Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance | -15.85% | ₹7.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.9 L+₹12,509.23 (1.60%)Admitted-Finance | -14.50% | ₹7.9 L+₹12,509.23 (1.60%) | L2 | Admitted-Finance |
| 3 | L3₹8.5 L+₹69,681.01 (8.94%)Admitted-Finance | -8.33% | ₹8.5 L+₹69,681.01 (8.94%) | L3 | Admitted-Finance |
| 4 | L4₹8.7 L+₹91,734.31 (11.8%)Admitted-Finance | -5.95% | ₹8.7 L+₹91,734.31 (11.8%) | L4 | Admitted-Finance |
Tender Value
₹9.3 L
EMD Value
₹18,550
Closing Date
16 Apr 2026, 3:00 pmClosed
SE IITGN
AB09-303, IIT Gandhinagar
Addition and Alteration in Civil Works through Minor works at Academic Area, IIT Gandhinagar, Palaj, Gandhinagar
2026_IITGN_905039_1
01/IITGN/ IWD/2026-27
Open Tender
Civil Works
Percentage
IIT Gandhinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Payable To IIT GANDHINAGAR
₹18,550
29 Apr 2026
9 Apr 2026
17 Apr 2026
9 Apr 2026
16 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. | - | sqm | - | - |
| - | Refixing of aluminium partition work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling to be paid for separately) :
Powder Coated aluminium section partition work. | - | sqm | - | - |
| - | Providing and fixing 12 mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS: 12823 Grade l Type ll, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-in-charge. Pre-laminated particle board with decorative lamination on one side and balancing lamination on other side. | - | sqm | - | - |
| - | Hacking of CC flooring including cleaning of surface etc. complete as per the direction of the engineer-in-charge | - | sqm | - | - |
| - | Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete | - | sqm | - | - |
| - | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | - | cum | - | - |
| - | Providing and laying Vitrified tiles in floor in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 coarse sand) jointing with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier, wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily.
Glazed Vitrified tiles Matt/Antiskid finish of size 600 x 600 mm | - | sqm | - | - |
| - | Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joint with white cement & matching pigments etc. complete.
Size of Tile 600x600 mm | - | sqm | - | - |
| - | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications : Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm | - | sqm | - | - |
| - | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_951280.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .