| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | ₹3.7 L | L1 | Accepted-AOC Lowest Offer |
| 2 | L2₹4.5 LRejected-Finance | ₹4.5 L | L2 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | PRAKASH CONSTRUCTION L1 | RAJ BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00BOQ | |||||
| 1.01 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 25 | CUM | 250 ₹6,250 Lowest | 265 ₹6,625 |
| 1.02 | TRANSPORT EXCAVATED EARTH / OTHER DEBRIS FROM INSIDE THE PLANT PREMISES AND FILL IN LOW LYING AREAS, INCLUDING SPREADING, LOADING, UNLOADING (25% VOIDS TO BE DEDUCTED IN LORRY/TRACTOR MEASUREMENTS) | 20 | CUM | 250 ₹5,000 Lowest | 270 ₹5,400 |
| 1.03 | CEMENT CONCRETE 1:4:8 USING 25MM DOWN GAUGE BLUE GRANITE AGGREGATE IN FOUNDATIONS, MUD MAT, FLOORING EXCLUDING SHUTTERING BUT INCLUDING RAMMING, LEVELLING, CURING ETC., COMPLETE. | 5 | CUM | 4,400 ₹22,000 Lowest | 4,700 ₹23,500 |
| 1.04 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +0.00 MTR TO +7.00 MTR | 7 | CUM | 6,800 ₹47,600 Lowest | 7,100 ₹49,700 |
| 1.05 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD / STEEL SHUTTERING INCLUDING STAGGING FOR ALL TYPE OF WORKS AND REMOVING AFTER CONCRETING AND "PLASTER FREE FINISH" AT ALL LEVELS. | 30 | SQM | 900 ₹27,000 Lowest | 960 ₹28,800 |
| 1.06 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. | 0.5 | MT | 17,500 ₹8,750 Lowest | 18,500 ₹9,250 |
| 1.07 | CEMENT CONCRETE M25 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS COLUMN, BEAM, SUNSHADE, SHELL WALL, ROOF SLAB, STAIRCASE, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE ABOVE FFL TO +7 MTR LEVEL. | 18 | CUM | 6,000 ₹1,08,000 Lowest | 6,500 ₹1,17,000 |
| 1.08 | PREPARE SURFACES OF WALLS AND PLASTER INTERIOR, EXTERIOR AND TOP FACES WITH CEMENT MORTAR, 12MM THICK IN CM 1:4 INCLUDING NECESSARY SCAFFOLDING AND CURING ETC., COMPLETE FROM FFL TO +7.00 MTR LEVEL. | 75 | SQM | 600 ₹45,000 Lowest | 700 ₹52,500 |
| 1.09 | PREPARE SURFACES AND APPLY TWO COATS OF WHITE WASH USING APPROVED MAKE INCLUDING MIXING WITH SUFFICIENT QUALITY OF GUM LIKE FEVICOL ETC., COMPLETE AT ALL LEVELS. | 75 | SQM | 50 ₹3,750 Lowest | 60 ₹4,500 |
Tender Value
Refer Docs
Closing Date
23 Jul 2026, 3:00 pmClosed
CGM (Production and Project Co-Ordination)
PMD Office, TNPL Unit I, Kagithapuram.
Civil and structural works for erection of Hydrogen Peroxide tank in CBP#2 at TNPL Unit I
2026_TNPL_686547_1
TNPL/PMD/CIV/UNIT I/262713002641
Open Tender
Civil Works
Tender cum Auction
60 days
TNPL Unit I, Kagithapuram, Karur District
As per Invitation for Bids of Bid Document
4 documents required · 4 mandatory
₹0
Exempted
7 Aug 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ | |||||
| 1.01 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 25 | CUM | - | - |
| 1.02 | TRANSPORT EXCAVATED EARTH / OTHER DEBRIS FROM INSIDE THE PLANT PREMISES AND FILL IN LOW LYING AREAS, INCLUDING SPREADING, LOADING, UNLOADING (25% VOIDS TO BE DEDUCTED IN LORRY/TRACTOR MEASUREMENTS) | 20 | CUM | - | - |
| 1.03 | CEMENT CONCRETE 1:4:8 USING 25MM DOWN GAUGE BLUE GRANITE AGGREGATE IN FOUNDATIONS, MUD MAT, FLOORING EXCLUDING SHUTTERING BUT INCLUDING RAMMING, LEVELLING, CURING ETC., COMPLETE. | 5 | CUM | - | - |
| 1.04 | SUPPLY AND LAYING OF FLY ASH BRICKS IN SUPER STRUCTURE IN CM 1:6 INCLUDING SCAFFOLDING, CURING ETC., COMPLETE ABOVE +0.00 MTR TO +7.00 MTR | 7 | CUM | - | - |
| 1.05 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD / STEEL SHUTTERING INCLUDING STAGGING FOR ALL TYPE OF WORKS AND REMOVING AFTER CONCRETING AND "PLASTER FREE FINISH" AT ALL LEVELS. | 30 | SQM | - | - |
| 1.06 | TAKE DELIVERY OF HIGH STRENGTH RIBBED DEFORMED BARS/ MS BARS ISSUED BY TNPL FREE OF COST, CUT, BEND AND TIE UP IN POSITION INCLUDING COST OF SUPPLYING NECESSARY 18 GAUGE BINDING WIRE FOR ALL TYPES OF RCC WORKS AT ALL LEVELS. | 0.5 | MT | - | - |
| 1.07 | CEMENT CONCRETE M25 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS COLUMN, BEAM, SUNSHADE, SHELL WALL, ROOF SLAB, STAIRCASE, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE ABOVE FFL TO +7 MTR LEVEL. | 18 | CUM | - | - |
| 1.08 | PREPARE SURFACES OF WALLS AND PLASTER INTERIOR, EXTERIOR AND TOP FACES WITH CEMENT MORTAR, 12MM THICK IN CM 1:4 INCLUDING NECESSARY SCAFFOLDING AND CURING ETC., COMPLETE FROM FFL TO +7.00 MTR LEVEL. | 75 | SQM | - | - |
| 1.09 | PREPARE SURFACES AND APPLY TWO COATS OF WHITE WASH USING APPROVED MAKE INCLUDING MIXING WITH SUFFICIENT QUALITY OF GUM LIKE FEVICOL ETC., COMPLETE AT ALL LEVELS. | 75 | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_825276.xls
BOQ • 0.31 MB
BidDocument_262713002641.pdf
Tender Documents • 2.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].