Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
23 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Officer, Dahod Nagarpalika, Dahod
BID DOCUMENT FOR SEWER COLLECTION NETWORK IN VARIOUS AREAS AT DAHOD NAGARPALIKA PHASE 1 and 2 UNDER 15TH FINANCE SCHEME (FIRST INSTALLMENT) TIED GRANT YEAR 2024-25.
361195
15TH FINANCE SCHEME FIRST INSTALLMENT TIED GRANT YEAR 2024-25.
Open
Civil - All
Works
Dahod
14 documents required · 14 mandatory
₹4,248
The Chief Officer, Dahod Municipality, Dahod
₹1.4 L
30 Oct 2026
30 Oct 2026
30 Oct 2026
23 Nov 2026
30 Oct 2026
120 days
Total Amount Rs.
Note : 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in
R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
Signature of Contractor President Chief Officer
Dahod Nagarpalika Dahod Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-155
DAHOD MUNICIPALITY, DAHOD
SEWER COLLECTION NETWORK AT DAHOD VARIOUS AREAS PHASE - 1 AT DAHOD. 150 to 300MM DIA.
GENERAL SUMMARY
DESCRIPTION TOTAL AMOUNT
DESCRIPTION TOTAL AMOUNT
SEWER COLLECTION NETWORK AT DAHOD VARIOUS AREAS PHASE - 1 AT DAHOD.
150 to 300MM DIA.
Add GST 18% Rs.
Total Amount With GST Rs.
Total Amount With GST Rs.
Contingency on Project Components @ 2% Rs.
Quality Control at 1% Rs.
Total Project Cost Rs.
SBD SECTION-7 BILL OF QUANTITIES-156
DAHOD MUNICIPALITY, DAHOD
SEWER COLLECTION NETWORK AT DAHOD VARIOUS AREAS PHASE - 1 AT DAHOD. 150 to 300MM DIA.
Total Rate Amount
Sr No Item Description Unit Quantity
(in Rupees) (in Rupees)
Providing and supplying ISI standard RCC pipes (of Sulphate
resisting Cement) in standard lengths of following class and
diameter suitable for either collar joints or rubber ring joints
including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to
1 departmental stores, stacking etc. complete as per (IS
458/1989). Test pressure 0.7 Kg/sq.cm Note : One collar should
be provided with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with
each full length socketed pipe, cost included in rates below.
(Class NP3 Test Pressure 0.7 kg/sq.cm)
1.1.1 150mm dia.(Horizontal Cast) Rmt 45.00 331.00
1.1.2 200mm dia.(Horizontal Cast) Rmt 2130.00 417.00
1.1.3 250mm dia.(Horizontal Cast) Rmt 55.00 527.00
1.1.4 300mm dia.(Horizontal Cast) Rmt 130.00 755.00
Lowering, laying and jointing R.C.C. pipes in C.M 1:1 1/2 of
following in proper position, grade and alignment as directed by
2 Engineer in charge including conveyence from stores to site work,
labour, giving hydraulic testing as per ISI code etc complete.
2.1 150mm dia. NP-3 Class m 40.00 72.45
2.2 200mm dia. NP-3 Class m 2130.00 101.20
2.3 250mm dia. NP-3 Class m 55.00 111.55
2.4 300mm dia. NP-3 Class m 130.00 136.85
Excavation for pipe line trenches for water supply, sewerage line,
manhole etc. all with shoring and struting if required as per
required gradient and line including safety provisions using site
rails and stacking excavated stuff including up to all required lead
cleaning the site etc. complete for all lifts and strata as specified.
3.1 Excavation Up To 0.0 Mt To 1.50 Mt Depth
3.1.1 In all Sorts Of Soil and Soft murrum m³ 810.00 102.35
3.1.2 In Hard Murrum, Boulder incl. macadam road m³ 1215.00 155.25
In soft Rock and / or masonary in CM or LM or Lime Concrete.
3.1.4 In Hard Rock and /or or in C.C.1:2:4 only. m³ 1215.00 427.80
3.2 Excavation Up To 1.5 Mt To 3.0 Mt Depth
3.2.1 In all Sorts Of Soil and Soft murrum m³ 37.00 112.70
3.2.2 In Hard Murrum, Boulder incl. macadam road m³ 73.00 170.20
In soft Rock and / or masonary in CM or LM or Lime Concrete. 110.00 205.85
3.2.4 In Hard Rock and /or or in C.C.1:2:4 only. m³ 146.00 446.20
3.3 Excavation Up To 3.0 Mt To 4.5 Mt Depth
3.3.1 In all Sorts Of Soil and Soft murrum m³ 4.00 112.70
3.3.2 In Hard Murrum, Boulder incl. macadam road m³ 7.00 170.20
SBD SECTION-7 BILL OF QUANTITIES-157
In soft Rock and / or masonary in CM or LM or Lime Concrete. 11.00 205.85
3.3.4 In Hard Rock and /or or in C.C.1:2:4 only. m³ 14.00 446.20
Refilling the pipe line trenches incl. ramming, watering,
consolidating disposal of surplus stuffetc., complete with all lead
and lift as directed within a radius of 3 km Refilling as directed by
the engineer. m³ 4372.00 25.30
RCC Precast M.H. Frame & Cover Manufacture, supply & Delivery
at store or at site of work precast RCC M. 200 Frame & cover
5 suitable to drainage M.H. and as per type design & Drawing
including cost of reinforcement M.S. Angles or Flat, curring mold
work etc. Heavy duty.
5.1 Frame suitable for 50 cm opening of MH No 151.00 1121.00
5.2 Cover suitable for 50 cm opening of MH No 151.00 1173.00
5.3 House Connection Chamber light duty - Frame No 10.00 813.00
5.4 House Connection Chamber light duty - Cover No 10.00 920.00
Providing and constructing Sewer manholes, scraper manholes
and unit house connection chamber, as per the type design in
brick masonry in C. M. 1:5 and inside and outside 20mm thick
plastering in C. M. 1:3 necessary 100 mm coping with
reinforcement in R.C.C. M.200 fixing C. I. steps and fixing
manhole frame and covers (But excluding supply of manhole
6 frame and covers) over manholes and house connection
chambers and fixing Manhole covers (but excluding supplying of
manhole covers) over scraper manhole etc. complete, providing
and fixing safety chain wherever necessary as per the stipulations
in the type design complete as per latest CPHEEO manual.(excl.
Manhole type "A" Circular type having inside diameter of
6.1 mm for depth upto 1.5 m depth (for 150 mm to 500 mm dia
6.1.2 Beyond 1.00m and upto 1.50m depth m 12.46 7622.20
Manhole type 'B' - Circular, having inside diameter of 1500mm for
6.2 depth upto 1.50 to 4.00m (150 to 600mm dia. sewers).
6.2.1 Upto 1.50m depth No 26.00 24283.40
6.2.2 Beyond 1.50m and upto 4.00m depth m 28.97 14159.95
Providing and constructing rectangular brick masonry chamber for
house connection as per type design in brick masonry in C. M. 1:3
including M-100 in foundation M-150 in benching inside plastering
7 in C. M. 1:3 and outside plastering in C. M. 1:3 coping in M200
and fixing RCC precast manhole frame and covers, but Excl.
supply of manhole and cover etc. complete excl. excavation.
SBD SECTION-7 BILL OF QUANTITIES-158
DAHOD MUNICIPALITY, DAHOD
SEWER COLLECTION NETWORK AT DAHOD VARIOUS AREAS PHASE - 2 AT DAHOD. 150 to 300MM DIA.
GENERAL SUMMARY
DESCRIPTION TOTAL AMOUNT
DESCRIPTION TOTAL AMOUNT
SEWER COLLECTION NETWORK AT DAHOD VARIOUS AREAS PHASE - 2 AT DAHOD.
150 to 300MM DIA.
Add GST 18% Rs.
Total Amount With GST Rs.
Total Amount With GST Rs.
Contingency on Project Components @ 2% Rs.
Quality Control at 1% Rs.
Total Project Cost Rs.
SBD SECTION-7 BILL OF QUANTITIES-159
DAHOD MUNICIPALITY, DAHOD
SEWER COLLECTION NETWORK AT DAHOD VARIOUS AREAS PHASE - 2 AT DAHOD. 150 to 300MM DIA.
Total Rate Amount
Sr No Item Description Unit Quantity
(in Rupees) (in Rupees)
Providing and supplying ISI standard RCC pipes (of Sulphate
resisting Cement) in standard lengths of following class and
diameter suitable for either collar joints or rubber ring joints
including all taxes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading, conveyance to
1 departmental stores, stacking etc. complete as per (IS
458/1989). Test pressure 0.7 Kg/sq.cm Note : One collar should
be provided with each full length plain ended RCC pipe, cost
included in rates below. One rubber ring should be supplied with
each full length socketed pipe, cost included in rates below.
(Class NP3 Test Pressure 0.7 kg/sq.cm)
1.1.1 150mm dia.(Horizontal Cast) Rmt 45.00 331.00
1.1.2 200mm dia.(Horizontal Cast) Rmt 2130.00 417.00
1.1.3 250mm dia.(Horizontal Cast) Rmt 55.00 527.00
1.1.4 300mm dia.(Horizontal Cast) Rmt 130.00 755.00
Lowering, laying and jointing R.C.C. pipes in C.M 1:1 1/2 of
following in proper position, grade and alignment as directed by
2 Engineer in charge including conveyence from stores to site
work, labour, giving hydraulic testing as per ISI code etc
2.1 150mm dia. NP-3 Class m 45.00 72.45
2.2 200mm dia. NP-3 Class m 2130.00 101.20
2.3 250mm dia. NP-3 Class m 55.00 111.55
2.4 300mm dia. NP-3 Class m 130.00 136.85
Excavation for pipe line trenches for water supply, sewerage line,
manhole etc. all with shoring and struting if required as per
required gradient and line including safety provisions using site
3 rails and stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and strata as
3.1 Excavation Up To 0.0 Mt To 1.50 Mt Depth
3.1.1 In all Sorts Of Soil and Soft murrum m³ 810.00 102.35
3.1.2 In Hard Murrum, Boulder incl. macadam road m³ 1215.00 155.25
In soft Rock and / or masonary in CM or LM or Lime Concrete.
3.1.4 In Hard Rock and /or or in C.C.1:2:4 only. m³ 1215.00 427.80
3.2 Excavation Up To 1.5 Mt To 3.0 Mt Depth
3.2.1 In all Sorts Of Soil and Soft murrum m³ 37.00 112.70
3.2.2 In Hard Murrum, Boulder incl. macadam road m³ 73.00 170.20
In soft Rock and / or masonary in CM or LM or Lime Concrete. 110.00 205.85
3.2.4 In Hard Rock and /or or in C.C.1:2:4 only. m³ 146.00 446.20
3.3 Excavation Up To 3.0 Mt To 4.5 Mt Depth
3.3.1 In all Sorts Of Soil and Soft murrum m³ 4.00 112.70
3.3.2 In Hard Murrum, Boulder incl. macadam road m³ 7.00 170.20
SBD SECTION-7 BILL OF QUANTITIES-160
In soft Rock and / or masonary in CM or LM or Lime Concrete. 11.00 205.85
3.3.4 In Hard Rock and /or or in C.C.1:2:4 only. m³ 14.00 446.20
Refilling the pipe line trenches incl. ramming, watering,
consolidating disposal of surplus stuffetc., complete with all lead
4 and lift as directed within a radius of 3 km Refilling as directed
by the engineer. m³ 4372.00 25.30
RCC Precast M.H. Frame & Cover Manufacture, supply & Delivery
at store or at site of work precast RCC M. 200 Frame & cover
5 suitable to drainage M.H. and as per type design & Drawing
including cost of reinforcement M.S. Angles or Flat, curring mold
work etc. Heavy duty.
5.1 Frame suitable for 50 cm opening of MH No 151.00 1121.00
5.2 Cover suitable for 50 cm opening of MH No 151.00 1173.00
5.3 House Connection Chamber light duty - Frame No 10.00 813.00
5.4 House Connection Chamber light duty - Cover No 10.00 920.00
Providing and constructing Sewer manholes, scraper manholes
and unit house connection chamber, as per the type design in
brick masonry in C. M. 1:5 and inside and outside 20mm thick
plastering in C. M. 1:3 necessary 100 mm coping with
reinforcement in R.C.C. M.200 fixing C. I. steps and fixing
manhole frame and covers (But excluding supply of manhole
6 frame and covers) over manholes and house connection
chambers and fixing Manhole covers (but excluding supplying of
manhole covers) over scraper manhole etc. complete, providing
and fixing safety chain wherever necessary as per the
stipulations in the type design complete as per latest CPHEEO
manual.(excl. excavation).
Manhole type "A" Circular type having inside diameter of
6.1 mm for depth upto 1.5 m depth (for 150 mm to 500 mm dia
6.1.2 Beyond 1.00m and upto 1.50m depth m 12.46 7622.20
Manhole type 'B' - Circular, having inside diameter of 1500mm
6.2 for depth upto 1.50 to 4.00m (150 to 600mm dia. sewers).
6.2.1 Upto 1.50m depth No 26.00 24283.40
6.2.2 Beyond 1.50m and upto 4.00m depth m 28.97 14159.95
Providing and constructing rectangular brick masonry chamber
for house connection as per type design in brick masonry in C.
M. 1:3 including M-100 in foundation M-150 in benching inside
7 plastering in C. M. 1:3 and outside plastering in C. M. 1:3 coping
in M200 and fixing RCC precast manhole frame and covers, but
Excl. supply of manhole and cover etc. complete excl.
SBD SECTION-7 BILL OF QUANTITIES-161
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
Notes.pdf
SBD.pdf
Others Important 1.pdf
Others Important 2.pdf
Others Important 3.pdf
Others Important 4.pdf
Others Important 5.pdf
Others Important 6.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .