Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | ₹18.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.7 LRejected-Finance | ₹19.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SIJITH P K L1 | GIREESH KUMAR KOMATH L2 |
|---|---|---|---|---|---|
| 1.00Detailed estimate | |||||
| 1.00 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 96.36 | cum | - | - |
| 1.00 | od278046/2018_2019 : Supplying and filling at site with good quality earth suitable for filling brought from outside, levelling the top at site and banking in layers not exceeding 20 cm in depth, breaking clods, watering,rolling each layer with ? tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layerwith power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginalbanks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m. (WITHCOMPACTION) | 56.2 | cum | - | - |
| 1.00 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 48.99 | cum | - | - |
| 1.00 | 51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 11.44 | cum | - | - |
| 1.00 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 13.45 | cum | - | - |
| 1.01 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 20.68 | cum | - | - |
| 1.01 | 5.4 : Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size) | 23.6 | cum | - | - |
| 1.01 | 5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 89.11 | sqm | - | - |
| 1.01 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 122.6 | sqm | - | - |
Tender Value
₹19.9 L
EMD Value
₹50,000
Closing Date
4 Jan 2019, 6:00 pmClosed
block development officer
balussery block panchayath office
building
2018_CRD_257499_1
01/BDO/BLY/18-19
Open Tender
Civil Works - Buildings
360 days
balussery
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,600
Yes
online
₹50,000
Yes
5 Feb 2026
26 Dec 2018
8 Jan 2019
26 Dec 2018
4 Jan 2019
26 Dec 2018
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_349940.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid