.00
a Total wages 645.00
b PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 83.85
d Bonus @ 8.33 % of Basic + VDA 53.73
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 32.25
Total = Rs. 835.79
(ii) Skilled manpower (Basic + VDA) 551 1 1 551.00
a PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 71.63
c Bonus @ 8.33 % of Basic + VDA 45.90
d Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 27.55
Total = Rs. 713.99
Detailed calculation of rates per operation per day
Sl. No. Description Rate per manpower (in Rs.) No. of manpower Unit Rate per operation (in Rs.)
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 12 manpower 835.79 12 Operation 10029.49
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 08 manpower 713.99 8 Operation 5711.89
Total Operation Mandays for Height allowance Rate
Estimated Total no of Operation to be considered for calculation of Height Allowance for fitters in Sub-station and switchyard Maintainance will be 50% of total operation in a BOQ * No. of highly skilled Fitters for Sub-station/ Switchward Maintainance.(600*12*50%) 600 3600
Outstation stay Charges 200/day
Estimate for Switch yard and transmission line maintenance of Orai Gp for 02 year Period.
IT NO. DESCRIPTION OIF ITEM UNIT Estimated QTY. for 02 year RATE (in Rs.) AMOUNT (in Rs.)
Substation maitenance
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 6 manpower operation 600 5178.02 3106810.08
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 03 manpower operation 600 2211.93 1327158.36
Transmission Line Maintainance
3 Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of transmission line. Capable of working on earthwires/Conductor etc. Highly-skilled - 8 manpower operation 600 6904.02 4142413.44
Outstation Stay charges
4 If tent/ house will not be arranged by POWERGRID, Boarding and lodging charges for outstaion stay made by labors during Insulator cleaning, breakdown in Transmission line /SS (If tent/ house will not be arranged by POWERGRID) EA 650 500.00 325000.00
5 If house/tent will be arranged by POWERGRID, outstaion stay charges made by labors during Insulator cleaning, breakdown in Transmission line /SS EA 1300 100.00 130000.00
Height allowance for work above 30ft height with regard to Highly Skilled Contract worker working in Switchyard, S/s Maintainance AND TLM
5 20% extra for minimum wage for work above 30 feet height as per gazette notification: SO.188 (E) dated: 19.01.2017, even for one hour in a day on certification of Engg. In-charge. EA 6600 133.20 879120.00
A Total Operational charge for two year = Rs. 9910501.88
Add contractor profit @ 10% on operational charge for estimation purpose = Rs. 991050.19
B Gross Amount including profit = Rs. 10901552.07
C Add GST as applicable at present @ 18% on gross amount = Rs. 1962279.37
Total Grass amount including GST (B+C)=Rs. 12863831.44
Detailed Standard Calculation of Operation Rates for Orai Sub-Station maintenance
Minimum wages for Highly Skilled manpower @ 645/- per day as per min. wage circular of central government as on 01.04.2019
Minimum wages for Skilled manpower @ 551/- per day as per min. wage circular of central government as on 01.04.2019
Actual rate to be paid for one no. manpower for one day
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Qty. No. of days Amount
(i) Highly Skilled manpower (Basic + VDA) 666 1 1 666.00
a Total wages 666.00
b PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 86.58
d Bonus @ 8.33 % of Basic + VDA 55.48
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 33.30
Total = Rs. 863.00
(ii) Skilled manpower (Basic + VDA) 569 1 1 569.00
a PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 73.97
c Bonus @ 8.33 % of Basic + VDA 47.40
d Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 28.45
Total = Rs. 737.31
Detailed calculation of rates per operation per day
Sl. No. Description Rate per manpower (in Rs.) No. of manpower Unit Rate per operation (in Rs.)
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 6 manpower 863.00 6 Operation 5178.02
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 03 manpower 737.31 3 Operation 2211.93
Total Operation Mandays for Height allowance Rate
Estimated Total no of Operation to be considered for calculation of Height Allowance for fitters in Sub-station and switchyard Maintainance will be 50% of total operation in a BOQ * No. of highly skilled Fitters for Sub-station/ Switchward Maintainance.(600*06*50%) 600 1800
For outstation assignments, house / tend will be arranged by POWERGRID for lodging of fitters near work place and an amount of Rs 100.00 per man day will be paid towards food expenses. In case of lodging arrangement is not provided by POWERGRID, then an additional amount of Rs 400/- per man day will be paid towards lodging charges
Detailed Standard Calculation of Operation Rates for Orai, Transmission Line maintenance
Minimum wages for Highly Skilled manpower @ 645/- per day as per min. wage circular of central government as on 01.04.2019 for Area "C"
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Qty. No. of days Amount
(i) Highly Skilled manpower for T/L. Miantainance (Basic + VDA) 666 1 1 666.00
a Total wages 666.00
b PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 86.58
d Bonus @ 8.33 % of Basic + VDA 55.48
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 33.30
Total = Rs. 863.00
Transmission line
3 Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of transmission line. Capable of working on earthwires/Conductor etc. Highly-skilled - 10manpower 863.00 8 Operation 6904.02
1 For outstation assignments, house / tend will be arranged by POWERGRID for lodging of fitters near work place and an amount of Rs 100.00 per man day will be paid towards food expenses. In case of lodging arrangement is not provided by POWERGRID, then an additional amount of Rs 400/- per man day will be paid towards lodging charges
2 HEIGHT ALLOWANCE FOR TLM (8*600) 4800
Detailed Standard Calculation of Operation Rates for Orai Sub-Station maintenance
Minimum wages for Highly Skilled manpower @ 666/- per day as per min. wage circular of central government as on 01.10.2019
Minimum wages for Skilled manpower @ 569/- per day as per min. wage circular of central government as on 01.10.2019
Actual rate to be paid for one no. manpower for one day
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Qty. No. of days Amount
(i) Highly Skilled manpower (Basic + VDA) 666 1 1 666.00
a Total wages 666.00
b PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 86.58
d Bonus @ 8.33 % of Basic + VDA 55.48
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 33.30
Total = Rs. 863.00
(ii) Skilled manpower (Basic + VDA) 569 1 1 569.00
a PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 73.97
c Bonus @ 8.33 % of Basic + VDA 47.40
d Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 28.45
Total = Rs. 737.31
Detailed calculation of rates per operation per day
Sl. No. Description Rate per manpower (in Rs.) No. of manpower Unit Rate per operation (in Rs.)
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 6 manpower 863.00 6 Operation 5178.02
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 02 manpower 737.31 3 Operation 2211.93
Total Operation Mandays for Height allowance Rate
Estimated Total no of Operation to be considered for calculation of Height Allowance for fitters in Sub-station and switchyard Maintainance will be 50% of total operation in a BOQ * No. of highly skilled Fitters for Sub-station/ Switchward Maintainance.(600*06*50%) 600 1800
For outstation assignments, house / tend will be arranged by POWERGRID for lodging of fitters near work place and an amount of Rs 100.00 per man day will be paid towards food expenses. In case of lodging arrangement is not provided by POWERGRID, then an additional amount of Rs 400/- per man day will be paid towards lodging charges
Detailed Standard Calculation of Operation Rates for Orai, Transmission Line maintenance
Minimum wages for Highly Skilled manpower @ 666/- per day as per min. wage circular of central government as on 01.10.2019 for Area "C"
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Qty. No. of days Amount
(i) Highly Skilled manpower for T/L. Miantainance (Basic + VDA) 666 1 1 666.00
a Total wages 666.00
b PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 86.58
d Bonus @ 8.33 % of Basic + VDA 55.48
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 33.30
Total = Rs. 863.00
Transmission line
3 Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of transmission line. Capable of working on earthwires/Conductor etc. Highly-skilled - 8 manpower 863.00 8 Operation 6904.02
1 For outstation assignments, house / tend will be arranged by POWERGRID for lodging of fitters near work place and an amount of Rs 100.00 per man day will be paid towards food expenses. In case of lodging arrangement is not provided by POWERGRID, then an additional amount of Rs 400/- per man day will be paid towards lodging charges
2 HEIGHT ALLOWANCE FOR TLM (8*600) 4800
Estimate for Switch yard and transmission line maintenance of Gorakhpur Gp for 02 year Period.
IT NO. DESCRIPTION OIF ITEM UNIT Estimated QTY. for 02 year RATE (in Rs.) AMOUNT (in Rs.)
Substation maitenance
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 2 manpower operation 600 1899.64 1139785.68
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 02 manpower operation 600 1726.01 1035603.36
Transmission Line Maintainance
3 Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of transmission line. Capable of working on earthwires/Conductor etc. Highly-skilled - 6 manpower operation 600 5698.93 3419357.04
Outstation Stay charges
4 If tent/ house will not be arranged by POWERGRID, Boarding and lodging charges for outstaion stay made by labors during Insulator cleaning, breakdown in Transmission line /SS (If tent/ house will not be arranged by POWERGRID) EA 650 500.00 325000.00
5 If house/tent will be arranged by POWERGRID, outstaion stay charges made by labors during Insulator cleaning, breakdown in Transmission line /SS EA 1300 100.00 130000.00
Height allowance for work above 30ft height with regard to Highly Skilled Contract worker working in Switchyard, S/s Maintainance AND TLM
5 20% extra for minimum wage for work above 30 feet height as per gazette notification: SO.188 (E) dated: 19.01.2017, even for one hour in a day on certification of Engg. In-charge. EA 4200 146.60 615720.00
A Total Operational charge for two year = Rs. 6665466.08
Add contractor profit @ 10% on operational charge for estimation purpose = Rs. 666546.61
B Gross Amount including profit = Rs. 7332012.69
C Add GST as applicable at present @ 18% on gross amount = Rs. 1319762.28
Total Grass amount including GST (B+C)=Rs. 8651774.97
Detailed Standard Calculation of Operation Rates for Fatehpur Sub-station maintenance
Minimum wages for Highly Skilled manpower @ 733/- per day as per min. wage circular of central government as on 01.10.2019
Minimum wages for Skilled manpower @ 666/- per day as per min. wage circular of central government as on 01.10.2019
Actual rate to be paid for one no. manpower for one day
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Qty. No. of days Amount
(i) Highly Skilled manpower (Basic + VDA) 733 1 1 733.00
a Total wages 733.00
b PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 95.29
d Bonus @ 8.33 % of Basic + VDA 61.06
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 36.65
Total = Rs. 949.82
(ii) Skilled manpower (Basic + VDA) 666 1 1 666.00
a PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 86.58
c Bonus @ 8.33 % of Basic + VDA 55.48
d Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 33.30
Total = Rs. 863.00
Detailed calculation of rates per operation per day
Sl. No. Description Rate per manpower (in Rs.) No. of manpower Unit Rate per operation (in Rs.)
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 2 manpower 949.82 2 Operation 1899.64
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 02 manpower 863.00 2 Operation 1726.01
Total Operation Mandays for Height allowance
1 Estimated Total no of Operation to be considered for calculation of Height Allowance for fitters in Sub-station and switchyard Maintainance will be 50% of total operation in a BOQ * No. of highly skilled Fitters for Sub-station/ Switchward Maintainance.(600*02*50%) 600 600
2 For outstation assignments, house / tend will be arranged by POWERGRID for lodging of fitters near work place and an amount of Rs 100.00 per man day will be paid towards food expenses. In case of lodging arrangement is not provided by POWERGRID, then an additional amount of Rs 400/- per man day will be paid towards lodging charges
Detailed Standard Calculation of Operation Rates for Gorakhpur Sub-station maintenance
Minimum wages for Highly Skilled manpower @ 733/- per day as per min. wage circular of central government as on 01.10.2019
Minimum wages for Skilled manpower @ 666/- per day as per min. wage circular of central government as on 01.10.2019
Actual rate to be paid for one no. manpower for one day
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Qty. No. of days Amount
(i) Highly Skilled manpower (Basic + VDA) 733 1 1 733.00
a Total wages 733.00
b PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 95.29
d Bonus @ 8.33 % of Basic + VDA 61.06
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 36.65
Total = Rs. 949.82
(ii) Skilled manpower (Basic + VDA) 666 1 1 666.00
a PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 86.58
c Bonus @ 8.33 % of Basic + VDA 55.48
d Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 33.30
Total = Rs. 863.00
Detailed calculation of rates per operation per day
Sl. No. Description Rate per manpower (in Rs.) No. of manpower Unit Rate per operation (in Rs.)
1 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Highly Skilled - 2 manpower 949.82 2 Operation 1899.64
2 Providing assistance during planned unplanned & emergency S/D,Maintenance of substations equipments. Skilled - 02 manpower 863.00 2 Operation 1726.01
Total Operation Mandays for Height allowance
1 Estimated Total no of Operation to be considered for calculation of Height Allowance for fitters in Sub-station and switchyard Maintainance will be 50% of total operation in a BOQ * No. of highly skilled Fitters for Sub-station/ Switchward Maintainance.(600*02*50%) 600 600
2 For outstation assignments, house / tend will be arranged by POWERGRID for lodging of fitters near work place and an amount of Rs 100.00 per man day will be paid towards food expenses. In case of lodging arrangement is not provided by POWERGRID, then an additional amount of Rs 400/- per man day will be paid towards lodging charges
Detailed Standard Calculation of Operation Rates for Gorakhpur Transmission Line maintenance
Minimum wages for Highly Skilled manpower @ 733/- per day as per min. wage circular of central government as on 01.10.2019 for Area "B"
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Qty. No. of days Amount
(i) Highly Skilled manpower for T/L. Miantainance (Basic + VDA) 733 1 1 733.00
a Total wages 733.00
b PF+EDLI+Admin Charges (12+0.5+0.5) @ 13.00% 95.29
d Bonus @ 8.33 % of Basic + VDA 61.06
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 36.65
Total = Rs. 949.82
Transmission line
3 Deployment of highly skilled fitter/technicians for the routine/breakdown maintenance of transmission line. Capable of working on earthwires/Conductor etc. Highly-skilled - 6 manpower 949.82 6 Operation 5698.93
1 For outstation assignments, house / tend will be arranged by POWERGRID for lodging of fitters near work place and an amount of Rs 100.00 per man day will be paid towards food expenses. In case of lodging arrangement is not provided by POWERGRID, then an additional amount of Rs 400/- per man day will be paid towards lodging charges
2 HEIGHT ALLOWANCE FOR TLM (6*600) 3600
Detailed Standard Calculation of Operation Rates for Gorakhpur & Ballia Group for Sub-Station & TL maintenance
Sl. No. Rate Per Day For Switchward and Sub-station Main. Minimum Wages Rates for class B (Gorakhpur) Minimum Wages Rates for class C (Balia, Azamgarh) Sub-station Transmission Line
Qty For GKP Qty for Balia Per Operation Cost for GKP Per Operation Cost for Balia Qty for GKP Qty for Ballia Per Opn Cost for GKP Per Opn Cost for Ballia
Highly Skilled(HS) Skilled(S) HS S HS S HS S HS S HS S HS HS HS HS
Add Height Allowance @ 20% For Sub-stations only 50% Heighly skilled manpower is to be provided Height Allowance 20% 146.60 0.00 399.60 0.00 Height All to Full Manpower in TL 879.6 1065.6
e Overhead Charges @ 5% (including uniform charges and washing allowances etc. and for miscellaneous expances including T&P maintenance, workmen compensation insurance, health checkup etc.) 80.63 66.60 219.78 85.35 263.9 319.7
Estimate for Sub-station & TL Maintenance for Ballia & Gorakhpur Group for 02 year Period. Sub station S/s Maintenance TLM Total Highly skilled
IT NO. DESCRIPTION OF ITEM UNIT Estimated QTY. for 02 year RATE (in Rs.) AMOUNT (in Rs.) Highly Skilled Skilled Highly Skilled
A Sub-station Gorakhpur 2 2 6 10 8
W Gorakhpur Sub-station Maintenance Ballia 6 3 8 17 14
1 Highly Skilled - 02 Opn 600 2,089.61 1,253,764.25 Total 8 5 14 27 22
X Ballia Sub-station Maintenance (HVDC & HVAC) 2600
1 Highly Skilled -06 operation 600.00 5,695.82 3,417,491.09
2 Skilled - 03 operation 600.00 2,211.93 1,327,158.36
B Transmission Line Maintainance
1 GKP: Highly-skilled - 6 Operation 600 6,838.71 4,103,228.45
2 Ballia :Highly-skilled - 8 Operation 600 8,284.83 4,970,896.13
C Outstation Stay charges a)Total Highly Skilled fitter for GKP, Ballia & Azamgarh group including TL and Sub-station = 22, b)Total deployed Skilled Manpower for 02 years =600*22= 13200 c)Considering 30% of total deployed skilled manpower for out station stay charges = 13200*30%= 3960~3900 d) Ratio of Lodging not arranged by POWERGRID and lodging arranged by POWERGRID= 1:2 i.e 1300: 2600
1 If tent/ house will not be arranged by POWERGRID, Boarding and lodging charges for outstaion stay made by labors during Insulator cleaning, breakdown in Transmission line /SS (GKP=650, Ballia=650) EA 1300 500.00 650,000.00
2 If house/tent will be arranged by POWERGRID, outstaion stay charges made by labors during Insulator cleaning, breakdown in Transmission line /SS ( GKP=1300, Ballia=1300) EA 2600 100.00 260,000.00
D Height allowance for work above 30ft height with regard to Highly Skilled Contract worker working in Switchyard, S/s Maintainance AND TLM
1 20% extra for minimum wage for work above 30 feet height as per gazette notification: SO.188 (E) dated: 19.01.2017, even for one hour in a day on certification of Engg. In-charge. Gorakhpur (600SS+3600 TL) *Height Allowance Charges already taken in row No. 7 EA 4200 0.00 0.00
2 20% extra for minimum wage for work above 30 feet height as per gazette notification: SO.188 (E) dated: 19.01.2017, even for one hour in a day on certification of Engg. In-charge. Ballia (1800 SS + 4800 TL), *Height Allowance Charges already taken in row No. 7 EA 6600 0.00 0.00
E Total Operational charge for two year = Rs. 17,018,141.63
F Add contractor profit @ 10% on operation charge = Rs. 1,701,814.16
G Gross Amount including profit = Rs. 18,719,955.80
H Add GST as applicable at present @ 18% on gross amount = Rs. 3,369,592.04
Total Grass amount including GST (G+H)=Rs. 22,089,547.84
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
~$ IFB Section-I, Vol.I.doc
doc • 0.00 MB
01 IFB Section-I, Vol.I.doc
doc • 0.07 MB
02 Instructions to Bidders, Section-II, Volume-I.doc
doc • 0.20 MB
03 BDS Section-III, Vol.I.doc
doc • 0.09 MB
04-Annexure-A BDS (QR).docx
docx • 0.03 MB
05-General Conditions of Contract, Section-IV, Volume-I.doc
doc • 0.15 MB
06 SCC, Section-V, Volume-I.doc
doc • 0.12 MB
07 Forms and Procedures, Section-VI, Vol.I IP.doc
doc • 0.15 MB
SCC.pdf
pdf • 0.41 MB
TS.pdf
pdf • 0.42 MB
BoQ.xlsx
xlsx • 0.06 MB
Check List before Uploading bids.docx
docx • 0.02 MB
Mandatory-Attachment 13.doc
doc • 0.03 MB
Mandatory-Attachment 14.docx
docx • 0.03 MB
Mandatory-Attachment 8- Integrity Pact.pdf
pdf • 0.20 MB
Mandatory-Bid Form & Attachments_First Envelope Bid.xls
xls • 2.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .