Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.0 L+₹22,854.43 (6.10%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.1 L+₹34,410.04 (9.18%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.1 L
EMD Value
₹10,272
Closing Date
2 Sept 2026, 4:00 pmClosed
Executive Engineer Hydraulic Division Uri
Hydraulic Division Uri
Construction of FP work by way of providing of Cement Concrete R/wall on Syed Pora Nallah near Land of Mohammad Shareef and Others.
2026_IFC_322123_1
eNIT No 10/Hyd/Uri of 2026-27
Open Tender
Civil Works
Percentage
25 days
Uri
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer Hydraulic Division Uri
₹10,272
22 Sept 2026
24 Aug 2026
3 Sept 2026
24 Aug 2026
2 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | |||||
| 1.1 | In all kinds of soils | - | Cum | - | - |
| 2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | |||||
| 3 | Providing and laying of stone soling including cost of stone | 1 | Cum | 1 | ₹1 |
| 4Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | |||||
| 5Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 5.1 | Foundations, fottings, bases of clumns etc. for mass concrete | 1 | Sqm | - | - |
| 6CARRIAGE OF MATERIALS by Mechanical Transport including loading, unloading and stacking | |||||
| 6.1 | Cement for an avg lead of 05Kms | - | MT | - | - |
| 6.2 | Sand for an avg lead of 50Kms | - | Cum | 1 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_1077756.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .