Loading…
Loading…
| Sl No | Description | Qty | Unit | VIPIN P L L2 | BABU L1 |
|---|---|---|---|---|---|
| 1.00Well | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 38.47 | cum | 260 ₹10,001.94 | 257.63 ₹9,910.77 Lowest |
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 38.47 | cum | 520 ₹20,003.88 | 517.87 ₹19,921.94 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 38.47 | cum | 135 ₹5,193.32 | 131.02 ₹5,040.21 Lowest |
| 1.00 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 153.88 | cum | 240 ₹36,930.24 | 234.99 ₹36,159.32 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 20 | hour | 350 ₹7,000 | 345.54 ₹6,910.8 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 257.04 | kilogram | 115 ₹29,559.6 | 112.43 ₹28,899.01 Lowest |
| 1.01 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 12.24 | cum | 9,850 ₹1,20,564 | 9,847.37 ₹1,20,531.81 Lowest |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 195.84 | sqm | 315 ₹61,690.23 | 308.96 ₹60,507.34 Lowest |
| 2.00Water pipe supply | |||||
Tender Value
₹5.1 L
EMD Value
₹12,702
Closing Date
1 Jun 2026, 4:00 pmClosed
Assistant Enginner LID and EW , Kattakampal G P
Assistant Enginner LID and EW , Kattakampal GP, Kattakampal p O
Souhrida Nagar Drinking Water Supply Scheme Ward 2-SO388/26-
2026_LSGD_852259_1
Souhrida Nagar Drinking Water Supply Scheme Ward 2
Open Tender
Civil Works - Water Works
Item Rate
330 days
Kattakampal Grama Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,120
Yes
₹12,702
Yes
8 Jul 2026
23 May 2026
3 Jun 2026
23 May 2026
1 Jun 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Well | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.002 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | - | cum | - | - |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | - | cum | - | - |
| 1.004 | 2.26.2:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock | 0.4 | cum | - | - |
| 1.005 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.007 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | - | cum | - | - |
| 1.008 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 0.8 | sqm | - | - |
| 2Water pipe supply | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1440065.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
pa.pdf
Tender Documents • 0.26 MB
tenderform.pdf
Tender Documents • 0.25 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 1.86 MB
BOQ_1440065.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .