Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically qualified |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
18 May 2026, 3:00 pmClosed
Executive Engineer EDD Kargil
Baroo Kargil
Repair/re-building of partially/fully damaged distribution transformers on contract basis for the financial year 2026-27.
2026_PDNRE_18926_1
E-NIT NO 14 OF 2026-27
Open Tender
Electrical Works
Works
7 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
Account No 0096010200000064 IFSC Code JAKA0KARGIL)
₹1 L
20 May 2026
11 May 2026
18 May 2026
11 May 2026
18 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair/Re-building of Partially/fully damaged Distribution transformers for the Year 2024-25. | |||||
| 1.01 | Replacement of HT Coils made out of super enamelled Aluminium winding wires of same guage and same no of turns as requuired as per transformer of any capacity including replacement of paper insulation ,insulating meterial and proper end connection .The rewinding coil shall be heat treated in an electric oven completely . Aluminium/Copper wire shall be as per ISI Standrad. | 1 | Kg | - | - |
| 1.02 | Replacement of LT Coils made out of super enamelled Aluminium winding wires of same guage and same no of turns as required as per transformer of any capacity including replacement of paper insulation ,insulating meterial and proper end connection .The rewinding coil shall be heat treated in an electric oven completely . Aluminium/Copper wire shall be as per ISI Standrad. | 1 | Kg | - | - |
| 1.03 | Painting of Transformer of any capacity indoor/outdor type after cleaning the outer surface of the transformer by rubbing with emery paper ,remove oil particles, dust etc and applying one coat of synthetic enamel paint of smoke gray colour as directed. | 1 | Each | - | - |
| 1.04 | Replacement of HT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity of 25 to 63KVA. | 1 | Each | - | - |
| 1.05 | Replacement of HT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity from100 KVA. To 250 KVA | 1 | Each | - | - |
| 1.06 | Replacement of HT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity above 250 KVA. To 400 KVA | 1 | Each | - | - |
| 1.07 | Replacement of HT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity above 400 KVA. To 630 KVA | 1 | Each | - | - |
| 1.08 | Replacement of LT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity of 25 to 63KVA. | 1 | Each | - | - |
| 1.09 | Replacement of LT Bushing complete with brass spindle with nut bolt,washer ,ceramic bushing and rubber washer for Transformer capacity from 100 KVA. To 250 KVA | 1 | Each | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
sbd.pdf
Tender Documents • 0.38 MB
BOQ_45212.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .