Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59,898.48Accepted-AOC | ₹59,898.48 | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | HABEEBASSOSIATES L1 | MUHAMMEDALI L2 |
|---|---|---|---|---|---|
| 1.00GATE CONSTRUCTION | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.16 | cum | 330 ₹52.8 | 314 ₹50.24 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.03 | cum | 7,000 ₹224 | 6,922 ₹221.5 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 0.96 | sqm | 350 ₹336 | 337 ₹323.52 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.2 | cum | 9,600 ₹1,920 | 9,153 ₹1,830.6 |
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 230.29 | kg | 200 ₹46,057.6 | 201.6 ₹46,426.06 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 31.83 | kg | 160 ₹5,093.28 | 155 ₹4,934.12 |
| 1.01 | 13.71:Lettering with black Japan pint of approved brand and manufacture | 600 | per Letter per cm height | 6 ₹3,600 | 5.53 ₹3,318 |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 21.79 | sqm | 120 ₹2,614.8 | 143 ₹3,115.97 |
Tender Value
₹63,411
EMD Value
₹1,585
Closing Date
4 Mar 2026, 11:30 amClosed
AE
AE
Annual Plan-VAZHAKKAD GP PRO NO 483/25-26-BUDS SCHOOL GATE CONSTRUCTION IN WARD 16-General Civil Work
2026_LSGD_840221_8
08/1/ETEN/AE/LIDEW/VKD/2025-26
Open Tender
Civil Works - Others
VAZHAKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,585
Yes
19 May 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
25 Feb 2026 - 4 Mar 2026
GATE CONSTRUCTION
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.71:Lettering with black Japan pint of approved brand and manufacture
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1416413.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.02 MB
Tendernotice_4.pdf
PDF • 0.03 MB
Tendernotice_5.pdf
PDF • 0.02 MB
Tendernotice_6.pdf
PDF • 0.03 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 2.27 MB
BOQ_1416413.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid