Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AT BHATTI ROAD PO BIRAMITRAPUR DIST SUNDARGARH | Accepted-Technical by tender commitee |
| 2 | Accepted-Technical | Accepted-Technical by tender commitee |
| 3 | Accepted-Technical CUTTACK CUTTACK ODISHA | CUTTACK | ODISHA | 752120 | Accepted-Technical by tender commitee |
| 4 | Accepted-Technical | Accepted-Technical by tender commitee |
| 5 | Accepted-Technical NEAR POLICE COLONY UDITNAGAR ROURKELA 769012 | ROURKELA | SUNDARGARH | ODISHA | 769012 | Accepted-Technical by tender commitee |
Tender Value
₹81.1 L
EMD Value
₹81,200
Closing Date
2 Jul 2026, 5:00 pmClosed
Divisional Officer
Office of Superintending Engineer Rourkela R and B division
Construction of Meeting Hall S plus 1 at Sub-Collector office at Uditnagar, Rourkela as per Revenue and DM Deptt. Lr. No. 1214 dt. 08.01.2026 Buildings.
2026_EICCL_132416_1
NIT 06 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Sundergarh
6 documents required · 6 mandatory
₹10,000
₹81,200
Yes
19 Sept 2026
19 Jun 2026
3 Jul 2026
19 Jun 2026
2 Jul 2026
19 Jun 2026
19 Jun 2026 - 26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work-I Earth work in excavation in foundation in all kinds of soil including dressing and leveling the bed and depositing the soil within initial lead of 50 M and initial lift of 1.5 M as may be directed and providing shoring and shuttering & struts if necessary complete. | 190.61 | cum | 306.01 | ₹58,328.57 |
| 2 | Supplying, filling in foundation and plinth with sand well watered and rammed in 22.5cm 9" layers with all leads and lifts cost, conveyance, labour, T&P etc. complete (measurement will be taken on finished compacted section only.) | 252.24 | cum | 554.59 | ₹1,39,889.78 |
| 3 | Cement concrete (1:3:6) in foundation and plinth with HGCB metal of 4cm. (1/2") size including lowering, laying, cost, conveyance, royalties, taxes, labour, T&P watering, curing etc. complete. | 34.13 | cum | 5,932.69 | ₹2,02,482.71 |
| 4 | RCC work M20 grade using 12mm size HGCB chips of approved quality and from approved quarry including centering, shuttering, watering and curing with cost, conveyance, royalties & taxes of all materials, cost of labour, T&P etc. complete as per direction of the Engineer-in-charge. i)Column base | 41.68 | cum | 6,382.93 | ₹2,66,040.52 |
| 5 | RCC work M20 grade using 12mm size HGCB chips of approved quality and from approved quarry including centering, shuttering, watering and curing with cost, conveyance, royalties & taxes of all materials, cost of labour, T&P etc. complete as per direction of the Engineer-in-charge. vi) CHAJA & SUNSHED a) First floor | 13.86 | sqm | 1,413.47 | ₹19,590.69 |
| 6 | RCC work M20 grade using 12mm size HGCB chips of approved quality and from approved quarry including centering, shuttering, watering and curing with cost, conveyance, royalties & taxes of all materials, cost of labour, T&P etc. complete as per direction of the Engineer-in-charge. ii)Column & beam a)Stilt floor | 17.85 | cum | 15,768.51 | ₹2,81,467.9 |
| 7 | RCC work M20 grade using 12mm size HGCB chips of approved quality and from approved quarry including centering, shuttering, watering and curing with cost, conveyance, royalties & taxes of all materials, cost of labour, T&P etc. complete as per direction of the Engineer-in-charge. ii)Column & beam b) First floor | 17.85 | cum | 17,829.15 | ₹3,18,250.33 |
| 8 | RCC work M20 grade using 12mm size HGCB chips of approved quality and from approved quarry including centering, shuttering, watering and curing with cost, conveyance, royalties & taxes of all materials, cost of labour, T&P etc. complete as per direction of the Engineer-in-charge. ii)Column & beam c) Second floor | 4.07 | cum | 20,296.49 | ₹82,606.71 |
| 9 | RCC work M20 grade using 12mm size HGCB chips of approved quality and from approved quarry including centering, shuttering, watering and curing with cost, conveyance, royalties & taxes of all materials, cost of labour, T&P etc. complete as per direction of the Engineer-in-charge. iii) Plinth beam a) Stilt floor | 8.36 | cum | 7,257.71 | ₹60,674.46 |
| 10 | RCC work M20 grade using 12mm size HGCB chips of approved quality and from approved quarry including centering, shuttering, watering and curing with cost, conveyance, royalties & taxes of all materials, cost of labour, T&P etc. complete as per direction of the Engineer-in-charge. iv) Lintel a) First floor | 2.27 | cum | 15,827.65 | ₹35,928.77 |
stage.html
html • 0.07 MB
tech_eval.pdf
cancelled_1.pdf
pdf • 1.28 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 7.00 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_597066.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .