Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
19 Jun 2026, 6:00 pm
Dy. Executive Engineer, R&B Sub Division, Patan
Supplying for Roads Material to Various Road Under R&B Sub Division at Patan
311347
18 of 2025-26
Open
Civil Works - Roads
Patan
6 documents required · 6 mandatory
₹900
Patan
₹10,000
4 Jun 2026
4 Jun 2026
4 Jun 2026
19 Jun 2026
4 Jun 2026
Name of Work :- Supplying for Roads Material to Various Road Under R&B Sub Division at Patan
(As per SOR 2024-25 / MR)
Item of Work Unit Qty. Total Rate Rate In Words
1 Supplying of Quarry Spaul on Road Site as
directed. Rupees Six Hundred Fifty Three And
(RA) Cu.mt. 1.00 653.13 Paise Thirteen Only
2 Supplying of Crush Metal 25 to 40mm size
on Road site as directed. Rupees Nine Hundred Thirty Seven
(RA) Cu.mt. 1.00 937.48 And Paise Forty Eight Only
3 Supplying of Crush Metal 45 to 63mm size
on Road site as directed. Rupees Eight Hundred Eighty Four
(RA) Cu.mt. 1.00 884.72 And Paise Seventy Two Only
4 Supplying of Rubble on road site as
directed. Rupees Seven Hundred Twenty Five
(RA) Cu.mt. 1.00 725.34 And Paise Thirty Four Only
5 Supplying of Sand on road site as directed.
(RA) Rupees Five Hundred Nineteen And
Cu.mt. 1.00 519.85 Paise Eighty Five Only
6 Supplying of Murrum on road site as
directed. Rupees Two Hundred Twenty Three
(RA) Cu.mt. 1.00 223.46 And Paise Forty Six Only
7 Supplying of Crushed Stone Kapachi 10 to
20mm size on road site as directed. Rupees Nine Hundred Ninety Three
(RA) Cu.mt. 1.00 993.27 And Paise Twenty Seven Only
8 Supplying of Crushed Stone Grit 6 to
10mm size on road site as directed. Rupees Nine Hundred Ninety Three
(RA) Cu.mt. 1.00 993.26 And Paise Twenty Six Only
9 Supplying of H.B. Metal 25 to 90mm size on
road site as directed. Rupees Seven Hundred Twenty Two
(RA) Cu.mt. 1.00 722.31 And Paise Thirty One Only
10 Supplying of Stone Dust on road site as
directed. Rupees Six Hundred Sixty Seven And
(RA) Cu.mt. 1.00 667.57 Paise Fifty Seven Only
11 Supplying of Cement 43 grade OPC Rupees Two Hundred Eighty Two And
(MR) Bag 1.00 282.80 Paise Eighty Only
12 Supplying of Cement 53 grade OPC Rupees Three Hundred Sixty Three
(MR) Bag 1.00 363.60 And Paise Sixty Only
13 Sperading of Metal 45 to 63mm, 25 to
50mm & 6 to 25mm, 20mm to 90mm Quarry
Spaul Rupees Two Hundred Seventy Four
(SOR 24-25 It.Code 26018B Pg. 190) Cu.mt. 1.00 274.73 And Paise Seventy Three Only
14 Sperading Solling stone (Rubble) Rupees Two Hundred Seventy Four
(SOR 24-25 It.Code 26018C Pg.190) Cu.mt. 1.00 274.73 And Paise Seventy Three Only
15 Sperading Murrum / Sand Rupees One Hundred Sixty Two And
(SOR 24-25 It.Code 26020A Pg. 190) Cu.mt. 1.00 162.22 Paise Twenty Two Only
16 Rolling and watering of soiling including
filling in depression which occu during the
process. with power roller 8 tonne to
tonne Rupees Twenty Two And Paise
(SOR 24-25 It.Code 26021 Pg. 190) Sq.mt. 1.00 22.75 Seventy Five Only
D:\MY Data\Letest Tender Year Rate\Tender - 2026-27\(9) Quarry Spaul (May-26) (N-18) (W-14)\ Page 1 of
(As per SOR 2024-25 / MR)
Item of Work Unit Qty. Total Rate Rate In Words
17 Rolling and consolidating water bound
macadam (except laterite and Kankar)
including watering not exceeding 150mm
thickness (Main layer including binding
materials ) including filling in depressions
which occur during the process.(A) With
power roller exceeding 8 tonne and not
exceeding 12 tonne. Rupees Twenty One And Paise Sixty
(SOR 24-25 It Code 26022 Pg. 190) Sq.mt. 1.00 21.69 Nine Only
18 Supplying of WBM Materal on road site as Rupees One Thousand Four Hundred
per direction of Engineer in charge. Seventy Five And Paise Sixty One
(RA-1) Cu.mt. 1.00 1475.61 Only
19 Supplying of WMM Materal on road site as
per direction of Engineer in charge. Rupees One Thousand Six Hundred
(RA-2) Cu.mt. 1.00 1622.06 Twenty Two And Paise Six Only
20 Supplying of Natural GSB on road site as
per direction of Engineer in charge. Rupees Five Hundred Thirty Seven
(RA-3) Cu.mt. 1.00 537.32 And Paise Thirty Two Only
I /We am /are willing to carry out the work at ……………….% (In words……….………………………….percent)
Above / Below (percent should be written in figure and words) of the estimated rates mentioned above
keeping in view the following conditions and the detailed tender conditions attached herewith separately.
s!f p5Z D]HA EZJFDF\ VFJ[, EFJM Above S[ Below DF\YL SM. V[S ,FU] G 50T] CMI TM K[\SJFG]\ ZC[X[ T[DH EFJMGL 8SFJFZL V\S VG[ XaNMDF\ :5Q856[
NXF"JJFGL ZC[X[P
sZf VDFZF TZOYL EZJFDF\ VFJ[, 8SFJFZL 5|DF6[GF pRF q GLRF EFJ p5ZMST AWLH VF.8DGF EFJMG[ ,FU] 50X[ VG[ V[ D]HAGF EFJ D]HA H~ZLIFT D]HAGL
SFDULZL SZL VF5JF ;CDT KLV[P
s#f p5ZMST EFJMGL ;ZBFD6L5+S D]HA ;F{YL GLRF EZ[, EFJMGL V[S H VHg;L GSSL SZJFDF\ VFJX[ VG[ T[ D]HA ;1FD S1FFV[YL V[S V[Hg;LG\] EFJ 5+S
D\H]Z SZJFDF\ VFJX[P
s$f p5ZMST EFJ5+SDF\ NZ[S VF.8D ;FD[ EFJ U6TZL DF8[ H HyYM NXF"JJFDF\ VFJ[, K[P H[YL H~ZLIFT D]HAGF ;A\lWT VF.8DGF HyYFGF SFDJFZ V,U
V\NFH5+SM T{IFZ SZL ;1FD S1FFV[YL D\H]Z SZFJL SFDULZL CFY WZJFDF\ VFJX[P
s5f XZTL EFJM :JLSFZJFDF\ VFJX[ GCLP
s&f EFJM VFBF JQF"GF WMZ6[ VF5JFGF ZC[X[ T[DH H~ZLIFT D]HA EFJMGL D]NT JWFZJFGL H~ZLIFT H6FI tIFZ[ ;CDlTYL EFJMGL D]NT ;1FDS1FFV[YL JWFZJFGL
NZBF:T SZJFDF\ VFJX[P
s*f .GRFH" .HG[ZzLGL ;]RGF D]HA H~ZLIFT D]HAG]\ SFD TFSLNGF WMZ6[ SZJFG]\ ZC[X[P
s(f S]NZTL VFOTM q JFJFhM0] q JZ;FN T[DH DCFG]EFJMGF VFSl:DS SFI"S|DG[ V\TU"T p5ZMST D\H]Z YI[, EFJM 5|DF6[GL SFDULZL TFSLNGF WMZ6[ CFY
WZJFGL ZC[X[ VG[ :Y/ l:YlT VG[ ;DIVG];FZ TSLNGL SFDULZL SZJF D\H]Z YI[, .HFZNFZGF EFJ D]HA VgI .HFZNFZzL 5F;[YL 56 SFDULZL SZFJJFDF\ VFJX[P
.HFZNFZzLGL ;CL GFIA SFI"5F,S .HG[Z
DFU" VG[ DSFG 5[8F lJEFU4
D:\MY Data\Letest Tender Year Rate\Tender - 2026-27\(9) Quarry Spaul (May-26) (N-18) (W-14)\ Page 2 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule-B (Querry Spaul).pdf
SHARATO.pdf
Specification.pdf
ROAD WORKS SPECIFICATIONS.pdf
Tender GR Road - Bridges.pdf
Download all tender documents and submit your bid