| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L Quoted ₹10.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.1 LRejected-AOC | ₹11.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | LAKSHMANAN P L2 | Prasanth P.K L1 |
|---|---|---|---|---|---|
| 1.00Checkdam | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 72.78 | cum | 219.77 ₹15,994.86 | 209.56 ₹15,251.78 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 14 | hour | 294.77 ₹4,126.78 | 291.87 ₹4,086.18 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 11.82 | cum | 6,767.28 ₹79,989.25 | 6,700.65 ₹79,201.68 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 40.37 | cum | 7,878.9 ₹3,18,055.44 | 7,801.32 ₹3,14,923.69 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.63 | cum | 8,947.62 ₹68,279.29 | 8,859.52 ₹67,607 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 20.8 | cum | 8,499.9 ₹1,76,780.92 | 8,416.21 ₹1,75,040.34 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 650.79 | kilogram | 95.91 ₹62,417.08 | 94.97 ₹61,805.34 |
| 1.01 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts | 95.24 | sqm | 860.36 ₹81,940.69 | 851.89 ₹81,134 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 14.41 | sqm | 293.28 ₹4,225.58 | 290.39 ₹4,183.94 |
Tender Value
₹12.2 L
EMD Value
₹30,385
Closing Date
9 Feb 2026, 10:00 amClosed
Assistant Engineer
Office of the Assistant Engineer,LSGD (LID and EW) Section,Kankol alapadamba GP
Annual Plan-2025-26 Check dam construction at kashipuram for karinkuzhi thodu ,Project No.241/25-26
2026_LSGD_830740_13
69/25-26
Open Tender
Civil Works - Water Works
365 days
Kankol alapadamba GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹30,385
Yes
20 Jun 2026
31 Jan 2026
10 Feb 2026
31 Jan 2026
9 Feb 2026
31 Jan 2026
Checkdam
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD440232/2025-2026:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete(Same as item no.60.8)
OD440236/2025-2026:Dry rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) (Modified 60.7.1)
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1399422.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1399422.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 0.95 MB
FT.pdf
Other Document • 0.25 MB
PA.pdf
Other Document • 0.26 MB
AFF.pdf
Other Document • 0.24 MB
EP.pdf
Other Document • 0.23 MB
INTE.pdf
Other Document • 0.23 MB
Download all tender documents and submit your bid