| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹65.3 LAdmitted-Finance | -2.55% | ₹65.3 L | L1 | Admitted-Finance |
| 2 | L2₹66.3 L+₹1.0 L (1.59%)Admitted-Finance | -1.00% | ₹66.3 L+₹1.0 L (1.59%) | L2 | Admitted-Finance |
| 3 | L3₹67.0 L+₹1.7 L (2.61%)Admitted-Finance MATHABHANGA COOCH BEHAR | COOCHBEHAR | WEST BENGAL | 736146 | -0.01% | ₹67.0 L+₹1.7 L (2.61%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Documents not found in order |
Tender Value
₹67.0 L
EMD Value
₹1.3 L
Closing Date
3 Jun 2026, 5:00 pmClosed
Dy Commandant Engineer
Office of DIG SHQ SSB Jalpaiguri
Construction of Chain link fencing along with Sentry post security gate at BOP Today under 46th BN SSB Malbazar
2026_SSB_910122_1
DC(Engr)/SHQ/JPG/2026-27/05
Open Tender
Civil Works - Others
Percentage
180 days
BOP Todey
As per tender documents
4 documents required · 4 mandatory
₹0
₹1.3 L
9 Jun 2026
26 May 2026
4 Jun 2026
26 May 2026
3 Jun 2026
26 May 2026
26 May 2026 - 3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. Ordinary rock | 96.2 | cum | 572.81 | ₹55,104.32 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 96.2 | cum | 225.04 | ₹21,648.85 |
| 3 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 4.21 | cum | 804.28 | ₹3,386.02 |
| 4 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 18.33 | cum | 9,045.62 | ₹1,65,806.21 |
| 5 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 21.93 | cum | 7,821.13 | ₹1,71,517.38 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 873.6 | sqm | 450.24 | ₹3,93,329.66 |
| 7 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 6.48 | sqm | 860.3 | ₹5,574.74 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3(1 cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 21.86 | cum | 10,385.78 | ₹2,27,033.15 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.66 | cum | 12,460.71 | ₹20,684.78 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.61 | cum | 13,209.92 | ₹34,477.89 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 31.75 MB
Tendernotice_3.pdf
PDF • 2.42 MB
BOQ_956654.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .