Loading…
Loading…
Tender ID
Tender Value
₹8.1 L
EMD Value
₹9,000
Closing Date
12 Mar 2026, 6:00 pmClosed
Executive Engineer, Navrangpura (R&B) Division, Ahmedabad
S.R. to Govt. Water supply Bit office at polytechnic campus, Ambawadi, Ahmedabad. (Providing, Fixing and Repairing of Brick work, plaster work, Water supply pipe, Valve and other misc works) (2nd attempt)
282444
24 of 2025-26
Open
Civil Works - Buildings
Works
Ahmedabad
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer, Navrangpura (R and B) Division, Ahmedabad
₹9,000
Yes
3 Mar 2026
3 Mar 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
Name of Work :- S.R. to Govt. Water supply Bit office at polytechnic campus, Ambawadi,
Ahmedabad. (Providing, Fixing and Repairing of Brick work, plaster work, Water
supply pipe, Valve and other misc works) (2nd attempt)
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
1 60.00 Excavation for foundation upto 1.5 117.08 Rupees One Cmt
m depth including sorting out and Hundred
stacking of useful materials and Seventeen
disposing off the excavated stuff And Paise
upto 50 Meter lead.(A) Loose or Eight Only
2 50.00 Filling available excavated Earth 130.39 Rupees One Cmt
(Excluding Rock ) in trench plinth Hundred
side of foundation etc. in layer not Thirty And
exceeding 20 cm in depth Paise Thirty
consolidation each deposited layer Nine Only
by ramming and watering etc.
3 5.00 Brick work using common burnt 4051.78 Rupees Four Cmt
clay building bricks having Thousand
crushing strength not less than 35 Fifty One And
kg./Sq.Cm. in foundation and plinth Paise Seventy
in Cement Mortar 1:5.(1- Cement Eight Only
: 5 -fine sand)(B) Conventional
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
4 100.00 Providing 15mm thick cement 176.58 Rupees One Smt
plaster in single coat on Rough Hundred
(Similar)side of single or half Seventy Six
brick walls for interior plastering And Paise
upto floor two level and finished Fifty Eight
even and smooth in (i) Cement Only
mortar 1:3 (1-cement:3-sand)
5 30.00 Providing, laying and jointing in 91.84 Rupees Rmt
true line and level 25 mm dia. Ninety One
U.P.V.C. Pipe (SCH-40) for cold And Paise
water including fittings as approved Eighty Four
by Engineer-In-Charge. Pipe shall Only
be fixed on the wall with the help of
clamp at every two metre C / C or
shall be concelled as directed
including necessary fittings etc.
including testing of pipe and joints
and fixing the same with adhesive
solvent, including cost of all
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
6 50.00 Providing, laying and jointing in 148.12 Rupees One Rmt
true line and level 40 mm dia. Hundred Forty
U.P.V.C. Pipe (SCH-40) for cold Eight And
water including fittings as approved Paise Twelve
by Engineer-In-Charge. Pipe shall Only
be fixed on the wall with the help of
clamp at every two metre C / C or
shall be concelled as directed
including necessary fittings etc.
including testing of pipe and joints
and fixing the same with adhesive
solvent, including cost of all
7 70.00 Providing, laying and jointing in 195.67 Rupees One Rmt
true line and level 50 mm dia. Hundred
U.P.V.C. Pipe (SCH-40) for cold Ninety Five
water including fittings as And Paise
approved by Engineer-In-Charge. Sixty Seven
Pipe shall be fixed on the wall with Only
the help of clamp at every two
metre C / C or shall be concelled
as directed including necessary
fittings etc. including testing of pipe
and joints and fixing the same with
adhesive solvent, including cost of
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
8 60.00 Providing, laying and jointing in 1449.55 Rupees One Rmt
true line and level 80 mm diametre Thousand
U.P.V.C SH-80 pipe of approved Four Hundred
make for water supply system pipe Forty Nine
line, pipe shall be jointed with each And Paise
other with rubber lubricant, as Fifty Five Only
directed including necessary
fittings such as bends, shoes etc.
including testing of pipes and joints
and jointed with adhesive solvent
cement including cost of all
materials & labour.
9 65.00 Providing and laying and fixing 100 2110.91 Rupees Two Rmt
mm UPVC SH-80 water supply Thousand
pipe with necessary fittings like tee, One Hundred
elbow, union, coupler etc. in wall, Ten And
floor and conceled in wall and Paise Ninety
finished with cement mortar to give One Only
even finish of approved brand like
Astral or finolex or equilent etc.
10 200.00 Dismentalling C.I. Pipes G.S.W. 74.77 Rupees Rmt
Pipes and A.C. Rain water pipes Seventy Four
with fittings and clamps including And Paise
stacking the materials with all lead Seventy
and lift (for any dia. Of pipe). Seven Only
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
11 30.00 Providing and fixing to wall, 787.40 Rupees Rmt
ceiling and floor galvanised Mild Seven
steel tubes (Medium grade) of the Hundred
following nominal bore, tube Eighty Seven
fitting and clamps including And Paise
making good the wall ceiling and Forty Only
12 25.00 Providing and Fixing D. I. K-9 4177.92 Rupees Four Rmt
grade D/F pipes (IS 8329-2000]. Thousand
for following nominal bore One Hundred
diameter with internal cement Seventy
mortar lining including all cost of Seven And
all jointing materials rubber Paise Ninety
packing, nut bolts, inclduing Two Only
lowering, laying jointing labour
hydraulic testing etc. complete.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
13 12.00 Labour charges for repairing 1816.99 Rupees One No
leakage in CI/DI pipeline of Thousand
following diameter at different Eight Hundred
places including necessary Sixteen And
excavation manually or by Paise Ninety
machinery, removing of mud, Nine Only
dewatering, cleaning of pipe,
cutting of pipe Jointing &
repairing using CID joints
including CID joints, rubber
rings, nut bolts, hiring excavator,
Hydra/ Crane, dewatering
machine, fuel, operator etc
complete (including cost of
jointing material but excluding
cost of pipe).100 mm dia
14 15.00 Labour charges for repairing 2520.96 Rupees Two No
leakage in CI/DI pipeline of Thousand
following diameter at different Five Hundred
places including necessary Twenty And
excavation manually or by Paise Ninety
machinery, removing of mud, Six Only
dewatering, cleaning of pipe,
cutting of pipe Jointing &
repairing using CID joints
including CID joints, rubber
rings, nut bolts, hiring excavator,
Hydra/ Crane, dewatering
machine, fuel, operator etc
complete (including cost of
jointing material but excluding
cost of pipe).150 mm dia
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
15 15.00 Labour charges for repairing of 1864.46 Rupees One No
leakage in AC pipeline of falling Thousand
diameter at different places Eight Hundred
including necessary excavation Sixty Four
manually or by mechanized And Paise
excavation, removing of mud, Forty Six Only
cleaning of pipe and leakage
portion cutting the pipeline &
removing piece of pipe from trench
with inclussive of mechanical
deviced JCB, Hydra/Crain if
necessary & labours required with
providing material such Turened
C.I.D. joints with nut bolt, rubber
rings etc comp. (incl. all material
but Exclu. cost of pipe).150 mm
16 9.00 Providing and fixing ball cock of 132.89 Rupees One No
approved quality as directed. (A) Hundred
Copper metal. (I) 25 mm Thirty Two
diameter. And Paise
17 9.00 Providing and fixing ball cock of 189.84 Rupees One No
approved quality as directed. (A) Hundred
Copper metal. (ii) 50 mm Eighty Nine
diameter. And Paise
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
18 2.00 Providing and fixing C.I Sluice 23209.80 Rupees No
valveISI marked of make Zoloto, Twenty Three
D.R.P. or equivalent as approved Thousand
by Engineer-in-charge 150 mm dia. Two Hundred
19 2.00 Providing and fixing C.I Sluice 16203.43 Rupees No
valve ISI marked of make Zoloto, Sixteen
D.R.P. or equivalent as approved Thousand
by Engineer-in-charge 100 mm dia. Two Hundred
20 2.00 Providing and fixing C.I check or 17303.32 Rupees No
non return full way Gate valveISI Seventeen
marked of make Zoloto, D.R.P. or Thousand
equivalent as approved by Three
Engineer-in-charge 150 mm dia. Hundred
21 2.00 Providing and fixing C.I check or 9313.21 Rupees Nine No
non return full way Gate valveISI Thousand
marked of make Zoloto, D.R.P. or Three
equivalent as approved by Hundred
Engineer-in-charge 100 mm dia. Thirteen And
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
22 10.00 Providing and fixing of brass 3535.00 Rupees Three No
spindle rod & nut of standard Thousand
quality for operating valve of Five Hundred
following dia. as approved by Thirty Five
Engineer in Charge.( 150 mm dia.) Only
23 8.00 Providing and fixing of brass 3257.25 Rupees Three No
spindle rod & nut of standard Thousand
quality for operating valve of Two Hundred
following dia. as approved by Fifty Seven
Engineer in Charge.( 100 mm dia.) And Paise
24 7.00 Proding julla structure for height up 3030.00 Rupees Three DAYS
to 14th storey building with labour Thousand
and all arrangement for outside Thirty Only
reparing work etc. directed by
engeer in charge.
25 2640.00 Supplying and Spreading of 18.18 Rupees KG
bleaching powder of standard Eighteen And
quality as approved by Engineer in Paise
Charge. Eighteen Only
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
26 150.00 Finishing wall with weather proof 114.53 Rupees One Smt
exterior emulsion paint on wall Hundred
surface (two coats) to give an Fourteen And
requiredshape even shade after Paise Fifty
thoroughly brushing thesurface to Three Only
remove all dirt, and remains of
loosepowdered materials.etc
Rs. In words : Rupees Eight Lakh(s) Twelve Thousand Eight Hundred Sixty Seven And Paise
I / We am / willing to carry out the work at __________ above / below __________ percentage
(should be written in figures and words) above / below the estimated amount mentioned above.
Amount of my/our tender works out as under.
Estimated Amount put to Estimated Amount put to
Deduct _________ % Below. Add _________ % Above.
Note : The comparision of Lowest Bidder will be made as under :
1. The Contractor shall exhibit a board with detailed specification and details of work as directed by
the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In Figures In Words Estimated
more or quantities
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.
G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated inS.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the costof difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
5. Credit of Rs. 10,500/- shall be recovered from the payable bills towards cost of dismental materials.
Dated Signature of Executive Engineer
the Contractor Navrangpura (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001-SBD (Water Supp Bit-Repairing)-2nd attempt.pdf
002-Sch-B (Water Supply Bit Office-Rep)-2nd attempt.pdf
003-Dismental St (Water Supply Bit Office-Rep).pdf
004-Specification (Water Supply Bit Office-Rep).pdf
005-GR as per SBD (12-01-2024)-Navrangpura.pdf
006-Standards for Cement Con. Dt.11-5-2017.pdf
007-Single Tender GR Dt.18-2-2017.pdf
008-Tender Negotiation Dt.08-06-2018.pdf
009-Testing Schedule Dt.24-10-1994.pdf
010-GR Regarding Laplength in Reinforcement Dt.15-2-2017.pdf
011-FD Circular No 1097 GST Dt.15-9-2018.pdf
012-Registration Mandatory Dt.3-9-2016.pdf
013-Tender Reinvite Guideline Dt.25-8-2015.pdf
014-E-Tendering-Tender Fee and EMD Dt18-1-2008.pdf
015-E-Tendering-Tender Fee and other doc Dt.27-11-2008.pdf
016-Payment through RTGS-NEFT Dt.30-4-2018.pdf
017-RMC (Dt.15-07-2023)for above 5 cr works.pdf
018-COMPUTERISED MB GR Dt.1-2-2017.pdf
019-Bond-Colour.pdf
020-Bond-Water proofing.pdf
021-Bond-Antitermite.pdf
022-Bond-FRP Door.pdf
023-Mix Design Condition.pdf
024-Specification Booklet-BUILDING.pdf
025-E Tender Notice-24 of 2025-2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .