Executive Engineer, Surat Canal Division, Surat
Providing and Laying a NP 2 Pipeline from Bhestan minor Ex Chalthan Branch from Deladva Talav (Second Attempt)
280550
NIT-23 of 2025-26
Open
Civil - All
Works
Surat
15 documents required · 12 mandatory · 3 optional
₹900
Yes
Executive Engineer, Surat Canal Division, Surat
₹9,000
Yes
26 Feb 2026
26 Feb 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given
to provide a common basis for bidding. The basis of payment will be the actual quantities
of work ordered and carried out, as measured by the Contractor and verified by the
Engineer and valued at the rates and prices tendered in the priced Bill of Quantities, where
applicable, and otherwise at such rates and prices as the Engineer may fix within the terms
of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far as it
is otherwise provided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether quantities
are stated or not. The cost of Items against which Contractor has failed to enter a rate or
price shall be deemed to be covered by other rates and prices entered in the Bill of
Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in the
items provided in the priced Bill of Quantities, and where no Items are provided the cost
shall be deemed to be distributed among the rates and prices entered for the related items
7. General direction and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. References to the relevant sections of the contract
documentation shall be made before entering rates or prices against each item in the Bill
8. The method of completed work of payment shall be in accordance with the specification for
Road and Bridge works. For building works specifications for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required blasting,
or the use of metal wedges and sledgehammers, or the use of compressed air drilling
for its removal, and which cannot be extracted by ripping with a tractor of at least 150 kw
with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
Name of Work Providing and Laying a NP 2 Pipeline from Bhestan minor Ex
Chalthan Branch from Deladva Talav (A) Percentage Rate
Tender (Up to INR 50 Cr. )
Item Description of Item (with Quantity Unit Rate Amount
No brief specification and in
reference to book of
specifications) Figur
1 Excavation for foundation in all 139.73 Cmt 314.60
sorts of soil including sandy and
gravelly soil, soft murrum including
depositing the excavated stuff as
and where directed including back
filling the trenches with suitable
excavated stuff etc. complete for
lead upto 50 & lift as under (
mannually without dewatering )(a)
lift upto1.50 mts.
2 providing and laying 46.58 Cmt 4001.1
plain/Reinforced nominal mix
cement concrte of various grade
with cement ,sand and course
aggegate including centering,
shuttering ,batching ,mixing
tranporting , placing , vibrating
smooth finishing ,curing etc.
complete for all lead and lift.(
manually with conventional mixer,
including dewatering (ii) M-10
3 Providing and fixing in position 300 1035 Rmt 627.30
mm dia NP2 R.C.C pipe with collar
including filling and caulking the
joints with cement mortar 1:1
proportion, finishing , curing etc.
complete for all lead and lifts.
4 .Refiling the pipeline trenches 237.38 Cmt 22
included ramming watering
consolidating desposal of surplus
stuff as directed a radius of 1 km
Rupees Eight Lakh Eighty Four Thousand Eight Hundred and Eight Rupees and Sixteen
I/We am/are willing to carry out the work at .......................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note:-GST as per prevailing rate shall be paid Extra.
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ deladva pipeline.pdf
SBD deladva pipeline new.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .