Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹41.4 LAccepted-Finance | ₹41.4 L | L-1 | Accepted-Finance Accepted as per committee approval |
| 2 | L-2₹41.6 LRejected-Finance WARD NO 04 SUNHARI KICHHA U S NAGAR | CHAMOLI | UTTARAKHAND | 246401 | ₹41.6 L | L-2 | Rejected-Finance Due to higher rate |
| 3 | L-3₹42.0 LRejected-Finance KATORATAL STREET KASHIPUR U S NAGAR | DEHRADUN | UTTARAKHAND | 248001 | ₹42.0 L | L-3 | Rejected-Finance Due to higher rate |
| Sl No | Description | Qty | Unit | RANA ELECTRICALS L1 | MANRAJ ELECTRICAL & INFRASTRUCTURE L2 | M/S J K ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00Annexure-A (LABOUR CHARGES) | ||||||
| 1.01 | Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. | 160 | Kg. | 21 ₹3,360 | 23 ₹3,680 | 25 ₹4,000 |
| 1.02 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. | 7.65 | CBM | 239 ₹1,828.35 | 242 ₹1,851.30 | 245 ₹1,874.25 |
| 1.03 | Erection of PCC single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. | 10 | Nos | 1,298 ₹12,980 | 1,305 ₹13,050 | 1,310 ₹13,100 |
| 1.04 | Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. (100 KVA). | 8 | Nos | 2,198 ₹17,584 | 2,210 ₹17,680 | 2,225 ₹17,800 |
| 1.05 | Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm. (Including all cost of material). | 1,200 | Mtr. | 25.4 ₹30,480 | 26 ₹31,200 | 28 ₹33,600 |
| 1.06 | Excavation of earth of size 2.1x2.1x1.2 meter for DTR Plinth | 11.2 | CBM | 248 ₹2,777.60 | 250 ₹2,800 | 255 ₹2,856 |
| 1.07 | Brick work in 1:4 ratio of DTR Plinth. | 36.8 | CBM | 6,898 ₹2.5 L | 6,950 ₹2.6 L | 7,000 ₹2.6 L |
| 1.08 | RCC Work of 1:2:4 ratio 15 cm thickness of DTR Plinth | 1.8 | CBM | 6,798 ₹12,236.40 | 6,850 ₹12,330 | 6,900 ₹12,420 |
| 1.09 | Cement Plaster on side walls in 1:4 ratio on DTR Plinth | 68 | SQM | 539.5 ₹36,686 | 545 ₹37,060 | 548 ₹37,264 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹84,000
Closing Date
11 May 2026, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Work of Increasing Capacity of various overloaded DTRs, installation of new DTRs and construction of concerning line at rural area in 33/11 KV S/s Matkota under EDSD-I Rudrapur under Electricity Distribution Division, Rudrapur-I
2026_UPCL3_93846_1
EDC(USN)84/2025-26
Open Tender
Electrical Works
90 days
Rudrapur
Pl. refer tender documents
4 documents required · 4 mandatory
₹2,360
EE ETD Rudrapur
₹84,000
5 Jun 2026
4 Apr 2026
12 May 2026
4 Apr 2026
11 May 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Annexure-A (LABOUR CHARGES) | - | - | - | - |
Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. | 160 | Kg. | - | - | |
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. | 7.65 | CBM | - | - | |
Erection of PCC single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. | 10 | Nos | - | - | |
Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. (100 KVA). | 8 | Nos | - | - | |
Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm. (Including all cost of material). | 1,200 | Mtr. | - | - | |
Excavation of earth of size 2.1x2.1x1.2 meter for DTR Plinth | 11.2 | CBM | - | - | |
Brick work in 1:4 ratio of DTR Plinth. | 36.8 | CBM | - | - | |
RCC Work of 1:2:4 ratio 15 cm thickness of DTR Plinth | 1.8 | CBM | - | - | |
Cement Plaster on side walls in 1:4 ratio on DTR Plinth | 68 | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_111063.xls
BOQ • 0.34 MB
TN842526tenderdocumentsmatkotaic.pdf
Tender Documents • 1.43 MB
Generalinstructions842526.pdf
Other Document • 0.75 MB
FormAandB.pdf
Other Document • 0.67 MB
Download all tender documents and submit your bid