Tender Value
₹40.3 L
EMD Value
₹40,260
Closing Date
24 Apr 2026, 5:00 pmClosed
Chief Officer,Sachin Notified Area
ARC (Annual Rate Contract) of Repairing and Maintenance of Different Types of Civil work at Notified Area GIDC, Sachin Estate 2026-27
295270
01 of 2026-27(Serial No. 4)
Open
Civil Works - Others
Works
Surat
12 documents required · 12 mandatory
₹1,770
Chief Officer, Sachin Notified Area
₹40,260
10 Apr 2026
10 Apr 2026
10 Apr 2026
24 Apr 2026
10 Apr 2026
Name of work :- ARC (Annual Rate Contract) of Repairing and Maintenance of Different Types of
Civil work at Notified Area GIDC, Sachin Estate 2026-27.
Sr.no Description Qty Rate Unit
Excavation for foundation upto 1.5 mt depth including sorting
1 out and stacking of useful materials and disposing off the 600.00 122.94 Cu.mt
excavated stuff with in the estate
Providing and laying controlled cement concrete M.200 and
2 curing complete including the cost of formwork and 208.00 4055.89 Cu.mt
reinforcement for reinforced concrete work
Providing 15mm thick cement plaster in single coat on Rough
(Similar)side of single or half brick walls for interior plastering
upto floor two level and finished even and smooth in (iii)
Cement mortar 1:6 (1-cement:6-sand)
Brick work using common burnt clay building bricks having
crushing strength not less than 35 kg./Sq.Cm. in foundation
and plinth in Cement Mortar 1:6 (1- Cement : 6 -fine sand)(B)
Conventional (upto 10 ton)
Providing TMT Bar FE 500D reinforcement for R.C.C. work
5 including bending, binding and placing in position complete 5824.00 77.29 Kg.
upto floor two level
Providing and supplying ISI Standard R.C.C. pipes NP3 pipe
(of Sulphate Resisting Cement) horizontal casted in standard
lengths of following class and diameter suitable for either
collar joints or rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection charges,
loading, unloading, conveyance to departmental stores,
6 stacking etc.te. One collar should be supplied with each full
length plain ended RCC pipe, cost included in rates below.
One rubber ring should be supplied with each full length
socketed pipe, cost included in rates below.
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of
following diameters in
proper position, grade and alignment at all level as directed by
Engineer-in-charge including conveyance from stores to site of
7 work, labour, giving hydraulic testing as per
Providing and fixing 1.20 Metre high fencing with 2.0 Metre
long M.S. Angle posts 40mm x 40 mm x6 mm and oil painting
3 coats fixed at 2.5 Mt,C/c.with five Horizontal lines and two
8 diagonals of galvanised steel barbed wire weighting 9.38 Kg. 500.00 391.93 Cumt
per 100 Metre, strained and fixed to posts with G.I,staples
including fixing the postsin ground with 0.5 M x 0.5.M x
M. block in C.C1:5:10 etc complete.
Informatory Signs :-Providing and fixing sing boards made out
of 2mm aluminum sheet; size 80 x 60cms. rectangle as per the
design of IRC-67-1977 pre treated with phosphating process
& acid teaching; coated with one coat of epoxy primer and two
coats of best quality epoxy paint; reflectorized with retro
reflective sheeting as per latest M.O.S.T. Specifications; 3.1m
long stand post and frame fabricated from suitable size iron
9 angle of 35 x 35 x 3mm75x75x6mm as required; painted with 30.00 3856.90 Nos
best quality epoxy coatings in black and white bends. the
details of symbol for each board shall details of symbol for
each board shall be as per the instruction of engineer in charge.
The fixing at site shall be in 1:2:4 CC block of size 45 x45 x
60cms. for each leg. including excavation curing tec. complete
under the supervision of engineer in charge.(A) Engineer
Providing and fixing of Drain lid cover of size of 1000 mm (
T-25 ) as instructed by Engineer in charge
I / We agree to carry out the above work at ____________ % above the estimated rate ((In Words)
_________________________________________________) percentage above the Estimated Tender Rate.
I / We agree to carry out the above work at ____________ % below the estimated rate ((In Words)
_________________________________________________) percentage below the Estimated Tender Rate.
Estimated Amount Estimated Amount
Put to Tender Rs. 40,26,729.71 Put to Tender Rs
Add % Above Rs. _____________ Deduct % Below Rs______________
Net Amount Rs.____________ Net Amount Rs._______________
Net In Figure Rs. _____________ Net in Figure Rs______________
I / We have read the Condition mentioned in this tender and agree to abide by the same.
Note: The Unit rates specified for various items to be executed as per Schedule "B" attached with the Price Bid
are excluding GST but inclusive all labors, materials, testing charges, equipment’s, all incidental charges
involving in the work and as specified in the Mode of measurement & payment of detailed specifications
of items incl. all taxes, royalty, octroi transportation cost etc. all as applicable presently as to be
enforced for future by any / all including Central/State Government & Statutory bodies from time to time
Signature of Contractor with Seal Sachin Notified Area,
G.I.D.C.-SACHIN
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document.pdf
Schedule-B.pdf
B1 Agreement.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .