Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.7 L+₹24,749.40 (7.12%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.7 L+₹27,515.80 (7.92%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.9 L+₹42,335.80 (12.2%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.9 L+₹45,793.80 (13.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹9,880
Closing Date
27 Jul 2026, 6:00 pmClosed
Executive Engineer REW Baramulla
Executive Engineer REW Baramulla
Fencing around NTPHC building along with development of Lawn at Lalpora B under ADP(BDC) FY 2026-27 Block Lalpora
2026_RDPR_315540_6
95/Xen/Rew/Bla/2026-27 Dated 11/07/2026
Open Tender
Civil Works
Percentage
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹9,880
28 Jul 2026
11 Jul 2026
28 Jul 2026
11 Jul 2026
27 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) | 13.17 | cum | - | - |
| 2 | Supplying and laying of stone soling hand packed tightly including ramming, watering. Incl all carraiges of material | 2.98 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:3:6 (1Cement: 3 fine sand: 6 graded stone aggregate 20mm nominal Size) | 22.82 | cum | - | - |
| 4 | Centering and shuttering including strutting propping etc. and removal of form work; | 86.43 | sqm | - | - |
| 5 | Brick work with common burnt clay (nonmodular) bricks of class designation 7.5 in superstructural above plinth level upto V floor including curing n : Cement mortar 1:6 ( 1 cement : 6 coarse sand) incl all carraiges of material | 19.66 | cum | - | - |
| 6 | 12 mm thick plaster in Cement Mortar 1:6 mix. | 172.86 | sqm | - | - |
| 7 | Finishing walls with textured exterior paint of required shade on New work (two or more coats applied @ 3.28 liter/10sqm) over and including base coat of exterior primer applied @ 2.20kg/10sqm | 172.86 | sqm | - | - |
| 8 | Structural steel work in built up sections, framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded for Gate | 174 | kg | - | - |
| 9 | Coping 50 mm thick in pcc 1:2:4 mix | 10.8 | sqm | - | - |
| 10 | Carraige of sand and bajri for 25 km lead | 30.81 | cum | - | - |
stage.html
html • 0.04 MB
finance_1024226.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1024226.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .