Loading…
Loading…
Tender Value
₹87.8 L
EMD Value
₹88,000
Closing Date
10 Sept 2026, 6:00 pm
Executive Engineer, Und Irrigation Division, Jamnagar
Construction of new checkdam on Rupavati river near village : Meghpar Ambardi, Taluka : Jamjodhpur, Dist. : Jamnagar.
339018
08 of 2026-27
Open
Civil Works
Works
Jamnagar
7 documents required · 7 mandatory
₹2,400
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹88,000
26 Aug 2026
26 Aug 2026
26 Aug 2026
10 Sept 2026
26 Aug 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : BIG CHECKDAM
Construction of new checkdam on Rupavati river near village :
Meghpar Ambardi, Taluka : Jamjodhpur, Dist. : Jamnagar.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1(a) Excavation in all sort of strata and formations incl. 286.00 Cum. 79.00
depositing the unuseful excavated stuff as and
where directed incl. sorting and stacking useful
materials as directed upto 200 mt lead and all lift
etc. complete incl. dewatering.
(A) IN OVER BURDEN HARD MURRUM.
1(b) (B) IN SOFT ROCK 1753.00 Cum. 176.00
1(c) (C) IN HARD ROCK 51.00 Cum. 590.00
2 Drilling 25mm dia. holes at distant as specified 420.00 Rmt. 252.00
upto 3.00 mt. depth in checkdam foundation and
fixing anchor bars of specified diameter with
cement grout including cleaning holes as directed
etc. (Excluding cost of Bars)
3 Providing, cutting, bending, binding and fixing in 17.801 M.T. 76574.00
position as per drawing TMT BAR, reinforcement
for R.C.C. works and anchor bars incl. cost of black
annealed 16 to 18 BWG M.S.. Wire etc. complete
with all lead and lift. (B) Fe-500
4 Prov. & Laying in position cement concrete using 1788.00 Cum. 3423.00
cement , sand and crushed metal coarse aggregate
by mass and machine mix for PCC/RCC including
necessary formworks compaction by vibrator,
curing as directed with all lead & lift etc
complete.(Excluding cost of steel) FOR .BODY
WALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC.
4/c) Controlled Concrete Grade M-15 & MSA-40mm.
5 Providing & fixing in position 100/110 mm dia 24.00 Cum. 358.00
PVC Pipe weep holes in the retaining walls / side
wall / abt. etc.
6 Earthwork / Back filling with selected earth 1697.00 Cum. 141.00
brought from out side borrow area or from
excavated useful material including watering
ramming, compaction with pneumatic temping
and all lead and lift etc. complete.
7 Providing & laying graded filters of sand, gravel / 16.00 Cum. 530.00
metal and over size metal (100 to 150 mm) behind
the retaining wall & wing walls as directed as per
approved drawing with all lead and lifts etc.
8 Providing & laying dry rubble pitching with 20 338.00 Sqmt. 723.00
cms gravel / metal and 20 cms sand layers as base
of inverted graded filter and without header stone
but incl. hand packing trimming & dressing of
slopes etc. complete. (B) 45 cms thick stone
9 Providing and laying STONE LOANCHING APRON 425.00 No. 765.00
by using 50% stone which having weighing not
less than 40 Kg. or as specified incl. hand packing
and filling the interstices by spouls etc. complete
with all lead and lift.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
10 Providing and fixing in position white plate of size 1.00 No. 1350.00
45 x 45 x 1.8 cms including engraving. The letters
as per drawing / directed etc. complete.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 87,77,667=77 Estimated Amount Rs. 87,77,667=77
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD New C.D. Meghpar Ambardi.pdf
BOQ.pdf
Tender Notice No.8.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].