| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹3.0 L+₹3,736 (1.26%)Rejected-Finance VILLAGE P O MANSIMBLE TEHSIL PALAMPUR DISTRICT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | 2 | Rejected-Finance L2 | |
| 3 | 3₹3.0 L+₹6,407.80 (2.17%)Rejected-Finance | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Sh. Ashok Kumar Prop. M/S A.K. Guleria Construction L1 | vishal thakur govt contractor L3 | Sanjay Saini L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. ( for pipe and pits) up to all depths and in all kinds of soils such as pick work, pick jumper work, saturated soil including bailing or pumping out of water, blasting in soft/ hard rock, chiseling/wedging out of rock where blasting is prohibited, in all leads and lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring, strutting, planking timbering and dewatering wherever required, stacking usable and unusable materials/ soils separately and after laying, jointing and testing of pipes, returning the usable soils in 15 cm layers by ramming and watering and then disposing of all surplus excavated soil / unusable materials as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per the direction of the Engineer-in-charge | 101.64 | Cum | 400 ₹40,656 Lowest | 420 ₹42,688.8 | 425 ₹43,197 |
| 2.00 | Dismentalled of GMS pipe from trenches (earth work in trenches to be measured and paid for separately). | - | - | - | - | - |
| 2.01 | 80mm dia (MC) Node E-F | 70 | Rmt | 80 ₹5,600 Lowest | 85 ₹5,950 | 82 ₹5,740 |
| 2.02 | 100mm dia Node L-M | 80 | Rmt | 85 ₹6,800 | 85 ₹6,800 | 84 ₹6,720 Lowest |
| 3.00 | Re-laying, Jointing and testing galvanized mild steel tube in trenches of following dia. including tube fittings such as bends, tees, reducers, unions etc. complete and to the entire satisfaction of the Engineer-in-charge (earth work in trenches to be measured and paid for separately). | - | - | - | - | - |
| 3.01 | 80mm dia Node E-F | 65 | Rmt | 80 ₹5,200 Lowest | 90 ₹5,850 | 82 ₹5,330 |
| 3.02 | 100mm dia Node L-M | 75 | Rmt | 85 ₹6,375 | 90 ₹6,750 | 84 ₹6,300 Lowest |
| 4.00 | Laying, Jointing and testing galvanized mild steel tube in trenches of following dia. including tube fittings such as bends, tees, reducers, unions etc. complete and to the entire satisfaction of the Engineer-in-charge (earth work in trenches to be measured and paid for separately). | - | - | - | - | - |
| 4.01 | 80mmdia (Node C-D) | 60 | Rmt | 850 ₹51,000 Lowest | 860 ₹51,600 | 855 ₹51,300 |
| 4.02 | 100mm dia Node H-I,J-K | 108 | Rmt | 1,050 ₹1,13,400 Lowest | 1,050 ₹1,13,400 Lowest | 1,055 ₹1,13,940 |
Tender Value
₹2.5 L
EMD Value
₹4,990
Closing Date
25 Nov 2025, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
Restoration of rain damages of LWSS Jablyana in Tehsil Ghumarwin District Bilaspur (SH Repair / replacement of Rising main 80mm dia and GI pipe 100mmdia at various locations at various RDs)
2025_HPIPH_120063_4
BLP-BLP-0736-NIT No. 9888-9987 Dated 07/11/2025
Open Tender
Civil Works
Item Rate
60 days
Sub Division Kandrour Section Harlog
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
₹4,990
1 Dec 2025
12 Nov 2025
25 Nov 2025
12 Nov 2025
25 Nov 2025
12 Nov 2025
Amount
Excavation in foundation and trenches etc. ( for pipe and pits) up to all depths and in all kinds of soils such as pick work, pick jumper work, saturated soil including bailing or pumping out of water, blasting in soft/ hard rock, chiseling/wedging out of rock where blasting is prohibited, in all leads and lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring, strutting, planking timbering and dewatering wherever required, stacking usable and unusable materials/ soils separately and after laying, jointing and testing of pipes, returning the usable soils in 15 cm layers by ramming and watering and then disposing of all surplus excavated soil / unusable materials as directed within all leads and lifts including restoration of un-metalled surfaces to its original condition and including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per the direction of the Engineer-in-charge
Dismentalled of GMS pipe from trenches (earth work in trenches to be measured and paid for separately).
80mm dia (MC) Node E-F
100mm dia Node L-M
Re-laying, Jointing and testing galvanized mild steel tube in trenches of following dia. including tube fittings such as bends, tees, reducers, unions etc. complete and to the entire satisfaction of the Engineer-in-charge (earth work in trenches to be measured and paid for separately).
80mm dia Node E-F
100mm dia Node L-M
Laying, Jointing and testing galvanized mild steel tube in trenches of following dia. including tube fittings such as bends, tees, reducers, unions etc. complete and to the entire satisfaction of the Engineer-in-charge (earth work in trenches to be measured and paid for separately).
80mmdia (Node C-D)
100mm dia Node H-I,J-K
Providing circumferential butt welded joints by electrical arc welding to the varIous dia GI pipe as per conforming to IS: 3183-2007 (latest upto date amendements of grade and wall thickness as specified below welded in requisite number of weld runs so as to achieve the minimum effective throat thickness of weld conforming to IS: 816-1969 specifications by using welding electrodes of 2.5mm to 6.3mm of Advani Orelon (Adore)-CITOJET/ESAB make, conforming to IS: 814-1991 at site of work complete in all respect, including manual/ mechanical handling of pipe in all leads and lifts and to the entire satisfaction of the Engineer-in-charge.
80mmdia (Node C-D)
100mm dia
Sanjay Saini (BID ID -581393)
vishal thakur govt contractor (BID ID -581770)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
PWD6.pdf
Tender Documents • 0.40 MB
Termsandconditions.pdf
Tender Documents • 0.17 MB
PWD8.pdf
Tender Documents • 1.43 MB
BOQ_175828.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .