| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No.4(2) dtd.15-12-2023 of Pudussery GP | |
| 2 | L2₹6.6 L+₹55,077.28 (9.17%)Rejected-AOC | L2 | Rejected-AOC Higher rate and hence not admitted |
Tender Value
₹5.5 L
EMD Value
₹13,770
Closing Date
18 Oct 2023, 5:00 pmClosed
Assistant Engineer
AE Pudussery GP
road metalling tarring
2023_LSGD_608954_2
3/AE/LIDEW/PDSY/23-24
Open Tender
Civil Works - Roads
Item Rate
180 days
Kanjikode
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,414
Yes
₹13,770
Yes
22 Jan 2024
7 Oct 2023
21 Oct 2023
7 Oct 2023
18 Oct 2023
7 Oct 2023
Amount
ROAD TARRING
3.15.2:Compacting Original Ground<br> (ii) Compacting original ground supporting subgrade<br> Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.9.3.pb.pa:Plastic roads- Packed Bitumen Rate 20mm thick Open-Graded Premix Carpetusing Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 -Packed Bitumen and Shredded Plastic Providing, laying and rolling of opengradedpremix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregateseither using penetration grade bitumen or emulsion to required line, grade and level toserve as wearing course on a previously prepared base, using HM Plant attached withopen pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, thentransferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hotbitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rollingwith a. three wheel 80-100 kN static roller capacity, finished to required level and gradesto be- followed by seal coat of either Type A or Type B or Type C as per TechnicalSpecification Clause 508 Case - I By Manual Means (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65)
3.14:Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
NAME BOARD
51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
OD172202/2023-2024: Supplying and providing readymade GI name board with all conveyance,labour and hire charges etc complete using GI hollow tube of size 80x40x1.4 mm post,40x20x1.4mm outer erame,0.6mm thick iron sheet of size 90x60cm with two coat of enamal painting over a coat of primer,lettering with suitable colour and size,fixing the post in ground with CC 1:2:4 etc complete.
Vilambaranathan P
Bidder Name
MADHUSOODHANAN A
Vilambaranathan P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .