| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹11.8 L+₹10,240 (0.88%)Rejected-Finance | L2 | Rejected-Finance BEING NOT L1 | |
| 3 | L3₹13.6 L+₹1.9 L (16.6%)Rejected-Finance C2 PAIXOMONTIRO APTS BEHIND NSD ALTO DABOLIM VASCO DA GAMA GOA 403 801 | SOUTH GOA | GOA | 403801 | L3 | Rejected-Finance BEING NOT L1 | |
| 4 | L4₹16.7 L+₹5.0 L (42.5%)Rejected-Finance | L4 | Rejected-Finance BEING NOT L1 | |
| 5 | Rejected-Technical | - | Rejected-Technical Not Fulfill NIT criteria |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
30 Oct 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer (I) (CG) Goa
Garrison Engineer (I) (CG) Goa HQ Coast Guard DHQ-11 Chicolna PO- Bogmalo Goa 403806
REPAIRS TO SEWAGE LINES AND SEPTIC TANK AT NON TECH AREA AND TECH AREA GOA. UNDER GE (I) (CG) GOA
2023_MES_618486_1
8396/GOA/E8
Open Tender
Miscellaneous Services
Item Rate
180 days
NON TECH AND TECH AREA GOA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Garrison Engineer (I) (CG) Goa
₹28,000
Yes
26 Dec 2023
13 Sept 2023
6 Nov 2023
13 Sept 2023
30 Oct 2023
28 Sept 2023
13 Sept 2023 - 20 Sept 2023
Amount
[ REPAIRS TO SEWAGE LINES AND SEPTIC TANK AT NON TECH AREA(SCH A PART-I) & REPAIRS TO SEWAGE LINES AND SEPTIC TANKS AT TECH AREA( SCH A PART-II) Cleaning of blocked sewage line of 100 mm dia by rodding from one Manhole to next Manhole and washing through in fresh water including removing all sludge from the sewage line and man hole including removing existing Manhole cover and refixing properly after cleaning and removing all sludge outside MD land complete all as specified and directed. [Total Quantity =500.00 RM (Sch A Part-I)]
All as per item no 1.00 but for sewage line of 150mm dia complete all as specified and directed. [Total Quantity = 1500.00(SCH A PART-I) + 200.00(SCH A PART-II) = 1700.00 RM]
All as per item no 1.00 but for sewage line of 200 mm dia complete all as specified and directed. [Total Quantity = 100.00(SCH A PART-I) + 400.00(SCH A PART-II) = 500.00 RM]
Cleaning of Manhole of any description of size n. exc 1.5M in depth including lifting up and removing sludge and accumulated/ semi solid sludge and other foreign material with trailor mounted sewage cleaning pumps/mechanical devices and removing to a distange n. exc 250 m where directed by Engineer in charge & washing down with water for smooth function of sewage complete all as specified and directed. [Total Quantity = 150.00(SCH A PART-I) + 30.00(SCH A PART-II) = 180.00 EACH]
De sludging and cleaning of septic tanks, with inside depth exceeding 1.5m, by mechanical means and cleaning of concentrated sludge including de-watering and cleaning , removing silt, sludge, sludge water and any other foreign materials and deposited outside of MOD land and sprinking bleaching powder over surrounding area complete all as specified and directed. (Measurement shall be made for sludge incl. the sludge water). [Total Quantity =1250.00 CUM (Sch A Part-I)]
De sludging and cleaning of septic tanks, with inside depth not exceeding 1.5m, by mechanical means and cleaning of concentrated sludge including de-watering and cleaning , removing silt, sludge, sludge water and any other foreign materials and deposited outside of MOD land and sprinking bleaching powder over surrounding area complete all as specified and directed. (Measurement shall be made for sludge incl. the sludge water). [Total Quantity =150.00 CUM (Sch A Part-I)]
Removal of blockage from WC by using rubber cup 125mm dia with wooden handle and clearing the blockage upto manhole with cleaning rod including removal of all materials from P trap of WC and removal of blockage from kitchen/bathroom /WHB by using rubber cup 125mm dia and clearing the blockage upto gully traps with cleaning rod including removal of all materials from floor trap including dismantling and refixing of gratings. (qtrs from ground floor to 3rd floor) complete all as specified and directed. [Total Quantity = 150.00(SCH A PART-I) + 10.00(SCH A PART-II) = 160.00 EACH]
Removal of blockage from kitchen/bathroom /WHB by using rubber cup 125mm dia and clearing the blockage upto gully traps with cleaning rod including removal of all materials from floor trap including dismantling and refixing of gratings complete all as specified and as directed. [Total Quantity =150.00 Each (Sch A Part-I)]
M & L Precast reinforced cement concrete 1:2:4 type B1 using 20 mm graded stone aggregate for cover slab for Man holes/Septic tank/ drain set in cement mortar 1:4 complete including demolition of old broken unserviceable slab for Manhole/Septic tank/Drain, other concrete and removing the debris to a distance not exc 100 M complete all as specified and directed. [Note: Reinforcement shall be measured and paid seperately] [Total Quantity = 5.00(SCH A PART-I) + 7.00(SCH A PART-II) = 12.00 CUM]
M & L Mild steel bars 10mm dia and over, cut tolength, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wore annealed n less than 0.9 mm. Complete all as specifed and directed. [Total Quantity = 500.00(SCH A PART-I) + 400.00(SCH A PART-II) = 900.00 KG]
M & L 8mm dia TMT bar cut to length, bend to shape required incl cranking bending & hooking ends & binding with MS wire annealed n. less 0.9mm dia complete all as specified and directed. [Total Quantity = 100.00(SCH A PART-I) + 110.00(SCH A PART-II) = 210.00 KG]
M & L Pre - cast cement concrete 1:3:6 type C-1, (20mm graded stone aggregate) block masonary with solid blocks built in cement mortar 1:6 including demolition of old broken unservicible wall complete all as specified and directed. [Total Quantity = 3.00(SCH A PART-I) + 7.00(SCH A PART-II) = 10.00 CUM]
M & L rendering 15mm thick in cement mortar 1:4 on laterite brick /Pcc block masonry and concrete wall surfaces and finished even and smooth without using extra cement complete all as specified and directed. [Total Quantity = 70.00(SCH A PART-I) + 90.00(SCH A PART-II) = 160.00 SQM]
Excavation in trenches, not exc 1.5M wide and not exc 1.5M in depth, for foundation etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 Sqm on plan and n exc 1.5m in depth and getting out in soft/disintegrated rock and gettting out complete all as specified and directed. [Total Quantity = 5.00(SCH A PART-I) + 3.00(SCH A PART-II) = 8.00 CUM]
All as per item no 14.00 but exc. 1.5m wide and n. exc. 3.0 m in depth for foundation in disintigrated rock and getting out complete all as specified and directed. [Total Quantity = 3.00 (SCH A PART-I) + 2.00(SCH A PART-II) = 5.00 CUM]
Demolition and breaking up drain pipes, 200mm dia (Sail glazed stone ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed. [Total Quantity = 20.00(SCH A PART-I) + 30.00(SCH A PART-II) = 50.00 RM]
Demolition and breaking up drain pipes, 150mm dia (Salt glazed stone ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed. [Total Quantity = 20.00(SCH A PART-I) + 30.00(SCH A PART-II) = 50.00 RM]
Demolition and breaking up drain pipes, 100mm dia (Salt glazed stone ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed. [Total Quantity =20.00 RM (Sch A Part-I)]
M & L Plain cement Concrete bed to drain pipe 200mm dia incl. packing under and haunching against the sides of pipe Plain cement concrete 1:4:8 type D2 (using 40mm graded stone aggregates) including demolition of old cement concrete (unreinforced) complete all as specified and directed. [Total Quantity = 20.00(SCH A PART-I) + 30.00(SCH A PART-II) = 50.00 RM]
All as per item no 19.00 but 150mm dia complete all as specified and directed. [Total Quantity = 20.00(SCH A PART-I) + 30.00(SCH A PART-II) = 50.00 RM]
All as per item no 19.00 but 100mm dia complete all as specified and directed. [Total Quantity =20.00 RM (Sch A Part-I)]
M & L Reinforced concrete pipes, Class NP2, laid and jointed complete with collars 200mm laid in trenches and jointed incl all accessories and fittings complete as specified and directed. [Total Quantity = 20.00(SCH A PART-I) + 30.00(SCH A PART-II) = 50.00 RM]
All as per item No 22.00 above but 150mm dia complete all as specified and directed. [Total Quantity = 20.00(SCH A PART-I) + 30.00(SCH A PART-II) = 50.00 RM]
All as per item No 22.00 above but 100mm dia complete all as specified and directed. [Total Quantity =20.00 RM (Sch A Part-I)]
M & L Sail glazed stoneware drain pipe grade 'A' of 200mm internal dia laid in trenches and jointed including all accessories & fittings including demolition of old unserviceable one complete all as specified and directed. [Total Quantity = 20.00(SCH A PART-I) + 25.00(SCH A PART-II) = 45.00 RM]
All as per item no 24.00 but 150mm internal dia complete all as specified and directed. [Total Quantity = 20.00(SCH A PART-I) + 25.00(SCH A PART-II) = 45.00 RM]
Returning filling in including spreading, levelling , watering and well ramming n exc. 25 cm in layers (Soil) complete all as specified and directed. [Total Quantity = 5.00(SCH A PART-I) + 2.00(SCH A PART-II) = 7.00 CUM]
Removal of excavated surplus (soils) at a distance exc. 1.5 Km but n. exc 5.0 Km complete all as specified and directed. [Total Quantity = 5.00(SCH A PART-I) + 3.00(SCH A PART-II) = 8.00 CUM]
Dismantling cast iron drain pipes 100mm, jointed in cement mortar obtained either from walls as required complete all as specified and directed. [Total Quantity = 15.00 RM (Sch A Part-I)]
Dismantling cast iron drain pipes 75mm, jointed in cement mortar obtained either from walls as required complete all as specified and directed. [Total Quantity = 15.00 RM (Sch A Part-I)]
S & F 100mm bore cast iron (Sand cast pipes) soil, waste and vent pipes in any length with or without ears, with cement joints, fixed to wall with MS clamp complete all as specified and directed. [Total Quantity =15.00 RM (Sch A Part-I)]
S & F 100mm bore cast iron bends (any radius), diminishing pieces or tapers (larger bore measured) complete all as specified and directed [Total Quantity =5.00 EACH (Sch A Part-I)]
S & F 100mm bore cast iron branch pieces, single (equal or unequal), ordinary or inverted (spigot or socket type) or with parallel branches complete all as specified and directed. [Total Quantity =5.00 EACH (Sch A Part-I)]
S & F 100mm bore cast iron cowls complete all as specified and directed. [Total Quantity = 2.00 EACH (Sch A Part-I)]
S & F 75mm bore cast iron (Sand cast pipes) soil, waste and vent pipes in any length with or without ears, with cement joints, fixed to wall with MS clamp complete all as specified and directed. [Total Quantity =15.00 RM (Sch A Part-I)]
S & F 75mm bore cast iron bends (any radius), diminishing pieces or tapers (larger bore measured) complete all as specified and directed [Total Quantity = 2.00 EACH (Sch A Part-I)]
S & F in repairs 75mm bore PVC (SWR) pipe single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed. [Total Quantity = 50.00(SCH A PART-I) + 50.00(SCH A PART-II) = 100.00 RM]
S & F in repairs 110 mm bore PVC (SWR) pipe single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed [Total Quantity = 50.00(SCH A PART-I) + 50.00(SCH A PART-II) = 100.00 RM]
S & F PVC (SWR) Vent cowl 110mm bore in repair complete all as specified and directed [Total Quantity = 2.00(SCH A PART-I) + 2.00(SCH A PART-II) = 4.00 EACH]
S & F PVC (SWR) gully trap 125/110mm, setting and jointing with solvent cement in repair complete all as specified and directed [Total Quantity = 5.00(SCH A PART-I) + 3.00(SCH A PART-II) = 8.00 EACH]
M & L PVC (SWR) bends any radious 110mm bore with access door complete all as specified and directed [Total Quantity = 5.00(SCH A PART-I) + 5.00(SCH A PART-II) = 10.00 EACH]
M & L PVC (SWR) bends any radious 75mm bore with access door complete all as specified and directed [Total Quantity = 3.00(SCH A PART-I) + 5.00(SCH A PART-II) = 8.00 EACH]
M & L PVC (SWR) branch piece, single (Single Y) equal or unequal, 110mm bore with access door complete all as specified and directed [Total Quantity = 5.00(SCH A PART-I) + 3.00(SCH A PART-II) = 8.00 EACH]
M & L PVC (SWR) branch piece, single (Single Y) equal or unequal, 75mm bore with access door complete all as specified and directed [Total Quantity = 5.00(SCH A PART-I) + 3.00(SCH A PART-II) = 8.00 EACH]
[Note for all BOQ Items 1.00 to 44.00) Contractor shall strictly follow the " Prohibition of Employment of Manual Scavengers and their Rehabilation Act, 2013" which refers prohibits engagement or employment of any person for hazardous cleaning of sewers and septic tanks by employing manual handling of excreta in the process of their cleaning. Necessary by pass arrangement to be made in case of time consuming repairs, till the sewer line is repaired & wherever handling of human excreta can be involved necessary appropriate technological appliances(Sewage Suction Truck) will be complied with the subject Act.
M/s RAJ CONSTRUCTION
M/S P S BABU
Paulraj Painters And Civil Engineering Contractors
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .