| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-AOC | ₹18.0 L | L1 | Accepted-AOC L1 EXECUTED AGREEMENT |
| 2 | L2₹20.5 LRejected-AOC | ₹20.5 L | L2 | Rejected-AOC L1 EXECUTED AGREEMENT |
| 3 | L3₹20.7 LRejected-AOC | ₹20.7 L | L3 | Rejected-AOC L1 EXECUTED AGREEMENT |
| 4 | Rejected-Technical 676502 | MALAPPURAM | KERALA | 676502 | - | - | Rejected-Technical for execution of agreement |
| Sl No | Description | Qty | Unit | P.P Mohammed Haneefa L4 | VISHNU BABU L2 | P V MOHAMMED SALEEM L3 | sujeev v p L1 |
|---|---|---|---|---|---|---|---|
| 1.00Road | |||||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 21 | cum | 500 ₹10,500 | 400 ₹8,400 | 454 ₹9,534 | 346.71 ₹7,280.91 |
| 1.00 | OD4012/2025-2026:Filling up low-lying and waterlogged areas with local material such as Quarry Muck / local available material, including loading, transportation, unloading, spreading in uniform layers not exceeding 250 mm thickness, levelling, watering if required, and compacting using appropriate mechanical means (rammer/plate compactor/roller), to achieve required CBR improvement in subgrade as directed by the departmental officers. Rate inclusive of cost and conveyance of all materials, labour, tools, equipment, hire charges, and all incidental charges, etc., complete. (Based on the item No. 3.3) | 75 | cum | 1,150 ₹86,250 | 1,100 ₹82,500 | 1,135 ₹85,125 | 1,001.54 ₹75,115.50 |
| 1.00 | OD3976/2025-2026:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers on the prepared surface and compacting with smooth wheel roller to achieve the desired density, complete as per clause 401 - Plant Mix Method (Based on spec 4.1.A1) | 92 | cum | 3,000 ₹2.8 L | 2,700 ₹2.5 L | 2,891 ₹2.7 L | 2,515.29 ₹2.3 L |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 | 61 | cum | 8,200 ₹5.0 L | 8,000 ₹4.9 L | 8,127 ₹5.0 L | 7,069.14 ₹4.3 L |
| 1.00 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) | 12 | cum | 8,600 ₹1.0 L | 8,350 ₹1.0 L | 8,590 ₹1.0 L | 7,472.04 ₹89,664.48 |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20 | 99 | cum | 9,000 ₹8.9 L | 9,000 ₹8.9 L | 8,927 ₹8.8 L | 7,764 ₹7.7 L |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 2.5 | tonne | 90,685 ₹2.3 L | 92,000 ₹2.3 L | 90,685 ₹2.3 L | 78,876.76 ₹2.0 L |
Tender Value
₹21.1 L
EMD Value
₹50,000
Closing Date
13 Oct 2025, 6:00 pmClosed
Executive engineer,HED malappuram
OFFICE OF THE EXECUTIVE ENGINEER HED MALAPPURAM PONNANI,
PCC RCC
2025_HED_803070_1
HED/CEHED/TR/305/2024_5_1_1/1
Open Tender
Civil Works - Roads
180 days
PURATHUR
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
23 Dec 2025
27 Sept 2025
15 Oct 2025
29 Sept 2025
13 Oct 2025
29 Sept 2025
27 Sept 2025 - 29 Sept 2025
Amount
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
OD4012/2025-2026:Filling up low-lying and waterlogged areas with local material such as Quarry Muck / local available material, including loading, transportation, unloading, spreading in uniform layers not exceeding 250 mm thickness, levelling, watering if required, and compacting using appropriate mechanical means (rammer/plate compactor/roller), to achieve required CBR improvement in subgrade as directed by the departmental officers. Rate inclusive of cost and conveyance of all materials, labour, tools, equipment, hire charges, and all incidental charges, etc., complete. (Based on the item No. 3.3)
OD3976/2025-2026:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers on the prepared surface and compacting with smooth wheel roller to achieve the desired density, complete as per clause 401 - Plant Mix Method (Based on spec 4.1.A1)
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
VISHNU BABU (BID ID -2386987)
P V MOHAMMED SALEEM (BID ID -2385969)
P.P Mohammed Haneefa (BID ID -2386082)
Bidder Name
P.P Mohammed Haneefa
VISHNU BABU
P V MOHAMMED SALEEM
sujeev v p
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1335014.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid