Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAdmitted-Finance | ₹18.4 L | L1 | Admitted-Finance |
| 2 | L2₹19.6 L+₹1.3 L (6.85%)Admitted-Finance | ₹19.6 L+₹1.3 L (6.85%) | L2 | Admitted-Finance |
| 3 | L3₹21.0 L+₹2.6 L (14.2%)Admitted-Finance | ₹21.0 L+₹2.6 L (14.2%) | L3 | Admitted-Finance |
| 4 | L4₹21.0 L+₹2.6 L (14.4%)Admitted-Finance SHIV NIWAS DHANDA P O TOTU DISTT SHIMLA HP 171011 | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171011 | ₹21.0 L+₹2.6 L (14.4%) | L4 | Admitted-Finance |
| 5 | L5₹22.0 L+₹3.6 L (19.8%)Admitted-Finance RAJKOT ROAD AIR FORCE STATION HALWARA 141106 PUNJAB | HALWARA | LUDHIANA | PUNJAB | 141106 | ₹22.0 L+₹3.6 L (19.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SANGA SINGH AND CO L5 | HARISH BUILDERS L6 | CHOUDHARY ENTERPRISES L2 | Kular and Company L7 | BEHL AND COMPANY L3 | kartikconstructions L1 | M/s Dinesh Kumar L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Brickwork or PCC block built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | 12 | Cum | 199 ₹2,388 | 410 ₹4,920 | 122 ₹1,464 | 100 ₹1,200 Lowest | 200 ₹2,400 | 100 ₹1,200 Lowest | 225 ₹2,700 |
| 2.00 | M&L for Brick work with sub class ‘B’ brick, straight or curved as plan exc 6m mean radius built in cement mortar 1:6, complete all as specified and directed. | 12 | Cum | 4,999 ₹59,988 | 5,900 ₹70,800 | 5,233 ₹62,796 | 3,000 ₹36,000 Lowest | 4,000 ₹48,000 | 4,000 ₹48,000 | 5,000 ₹60,000 |
| 3.00 | Taking down cement plaster on brick or stone walls etc, including racking out joints, hacking for key, scrubbing down with water etc, complete all as specified and directed. | 2,700 | Sqm | 10 ₹27,000 Lowest | 30 ₹81,000 | 13 ₹35,100 | 23 ₹62,100 | 20 ₹54,000 | 10 ₹27,000 Lowest | 20 ₹54,000 |
| 4.00 | M&L for 15mm thick rendering in cement mortar 1:4 on fair faces of brick work or concrete incl even and smooth surfaces without using extra cement, complete all as specified and directed. | 2,850 | Sqm | 180 ₹5,13,000 | 186.7 ₹5,32,095 | 216 ₹6,15,600 | 189 ₹5,38,650 | 180 ₹5,13,000 | 160 ₹4,56,000 Lowest | 160 ₹4,56,000 Lowest |
| 5.00 | M&L for prepration of newly plastered surfaces of wall and applying two coat of cement base paint over a coat of alkali resistant priming paint, including dark bluecolour of pillar /RCC/brick facia, complete all as specified and directed. | 2,850 | Sqm | 25 ₹71,250 | 48 ₹1,36,800 | 19 ₹54,150 Lowest | 65 ₹1,85,250 | 25 ₹71,250 | 45 ₹1,28,250 | 22 ₹62,700 |
| 6.00 | M&L for preparation of old plastered surfaces and applying one coats of cement base paint or colored on walls, complete all as specified and directed. | 50 | Sqm | 12 ₹600 Lowest | 60 ₹3,000 | 19 ₹950 | 30 ₹1,500 | 20 ₹1,000 | 15 ₹750 | 20 ₹1,000 |
| 7.00 | Cleaning and maintaining the sewage system for the entire officer Area of Air Force Station Halwara and allied establishments which consists of IWCs, EWCs, WHB, sinks, bottle traps, Nahani traps, floor traps, soil/waste/vent pipes of various dia connected to sanitary fittings/traps and/or running on external walls of buildings of any height, in sunken floors, burried in trenches of any depth including junctions, Manholes of any description (any size/depth) and under ground sewage/sullage lines of any sizes/dia upto the final drop outlet into septic tank/soak well/Manhole of central sewage system, in running/flowing condition without disturbance or damages to existing system including removing all types of blockages in above mentioned sanitary fittings/traps/sewage lines/man holes in any position as and when occures and ensuring free flow of the sewage/sullage from the point of origin to the final disposal end and disposal of the sludge/waste materials removed from above mentioned sanitary fittings/traps/sewage lines outside defence land without causing any nuisence to Air Force community/civil public and in confirmity with the regulations of local authorities, with out any extra cost to Govt, complete all as specified and directed. | 275 | Per Day | 1,219 ₹3,35,225 | 1,200 ₹3,30,000 | 1,455 ₹4,00,125 | 1,175 ₹3,23,125 | 2,200 ₹6,05,000 | 380 ₹1,04,500 Lowest | 850 ₹2,33,750 |
| 7.01Note :- (a) Areas covered under the contract are officer area of Air Force. (b) Sufficient man power shall be detailed on all days excluding Sundays and holidays of 11 months ( i.e. 275 days ) for the above mentioned job during the entire contract period. In case, additional man power is necessated for completion of any job, the contractor shall provide required man power without any extra cost. The supervisor shall report to JE in charge of the work daily by 09 hrs and 14 00 hrs to receive the complaints and other details of works to be done. The workers and supervisor shall leave the primeses only on completion of the jobs assigned for the day / 17 30 hrs which ever is later and the supervisor shall return the job card daily to the JE and will give a brief of the works done before leaving. (c) The rate quoted shall deemed to be included for all necessary tools and plants required for satisfactory completion of the work. (d) The rate quoted shall also include for removal and refixing of CI/RCC covers of manholes/septic tanks/soakwells, grills/gratings, opening and refixing of doors of pipe lines etc as required. (e) The work shall be carried out through sewage suction machine, as directed no manual scavenging permitted. (f) Attendance register will be maintained by the concerned JE. | ||||||||||
| 7.02(g) Penalty for non completion of work in given time :- The works assigned for the day shall be completed by the same day, preferably within 9.30hrs to 17.30hrs after receipt of the work orders /instructions by the supervisor. In case, due to any unforeseen technical reasons, if the work is unable to complete by the same day, the matter shall be informed to the AGE by the contractor in writing and permission of AGE to carry over the work to next day shall be taken in writing. In such situations, the work shall be resumed by the very next day and the work shall be completed in the shortest possible time. In the event of failure to complete the work ordered on the contractor by the same day due to non detailment of sufficient workmen or any other reason attributable to the contractor, a penalty sum of Rs.1000.00 per each complaint per day of delay shall levied to contractor. The decision of Accepting Officer regarding penalty shall be final and binding. (h) Work will done only when one supervisor is present on site who will be responsible for ensuring safety of the labours engaged. | ||||||||||
| 8.00 | Dewatering / desludging of septic tanks, soakage wells, manhole etc by mechnical means using Sewage waste collection Truck / Vehicle including cleaning of all sludge, silt residue of both organic and inorganic nature by mechanical scrappers etc and disposal off the same out side the defence area without causing any nuisence to Air Force community / civil public and in confirmity with the regulations of local authorities, without any extra cost to Govt, complete all as specified and directed.
Note :-
1. For measurement of cubic content of sludge please refer PS Clause No 22.
2. Work shall be carried out in foul conditions. After dewatering, sewage systems shall be allowed to dry .
3. Sewage/ sullage shall be removed in closed container mounted on vehicle.
4. Work shall be carried out as and when required.
5. Work will done only when one supervisor is present at site who will be responsible for ensuring safety of the labours engaged.
6 Contractor has to provide all necessary safety gears & protective equipment to the labours engaged. | 10 | Cum | 1,499 ₹14,990 | 1,500 ₹15,000 | 444 ₹4,440 Lowest | 900 ₹9,000 | 2,000 ₹20,000 | 1,800 ₹18,000 | 1,500 ₹15,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
29 Aug 2026, 6:00 pmClosed
GE (AF) Halwara
GE (AF) Halwara-141106
REPAIR, REPLACEMENT, CLEANING OF SEWAGE LINES, MANHOLE, GULLY TRAPS AND MISC WORK AND REPAIR TO BOUNDARY WALL, GATE, FENCING OFFRS ENCLAVE AT AF STN HALWARA
2026_MES_782303_1
GE/HAL-33/2026-27
Open Tender
Civil Works
Item Rate
273 days
Halwara
As per Cover 1
8 documents required · 8 mandatory
₹500
Yes
GE (AF) Halwara
₹60,000
Yes
31 Aug 2026
1 Aug 2026
31 Aug 2026
1 Aug 2026
29 Aug 2026
15 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Brickwork or PCC block built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | 12 | Cum | - | - |
| 2 | M&L for Brick work with sub class ‘B’ brick, straight or curved as plan exc 6m mean radius built in cement mortar 1:6, complete all as specified and directed. | 12 | Cum | - | - |
| 3 | Taking down cement plaster on brick or stone walls etc, including racking out joints, hacking for key, scrubbing down with water etc, complete all as specified and directed. | 2,700 | Sqm | - | - |
| 4 | M&L for 15mm thick rendering in cement mortar 1:4 on fair faces of brick work or concrete incl even and smooth surfaces without using extra cement, complete all as specified and directed. | 2,850 | Sqm | - | - |
| 5M&L for prepration of newly plastered surfaces of wall and applying two coat of cement base paint over a coat of alkali resistant priming paint, including dark bluecolour of pillar /RCC/brick facia, complete all as specified and directed. | |||||
| 6 | M&L for preparation of old plastered surfaces and applying one coats of cement base paint or colored on walls, complete all as specified and directed. | 50 | Sqm | - | - |
| 7 | Cleaning and maintaining the sewage system for the entire officer Area of Air Force Station Halwara and allied establishments which consists of IWCs, EWCs, WHB, sinks, bottle traps, Nahani traps, floor traps, soil/waste/vent pipes of various dia connected to sanitary fittings/traps and/or running on external walls of buildings of any height, in sunken floors, burried in trenches of any depth including junctions, Manholes of any description (any size/depth) and under ground sewage/sullage lines of any sizes/dia upto the final drop outlet into septic tank/soak well/Manhole of central sewage system, in running/flowing condition without disturbance or damages to existing system including removing all types of blockages in above mentioned sanitary fittings/traps/sewage lines/man holes in any position as and when occures and ensuring free flow of the sewage/sullage from the point of origin to the final disposal end and disposal of the sludge/waste materials removed from above mentioned sanitary fittings/traps/sewage lines outside defence land without causing any nuisence to Air Force community/civil public and in confirmity with the regulations of local authorities, with out any extra cost to Govt, complete all as specified and directed. | 275 | Per Day | - | - |
| 7.02 | (g) Penalty for non completion of work in given time :-
The works assigned for the day shall be completed by the same day, preferably within 9.30hrs to 17.30hrs after receipt of the work orders /instructions by the supervisor. In case, due to any unforeseen technical reasons, if the work is unable to complete by the same day, the matter shall be informed to the AGE by the contractor in writing and permission of AGE to carry over the work to next day shall be taken in writing. In such situations, the work shall be resumed by the very next day and the work shall be completed in the shortest possible time. In the event of failure to complete the work ordered on the contractor by the same day due to non detailment of sufficient workmen or any other reason attributable to the contractor, a penalty sum of Rs.1000.00 per each complaint per day of delay shall levied to contractor. The decision of Accepting Officer regarding penalty shall be final and binding.
(h) Work will done only when one supervisor is present on site who will be responsible for ensuring safety of the labours engaged. | - | - | - | - |
| 8 | Dewatering / desludging of septic tanks, soakage wells, manhole etc by mechnical means using Sewage waste collection Truck / Vehicle including cleaning of all sludge, silt residue of both organic and inorganic nature by mechanical scrappers etc and disposal off the same out side the defence area without causing any nuisence to Air Force community / civil public and in confirmity with the regulations of local authorities, without any extra cost to Govt, complete all as specified and directed.
Note :-
1. For measurement of cubic content of sludge please refer PS Clause No 22.
2. Work shall be carried out in foul conditions. After dewatering, sewage systems shall be allowed to dry .
3. Sewage/ sullage shall be removed in closed container mounted on vehicle.
4. Work shall be carried out as and when required.
5. Work will done only when one supervisor is present at site who will be responsible for ensuring safety of the labours engaged.
6 Contractor has to provide all necessary safety gears & protective equipment to the labours engaged. | 10 | Cum | - | - |
| 9 | S & F in replacement factory made precast reinforced cement concrete cover in RCC 1:2:4 type B1 (20mm graded stone aggregate) including 8mm TMT bars at a spacing of 150mm centre to centre of overall size 900mmx450mmx75mm for Manhole, including hook arrangement for lifting and placing in position and sides covered by MS angle size 75x75x6mm including 2 coats of synthetic enamel paint over a coat of red oxide primer to exposed steel surfaces, complete all as specified and directed.
Note :-Quoted rate shall deemed to be included for removing the old cover slab/ debris outside the MOD Land. | 45 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TD.pdf
Tender Documents • 0.83 MB
BOQ_876423.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .