Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | -41.01% | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹2.7 L (1.56%)Admitted-Finance R O BOGDANG | -40.09% | ₹1.8 Cr+₹2.7 L (1.56%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹14.8 L (8.48%)Admitted-Finance | -36.01% | ₹1.9 Cr+₹14.8 L (8.48%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹17.7 L (10.2%)Admitted-Finance | -35.00% | ₹1.9 Cr+₹17.7 L (10.2%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹26.3 L (15.1%)Admitted-Finance | -32.11% | ₹2.0 Cr+₹26.3 L (15.1%) | L5 | Admitted-Finance |
Tender Value
₹3.0 Cr
EMD Value
₹5.9 L
Closing Date
5 Feb 2026, 4:00 pmClosed
Xen RnB Division Kargil
Office of the Xen RnB Division Kargil
Construction of Multipurpose Community Hall At Pachikhar Mulbegh (NFB)(Under Capex)
2026_PWD_18327_1
E tender 131 of 2025-26 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Buildings
Percentage
270 days
Kargil
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,900
Xen RnB Division Kargil
₹5.9 L
14 Feb 2026
14 Jan 2026
6 Feb 2026
14 Jan 2026
5 Feb 2026
14 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Plateform Cutting. Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | |||||
| 1.1 | All Kinds of Soil@50% | 1,275 | Cum | 202.78 | ₹2,58,544.5 |
| 1.2 | Ordinary Rock@ 30% | 765 | Cum | 373.49 | ₹2,85,719.85 |
| 1.3 | Hard rock (B.P) 20% | 510 | Cum | 1,065.75 | ₹5,43,532.5 |
| 2Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 2.1 | All Kinds of Soil@60% | 3.38 | Cum | 433.78 | ₹1,466.18 |
| 2.2 | Ordinary Rock@ 40% | 2.25 | Cum | 959.74 | ₹2,159.42 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 grade stone aggregate 40 mm nominal size derived from natural sources) | 157.5 | Cum | 6,243.92 | ₹9,83,417.4 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 300 | Sqm | 617.96 | ₹1,85,388 |
| 5 | Disposal of excavated earth by an average of 1 km by Mt | 2,167.5 | Cum | 164.01 | ₹3,55,491.68 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_44178.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .