Tender Value
₹12.3 L
EMD Value
₹13,000
Closing Date
29 Jun 2026, 6:00 pmClosed
Executive Engineer, Panchayat (R&B) Division, Tapi
Vivekadhin Jogvay 2026-27 Const of Shed in Primary School at Village Fulvadi Ta. Kukarmunda Dist.Tapi.
316279
03 OF 2026-27
Open
Civil Works - Buildings
Works
Tapi
6 documents required · 6 mandatory
₹900
Executive Engineer, Panchayat (R&B) Division, Tapi-Vyara
₹13,000
21 Jun 2026
21 Jun 2026
21 Jun 2026
29 Jun 2026
21 Jun 2026
Name of Work:- Vivekadhin Jogvay 2026-27Const of Shed in Primary School at Village Fulvadi Ta.
Kukarmunda Dist.Tapi.
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification Rate In
Quantity Unit Amount
No. and reference to book of specifications) Figures
1 Excavation for foundation upto 1.5 m depth including 6.08 Cum. 261.82
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter
lead.(C) Hard Murrum
2 Filling available excavated earth (excluding rock in 3.04 Cum. 133.66
trenches plinth, slides of foundations etc. in layers not
exceeding 20 cm in depth consolidating each
deposited layer by ramming and watering)
3 Filling in foundation and plinth with murrum or 41.61 Cum. 296.30
selected soil in layers of 20cm thickness including
watering ramming and consolidating etc. complete
4 Providing and laying cement concrete 1:2:4 (1- 22.32 Cum. 3713.67
Cement : 2- Coarse sand : 4- graded stone
aggregates 20 mm nominal size) and curing complete
excluding cost of formwork in (A) Foundation and
Plinth (more than 10 ton)
5 Providing and laying controlled cement concrete M- 4.26 Cum. 8871.33
200 and curing complete including the cost of form
work but excluding cost of reinforcement for
reinforced concrete work for Column upto plinth level.
6 Providing and laying controlled cement concrete 7.21 Cum. 6375.70
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced concrete
work in (D) Columns, Pillars posts and struts, upto
floor two level. (more than 10 ton
7 Brick work using common burnt clay building brick 16.45 Cum. 4121.55
having crushing strength not less than 35 kg/sq. cm.
in foundation and plinth in cement mortar 1:6 (
Cement: 6 fine sand) (B) Convention
8 Providng TMT bars renforcement of FE 500/500D for 3486.87 kg 77.29
R.C.C. work including bending binding and placing in
position complete for all floor.
9 20 mm thick sand faced cement plaster with on wall 113.16 Sqmt 135.53
upto all height above ground level consisting 12 mm
thick backing coat of c.m. 1:3 (1 cement : 3 sand ) and
8 mm thick finishing coat of cm 1:1 (1 cement :
sand) etc. complete.all height etc. complete.
10 Steel work, welded in built up sections framed work 35.20 Qui 9908.67
including cutting, hoisting, fixing in position and
applying a priming coat of red lead paint. (D) In
trussses and trussed purlins, upto 25 M. span and
M. ovarall height.
11 Providing corrugated G.I. sheet of class-3 roofing 176.17 Sqmt 734.19
fixed with glavanished iron J or L Hooks, Bolts and
nuts 8mm diameter with bitumen and G.I. limpet
washer or G.I. limpet washer. filled with white lead
complete excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
12 Providing and laying polished Kota stone slab flooring 200.30 Sqmt 1015.82
over 20mm (Average) thick base of cement mortar 1:6
(1-cement : 6-coarse sand) or L.M. 1.1.5 (1-Lime putty
:1.5 - coarse sand) laid over and jointed with grey
cement slurry mixed with pigment to match the shade
of slab including rubbing and polishing etc. complete.
13 Wall painting (two coats) with plastic emulsion paint of 113.16 Sqmt 86.93
approved brand and manufacture with on undecorated
wall surface to give an even shade including throughly
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth along
ceilings and sloping roofs.
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written
in figures and words) of the estimated rate mentioned above Amount of my / our tender works out as
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works
directed by the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where the reisa change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Shed Fulvadi.pdf
building booklet.pdf
GRs - SBD with Index.pdf
SBD_Shed Fulvadi.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .