| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-Finance F NO 312 3RD FLOOR HERITAGE PRINCESS OPP ALMEIDA SCHOOL PONDA GOA 403 401 | SOUTH GOA | GOA | 403401 | ₹23.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹27.3 LRejected-Finance H NO 1468 6 FAJ HOUSING COLONY MADEL THIVIM GOA | THIVIM | GOA | ₹27.3 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Tender notice no. and name of work quoted on the self declaration enclosed are wrong. |
| Sl No | Description | Qty | Unit | P. Shivaji L2 | Mr. Abdul Basheer B. A. L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted incl. chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring and bracing, removal of stump and other deleterious matter, dresing of sides and bottom and backfilling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas with all leads and lifts etc as per specification and drawing and as directed by the Engineer-in-charge. | 454.72 | Cum | 650 ₹3.0 L | 350 ₹1.6 L |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 37.12 | Cum | 2,600 ₹96,512 | 1,936.5 ₹71,882.88 |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for a) Foundations, footings, bases for columns and mass concrete. | 292.64 | Sq. m | 600 ₹1.8 L | 450 ₹1.3 L |
| 4.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:a)All works upto plinth level. | 170.08 | Cum | 6,000 ₹10.2 L | 6,000 ₹10.2 L |
| 5.00 | Laterite boulder masonry in cement mortar 1:3 in foundation | 114.65 | Cum | 6,200 ₹7.1 L | 5,000 ₹5.7 L |
| 6.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge A) 110mm Dia. | 110 | RM | 150 ₹16,500 | 540 ₹59,400 |
Tender Value
₹23.4 L
EMD Value
₹46,878
Closing Date
23 Feb 2026, 4:00 pmClosed
EEXI, WRD
Ravonfond, Navelim
Stabilization to the left bank of nallah at Tarana Male in Shirshirem Borim of Shiroda Constituency. (2nd Call)
2026_WRD_27675_1
WDXI/PB/F.24/2025-26/1489Sr2
Open Tender
Miscellaneous Works
60 days
Ravonfond, Navelim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹46,878
5 Jun 2026
9 Feb 2026
25 Feb 2026
9 Feb 2026
23 Feb 2026
9 Feb 2026
Earthwork in excavation by mechanical means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and such material either in full or in parts, as the case may be adopting any approved method or methods as may be convenient or permitted incl. chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring and bracing, removal of stump and other deleterious matter, dresing of sides and bottom and backfilling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas with all leads and lifts etc as per specification and drawing and as directed by the Engineer-in-charge.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:a)All works upto plinth level.
Laterite boulder masonry in cement mortar 1:3 in foundation
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer in charge A) 110mm Dia.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 0.85 MB
BOQ_28119.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid