| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹1.1 L (0.96%)Rejected-AOC LOCATION TRIPURA TR | WEST TRIPURA | TRIPURA | 799005 | ₹1.1 Cr+₹1.1 L (0.96%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.2 Cr+₹8.3 L (7.50%)Rejected-AOC THANA ROAD DHARMANAGAR NORTH TRIPURA 799250 | DHARMANAGAR | NORTH TRIPURA | TRIPURA | 799250 | ₹1.2 Cr+₹8.3 L (7.50%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.4 Cr+₹25.3 L (22.7%)Rejected-AOC C O LT BHUBESH CH DAS VILL NORTH PADMABIL P S PANISAGAR NORTH TRIPURA | ₹1.4 Cr+₹25.3 L (22.7%) | L4 | Rejected-AOC L4 |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
20 Mar 2026, 3:00 pmClosed
Oo. the Executive Engineer, PWD (RnB) Division, Dh
Oo. the Executive Engineer, PWD (RnB) Division, Dharmanagar, North Tripura
Metalling, grouting, PMC, etc. during the year 2025-26
2026_CEPWD_71568_1
33/SE(I)/KGT/2025-26
Open Tender
Civil Works - Roads
Percentage
90 days
Kadamtala
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
₹2.9 L
7 Aug 2026
12 Mar 2026
20 Mar 2026
12 Mar 2026
20 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying Existing Bituminous Surface to a depth of 150 mm by Mechanical Means. Scarifying Existing bituminous Road Surface by mechanical means to a Depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per MoRD Technical Specification Clause 301.4. | 1 | Sqm | 10.2 | ₹10.19 |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m,
transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical
Specification Clause 301.5. | - | Cum | 245.4 | - |
| 3 | Water Bound Macadam Sub-Base / Base using Jhama Brick Aggragate.WBM Grading - 3.Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,
hand packing rolling with three wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading- 3 as per MoRD Technical
Specification Clause 405.By Manual Means. | 0.4 | Cum | 7,474.1 | ₹2,982.17 |
| 4 | Tack coat using hot straight run bitumen of grade VG-30 on W.B.M. Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per
specifications: On W.B.M. @ 0.75 kg/ sqm. | 1 | Sqm | 55.2 | ₹55.14 |
| 5 | Tack coat using hot straight run bitumen of grade VG-30 on bituminous surface. Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per
specifications: On bituminous surface @ 0.50 Kg/ Sqm. | - | Sqm | 41 | - |
| 6 | Maintenance of bituminous surface road
Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with 75 mm B.M, after applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per MoRD technical specification Clauses 1900, 502, 503 and 504. | - | Cum | 17,862.7 | - |
| 7 | 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder. Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or
emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508.By Manual Means. Bitumen of VG-30. | 1 | Sqm | 336.8 | ₹336.46 |
| 8 | Seal Coat.Providing and laying seal coat using the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510.Type D (premix with fine sand).Bitumen of VG-30. | - | Sqm | 77.1 | - |
| 9 | Maintenance of Earthen shoulder (Stripping of
excess soil).Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawing and MoRD technical specification Clause 1903. | - | Sqm | 19.1 | - |
| 10 | Surface Drains . Construction of unlined surface drains of average crosssectional area 0.4 sqm in ordinary soil to specified lines, grades, levels and dimensions as per MoRT&H Technical Specification clauses of section 300. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m). Manual Means. | - | Mtr | 114.6 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
DNITPDF_merged.pdf
Tender Documents • 4.91 MB
BOQ_72822.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .