| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-Finance | ₹10.1 L | L1 | Accepted-Finance Lowest quoted rates |
| 2 | L2₹10.5 L+₹44,680 (4.43%)Rejected-Finance | ₹10.5 L+₹44,680 (4.43%) | L2 | Rejected-Finance Higher quoted rates |
| 3 | L3₹11.9 L+₹1.8 L (18.2%)Rejected-Finance | ₹11.9 L+₹1.8 L (18.2%) | L3 | Rejected-Finance Higher quoted rates |
| Sl No | Description | Qty | Unit | M.K. CONSTRUCTION L1 | M/S MOHMMED AKHLAK L3 | STONEHILLS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing Nominal cement concrete 1:3:6 or richer mix (including equivalent design mix) manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | 17 | cum | 400 ₹6,800 Lowest | 500 ₹8,500 | 600 ₹10,200 |
| 2.00 | Demolishing brick work In cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 1 | cum | 400 ₹400 | 300 ₹300 Lowest | 500 ₹500 |
| 3.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below. | 4 | each | 300 ₹1,200 | 100 ₹400 Lowest | 300 ₹1,200 |
| 4.00 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer- in-charge. | 308 | sqm | 20 ₹6,160 | 75 ₹23,100 | 15 ₹4,620 Lowest |
| 5.00 | Providing and laying in position excluding cement concrete of level: specified grade 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) the cost of centering and shuttering - All work up to plinth. | 14 | cum | 6,000 ₹84,000 Lowest | 6,200 ₹86,800 | 6,500 ₹91,000 |
| 6.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3 | cum | 6,500 ₹19,500 Lowest | 7,800 ₹23,400 | 7,500 ₹22,500 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 25 | sqm | 400 ₹10,000 | 600 ₹15,000 | 350 ₹8,750 Lowest |
| 8.00 | Steel reinforcement Thermo-Mechanically Treated bars of grade Fe-500D or more for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | 558 | kg | 90 ₹50,220 | 98 ₹54,684 | 85 ₹47,430 Lowest |
| 9.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6(1 cement :6 coarse sand). | 4 | cum | 7,500 ₹30,000 | 6,610 ₹26,440 Lowest | 7,000 ₹28,000 |
| 10.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6(1 cement : 6 coarse sand). | 7 | cum | 7,500 ₹52,500 | 6,650 ₹46,550 Lowest | 7,000 ₹49,000 |
Tender Value
₹14.1 L
EMD Value
₹28,200
Closing Date
23 Jul 2026, 10:00 amClosed
Head ESD
Post Mohkampur Distt Dehradun Pin 248005
The work includes Brick work, plaster, kota stone flooring, false ceiling, aluminum work, internal external painting etc.
2026_CSIR_284295_1
ESD/1/14/2026
Open Tender
Civil Works
Item Rate
120 days
CSIR-IIP Mohkampur
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
Director
₹28,200
28 Jul 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing Nominal cement concrete 1:3:6 or richer mix (including equivalent design mix) manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | 17 | cum | 2,434.25 | ₹41,382.25 |
| 2 | Demolishing brick work In cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 1 | cum | 2,060.2 | ₹2,060.2 |
| 3 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below. | 4 | each | 367.2 | ₹1,468.8 |
| 4 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer- in-charge. | 308 | sqm | 56.35 | ₹17,355.8 |
| 5 | Providing and laying in position excluding cement concrete of level: specified grade 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) the cost of centering and shuttering - All work up to plinth. | 14 | cum | 7,878.5 | ₹1,10,299 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3 | cum | 11,505.5 | ₹34,516.5 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 25 | sqm | 736.4 | ₹18,410 |
| 8 | Steel reinforcement Thermo-Mechanically Treated bars of grade Fe-500D or more for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | 558 | kg | 107.85 | ₹60,180.3 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6(1 cement :6 coarse sand). | 4 | cum | 7,132.25 | ₹28,529 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6(1 cement : 6 coarse sand). | 7 | cum | 9,105.95 | ₹63,741.65 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tender_Document.pdf
Tender Documents • 0.27 MB
BOQ_331828.xls
BOQ • 0.37 MB
Tender_acceptance_letter_latest.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .