Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹1.1 Cr+₹1.1 L (1.02%)Rejected-Finance CAMP AT GORUBANDHA MISSAMARI ASSAM 784506 | SONITPUR | ASSAM | 784506 | ₹1.1 Cr+₹1.1 L (1.02%) | L2 | Rejected-Finance HIGH BID VALUE |
| 3 | L3₹1.2 Cr+₹3.5 L (3.11%)Rejected-Finance 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | ₹1.2 Cr+₹3.5 L (3.11%) | L3 | Rejected-Finance HIGH BID VALUE |
| 4 | L4₹1.2 Cr+₹4.8 L (4.29%)Rejected-Finance VILL LAKHOPARA P O GARUBANDHA MISSAMARI DISTT SONITPUR ASSAM PIN 784506 | SONITPUR | ASSAM | 784506 | ₹1.2 Cr+₹4.8 L (4.29%) | L4 | Rejected-Finance HIGH BID VALUE |
| 5 | L5₹1.2 Cr+₹9.8 L (8.80%)Rejected-Finance | ₹1.2 Cr+₹9.8 L (8.80%) | L5 | Rejected-Finance HIGH BID VALUE |
| Sl No | Description | Qty | Unit | Markson L9 | M/S JALALUDDIN AHMED L7 | M/S L R ENTERPRISE L4 | M/S Krishna Construction Co. L3 | M/S YAIPHABA ENTERPRISES L6 | M/S SEWA AND SERVE BUILDERS L10 | M/s DEBAJIT BORTHAKUR L1 | M.P.SUPPLY L2 | M/S RUSTAM ALI L8 | SNEH CORPORATION L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L Brick Work with Sub-Class ‘B’ Bricks (with Old Size Bricks), Straight or Curved on Plan exc. 6.0 Metre mean Radius, built in Cement Mortar 1:6, and including demolition of brick work or stone masonry built in cement mortar incl all quoins arches pillars etc. complete all as specified and as directed. | 75.21 | Cum | 7,100 ₹5,33,991 | 7,500 ₹5,64,075 | 7,800 ₹5,86,638 | 7,500 ₹5,64,075 | 8,500 ₹6,39,285 | 9,999 ₹7,52,024.79 | 7,500 ₹5,64,075 | 6,600 ₹4,96,386 | 4,300 ₹3,23,403 Lowest | 7,800 ₹5,86,638 |
| 2.00 | M & L for PCC 1:2:4 type B-1 using 20mm graded aggreagte as in coping bed block etc complete all as specified and directed | 6.01 | Cum | 6,500 ₹39,065 | 5,500 ₹33,055 | 7,500 ₹45,075 | 5,900 ₹35,459 | 6,000 ₹36,060 | 12,000 ₹72,120 | 6,800 ₹40,868 | 7,000 ₹42,070 | 2,600 ₹15,626 Lowest | 6,600 ₹39,666 |
| 3.00 | M&L PCC in surface channels,benching in sewers,drains etc type B1 (1:2:4) using 20 mm graded stone aggregate | 4.5 | Cum | 7,000 ₹31,500 | 6,500 ₹29,250 | 6,500 ₹29,250 | 5,900 ₹26,550 | 460 ₹2,070 Lowest | 9,500 ₹42,750 | 8,000 ₹36,000 | 6,000 ₹27,000 | 2,700 ₹12,150 | 7,200 ₹32,400 |
| 4.00 | M & L for redndering in cement mortar (1:4) 15mm thick on concrete /brick masonry wall surfaces, complete as specified and directed. (Note WPC paid separetely) | 250 | Sqm | 260 ₹65,000 | 450 ₹1,12,500 | 310 ₹77,500 | 260 ₹65,000 | 220 ₹55,000 | 450 ₹1,12,500 | 199 ₹49,750 Lowest | 250 ₹62,500 | 750 ₹1,87,500 | 200 ₹50,000 |
| 5.00 | M&L Pre-cast Reinforced Cement Concrete 1:2:4 (20mm graded aggregate) in Cover Slab of Manholes, Septic Tanks, etc., set in Cement Mortar 1:4 including demolition of existing RCC slabs ., complete all as specified and as directed.
NOTE : Reinforcement will be Measured and Paid separately under appropriate Items. | 18 | Cum | 9,950 ₹1,79,100 | 10,500 ₹1,89,000 | 7,800 ₹1,40,400 | 6,000 ₹1,08,000 | 7,000 ₹1,26,000 | 26,500 ₹4,77,000 | 7,900 ₹1,42,200 | 11,000 ₹1,98,000 | 2,700 ₹48,600 Lowest | 7,000 ₹1,26,000 |
| 6.00 | M&L TMT Bars 8-10mm dia and overcut to length, bent to shape required including cranking, bending spirally for hooping for Columns hooking ends and binding with and including mild steel wire (annealed) not less than 0.90mm dia, complete all as specified and as directed. | 1,130.4 | Kg | 118 ₹1,33,387.2 | 110 ₹1,24,344 | 96 ₹1,08,518.4 Lowest | 105 ₹1,18,692 | 130 ₹1,46,952 | 120 ₹1,35,648 | 112 ₹1,26,604.8 | 100 ₹1,13,040 | 180 ₹2,03,472 | 108 ₹1,22,083.2 |
| 7.00 | M&L two coats of cement base paint over a coat of primer on new wall surface including preparation of surface. | 54 | Sqm | 48 ₹2,592 | 145 ₹7,830 | 35 ₹1,890 Lowest | 85 ₹4,590 | 70 ₹3,780 | 90 ₹4,860 | 66 ₹3,564 | 60 ₹3,240 | 380 ₹20,520 | 48 ₹2,592 |
| 8.00 | M&L preparation of old surface of wall and applying one coat of cement base paint | 3,988 | Sqm | 26 ₹1,03,688 Lowest | 130 ₹5,18,440 | 29 ₹1,15,652 | 33 ₹1,31,604 | 32 ₹1,27,616 | 78 ₹3,11,064 | 49 ₹1,95,412 | 40 ₹1,59,520 | 300 ₹11,96,400 | 29 ₹1,15,652 |
| 9.00 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion & making good disturbed ground embedded in Concrete, brick work, masonry, etc. | 724.5 | Rm | 10 ₹7,245 | 50 ₹36,225 | 12 ₹8,694 | 7 ₹5,071.5 Lowest | 15 ₹10,867.5 | 150 ₹1,08,675 | 55 ₹39,847.5 | 20 ₹14,490 | 250 ₹1,81,125 | 15 ₹10,867.5 |
| 10.00 | Excavating in post holes (or similar holes) each n exc 0.5 cu. m, getting out, returning, filling in & raming earth/ broken rubble mixed with earth around, in layers n. exc. 25cm, watering, & removing surplus soil to a distance n exc 50m & making good surface in soft/loose soil. | 345 | Each | 140 ₹48,300 | 300 ₹1,03,500 | 52 ₹17,940 Lowest | 105 ₹36,225 | 150 ₹51,750 | 350 ₹1,20,750 | 133 ₹45,885 | 150 ₹51,750 | 1,900 ₹6,55,500 | 65 ₹22,425 |
Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
24 Sept 2025, 6:00 pmClosed
SHRI SAURABH, IDSE, CWE
HQ CWE TENGA PIN - 900194 C/O 99 APO
REPAIR TO PATH HARD STANDING, PAVER BLOCKS, CHEQUERED TILES, PLASTER, BRICK WORK, FENCING AND PERIODICAL SERVICES TO BOUNDARY WALL AT NORTH OF RLY LINE AT
2025_MES_727160_1
8565/E8
Open Tender
Civil Works
Item Rate
270 days
GE MISSAMARI
B a (i)
8 documents required · 8 mandatory
₹1,000
Yes
GE MISSAMARI
₹2.2 L
Yes
21 Nov 2025
22 Aug 2025
1 Oct 2025
22 Aug 2025
24 Sept 2025
12 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .