Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹75,990Accepted-Finance B 101 M G ROAD BORIVALI EAST MUMBAI MAHARASHTRA 400066 | MUMBAI SUBURBAN | MAHARASHTRA | 400066 | ₹75,990 | L-1 | Accepted-Finance Document OK |
| 2 | L-2₹73,742−₹2,248 (2.96%)Accepted-Finance | ₹73,742−₹2,248 (2.96%) | L-2 | Accepted-Finance Document OK |
| 3 | L-3₹72,881−₹3,109 (4.09%)Accepted-Finance | ₹72,881−₹3,109 (4.09%) | L-3 | Accepted-Finance Document OK |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not submitting Experience certificate |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not submitting Experience certificate |
Tender Value
Refer Docs
Closing Date
8 Feb 2024, 3:00 pmClosed
DDE/M, Mandi Parishad, Lko.
Kisan Mandi Bhawan, Vibhuti Khand, Gomti Nagar lko
Disintegration of Existing Hybrid Solar Power Plant and Conversion including S/I/T/C of the same into ongrid Solar Power Plant at different mandi yards Location.
2024_RKUMP_887500_2
E/M/325/2024-1059
Open Tender
Miscellaneous Works
Item Rate
Kisan Mandi Bhawan Gomti Nagar, Lko.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
9 Feb 2024
3 Feb 2024
8 Feb 2024
3 Feb 2024
8 Feb 2024
3 Feb 2024
Solar Power Plant
S/I/T/C of On-grid smart inverter per KW with standard warranty (mention standard warranty period) along with one optimizer for every two PV module to track & monitor each PV module including MPPT Feature
Standard Warranty for On-grid inverter-12 years for Inverter, Extended warranty for On-grid invereter upto 20 years. Standard warranty for Optimizer- 25 years.
Labour charges for dismantalling of existing off grid solar plant (as per column no-3) per KW
Labour charges for Re-installation of solar plant per KW (without any accessories)
S/I/T/C of Balance of system-DCDB, ACDB, DC Cable, AC Cable per KW
S/I/T/C Net meter (with Requisite arrangements)
Transportation charges for relocation of solar panel from one location to another location per Kilometer. (Size up to 50 Kilowatt)
Avarage Salvage value of inverter per Kilowatt as per Sr. No.3
Avarage Salvage value of Battery per Kilogram as per Sr. No.3
Annual Operation & maintenance cost of ongrid solar plant per Kilowatt
S/I/T/C Solar Panel Polycrysteline (inlcuding structure) per KW
S/I/T/C Solar Panel Polycrysteline (exlcuding structure) per KW
Optional- Testing & submitting performance report of each solar panel (Poly crystalline solar module) at existing solar. Test report should inlcude below parameter after conducting test on each module: 1) I-V Curve Test for Solar System 2) Max. Voltage (Vpm) at Pmax, Max. Current (Ipm) at Pmax 3) Voltage at Open Circuit (Voc), Current at Short Circuit (Isc) 4) Efficiency (%) Calculation of Solar System 5) Temperature Measurement of Solar Panels 6) Irradiance Measurement of Sun Light 7) Series Resistance (Rs) Calculation of Solar Panels 8) Conversion of I-V Curve under OPC to data under Standard Test Condition (STC) based upon IEC Standard 9) Provide Operating Condition (OPC) and Standard Test Condition (STC) test reports for Verification of Solar Panel Performance (OK, or NO OK)
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .