Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance 250 SARTHI VIHAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹3.1 L (1.60%)Admitted-Finance 5 A WEST REST CAMP DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹2.0 Cr+₹3.1 L (1.60%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S HimalayanConstruction L1 | doon associates L2 |
|---|---|---|---|---|---|
| 1.001-Tehri- Hindolakhal – Devprayag - Byasghat - Bilkhet Motor Motor Road (Length 5.00) | |||||
| 1.10 | Maintenance of Earthen shoulder: (Filling with fresh selected soil and stripping of excess soil) | 4.5 | Km | 10,000 ₹45,000 Lowest | 11,000 ₹49,500 |
| 1.20 | WBM Grading 3: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means (22.4mm to 53mm Nominal Size) | 52.5 | Cum | 3,175 ₹1,66,687.5 Lowest | 3,210 ₹1,68,525 |
| 1.30 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 22,867.5 | Sqm | 13.5 ₹3,08,711.25 Lowest | 13.75 ₹3,14,428.12 |
| 1.40 | Bituminous Macadam: Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) | 140.25 | Cum | 10,950 ₹15,35,737.5 Lowest | 11,200 ₹15,70,800 |
| 1.50 | Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 10 bitumen | 501.56 | Cum | 12,900 ₹64,70,124 Lowest | 13,000 ₹65,20,280 |
| 1.60 | Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually) Assuming muck causing choking of drain to be 0.45X0.45= 0.2 cum per metre,quantity of earth to be removed for 10 metres = 2 cum | 4.5 | Km | 10,000 ₹45,000 Lowest | 11,000 ₹49,500 |
| 1.70 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 500 | Sqm | 521 ₹2,60,500 Lowest | 535 ₹2,67,500 |
| 1.80 | Cleaning of fully choked scupper and catchpit complete as directed by the Engineer-in-charge. | 7 | Nos | 2,625 ₹18,375 Lowest | 2,825 ₹19,775 |
| 1.90 | Cleaning of partially choked scupper and catchpit complete as directed by the Engineer-in-charge. | 9 | Nos | 1,316 ₹11,844 Lowest | 1,390 ₹12,510 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
11 Apr 2022, 3:00 pmClosed
Superintending Engineer
Office of the 8th Circle, PWD, New Tehri.
Renewal Work By S.D.B.C. in Tehri Hindolakhal Devprayag Byasghat Bilkhet Motor Motor Road (Length 5.00), Kilkileshwar Silkakhal Motor Road (Length 5.00) , Guest House Approach Road (Length 1.00) Under Annual Repair 2022-23
2022_pwd_42577_1
1244/08Cash-Tender-8/2021 Date 25-03-2022
Open Tender
Civil Works - Roads
Item Rate
270 days
Devprayag (Tehri Garhwal)
As per NIT, Technical Bid ad BOQ
2 documents required · 2 mandatory
₹4,720
EE TD PWD Kirtinagar
₹3.3 L
8th Circle, PWD, New Tehri.
29 Apr 2022
29 Mar 2022
11 Apr 2022
29 Mar 2022
11 Apr 2022
29 Mar 2022
4 Apr 2022
Amount
1-Tehri- Hindolakhal – Devprayag - Byasghat - Bilkhet Motor Motor Road (Length 5.00)
WBM Grading 3: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means (22.4mm to 53mm Nominal Size)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam: Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 10 bitumen
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually) Assuming muck causing choking of drain to be 0.45X0.45= 0.2 cum per metre,quantity of earth to be removed for 10 metres = 2 cum
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
Cleaning of fully choked scupper and catchpit complete as directed by the Engineer-in-charge.
Cleaning of partially choked scupper and catchpit complete as directed by the Engineer-in-charge.
2-Guest House Approach Road (Length 1.00)
WBM Grading 3: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means (22.4mm to 53mm Nominal Size)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam: Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 10 bitumen
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually) Assuming muck causing choking of drain to be 0.45X0.45= 0.2 cum per metre,quantity of earth to be removed for 10 metres = 2 cum
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
Cleaning of fully choked scupper and catchpit complete as directed by the Engineer-in-charge.
Cleaning of partially choked scupper and catchpit complete as directed by the Engineer-in-charge.
3- Kilkileshwar - Silkakhal Motor Road (Length 5.00)
WBM Grading 3: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Manual Means (22.4mm to 53mm Nominal Size)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam: Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and laying Semi Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 10 bitumen
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually) Assuming muck causing choking of drain to be 0.45X0.45= 0.2 cum per metre,quantity of earth to be removed for 10 metres = 2 cum
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
doon associates
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
TechnicalBidrenual.pdf
Tender Documents • 30.96 MB
BOQ_50613.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .