| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 LAdmitted-Finance | ₹2.8 L | L2 | Admitted-Finance |
Tender Value
₹1.3 L
EMD Value
₹10,000
Closing Date
13 Jan 2026, 1:00 pmClosed
Deputy Director (Planning and Design), HRBC
ST. GEORGES GATE ROAD (MUNSHI PREM CHAND SARANI) KOLKATA-700 021
Consultancy Services for the Preparation of DPR for the Construction of proposed new 2-Pump Fire Station at DumDum in the district of North 24 parganas.
2025_HRBC_976925_1
HRBC/02/2nd Call/DYDRPLDN/25-26
Open Tender
Miscellaneous Services
90 days
KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
21 Jan 2026
20 Dec 2025
15 Jan 2026
20 Dec 2025
13 Jan 2026
20 Dec 2025
Value of Part A (after application of contractual percentage)
Conducting topographical survey and submission of report
Preparation of DPR complying with the requirements of the scope of Bid detailed in clause 1.2 (iii) through 1.2 (xiv)
Percentage BoQ
BoQ_Ver3.0
NIeT No: HRBC/02/2ndCall/DYDRPLDN/25-26
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Mobilisation Charges of all tools & Plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different Bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of Engineer-in-Charge. (b) Detailed Investigation
Labour for making Bore-Holes of 150mm to 250mm dia. by any standard method to any depth below ground level / bed level in all kinds of soil like clay, silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of collecting Disturbed & Un disturbed soil samples, conducting Standard Penetration Test at suitable intervals etc.) including preparation and submission of bore-log as per IRC : 75 and 78 and Clause 2400 of Specifications for Road & Bridge Works (5th Revision), Published by IRC, and also including hire charges of tools and plants complete as per the direction of Engineer-in-Charge. a) When Casing pipe is used to prevent collapse of bore hole (casing pipe to be finally withdrawn)
(i) Depth 0m to 10m
(ii) Depth greater than 10m and upto 20m
(iii) Depth greater than 20m and upto 30m
Carriage of all Disturbed & Undisturbed Samples from site of work to the Divisional office or elsewhere including loading and unloading as per direction of Engineer-in-Charge. Detailed Investigation.
A. Laboratory Investigation: i) Liquid Limit as per IS 2720 (Part-V)
ii) Plastic Limit as per IS 2720 (Part – V)
iii) Grain size analysis by Sieving as per IS 2720 (Part – IV).
iv) Grain size analysis by Hydrometer Method as per IS 2720 (Part – IV).
v) Determination of Water Content as per IS 2720 (Part – II).
vi) Determination of Specific Gravity as per IS 2720 (Part – III).
vii) Direct Shear Test as per IS 2720 (Part – XIII).
viii) Determination of Unconfined Compression Strength as per IS 2720 (Part – X). a) Undisturbed.
ix) Determination of Sand Content as per IS 2720 (Part – IV).
xvi) Tri-Axial Shear Test. a) Determination of Shear strength Parameters of a specimen tested in Unconsolidated Undrained Tri-axial compression without measurement of pore water pressure as per IS 2720 (Part – XI).
B) Field Investigation: iii) Collection of Samples from the bore hole made as per B-a (b) Disturbed
v) Collection of Undisturbed soil sample from the bore hole to be made by the concerned Division / Party at their cost. (i)0.0m - 10.0m
(iii)20.0m-30.0m
vi) Standard Penetration Tests (S.P.T.) by Split Spoon Sampler in the bore hole as per IS 2131. (i)0.0m - 10.0m
(iii)20.0m-30.0m
Preparation and submission of report in 6 (Six) copies, giving all relevant information data like site plan, Bore log and water table, test results, calculations, discussions, suggestions and recommendations in respect of suitable foundation etc. including determination of silt factor calculation of waterways and complete design of foundation including analysis of Bearing Capacities and settlements in bound and presentable form complete as per direction of Engineer-in-Charge. b) Detailed Investigation
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Form2911.pdf
Tender Documents • 0.42 MB
Tender_Documents.pdf
Tender Documents • 0.59 MB
BOQ_2380146.xls
BOQ • 0.32 MB