| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC | ₹2.6 Cr | L1 | Accepted-AOC BID IS RESPONSIVE |
| 2 | L2₹2.7 Cr+₹26,528.34 (0.10%)Rejected-Finance 12 SADAR BAZAR CHAKRATA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹2.7 Cr+₹26,528.34 (0.10%) | L2 | Rejected-Finance BID IS NON RESPONSIVE |
| 3 | Rejected-Technical | - | - | Rejected-Technical Bid is Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Bid is Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Bid is Non Responsive |
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
4 Aug 2021, 1:00 pmClosed
CE URRDA
CHIEF ENGINEER URRDA DIRECTORATE OF PANCHAYATIRAJ OPP-IT PARK SAHASTRADHARA ROAD DEHRADUN
UT 13143 XXI GARATH DIWARIKHOL TO GARATH LINK MR STAGE-II 4.875 KM
2021_CCUK_111744_1
UT13143
National Competitive Bid
Civil Works - Roads
Item Rate
180 days
CHINYALISAUR
PLEASE REFER TECHNICAL BID
3 documents required · 3 mandatory
₹4,720
₹5.6 L
MUSSOORIE
13 Sept 2021
8 Jul 2021
4 Aug 2021
8 Jul 2021
4 Aug 2021
12 Jul 2021
9 Jul 2021
Amount
Excavation in Cutting in all type of Soil and rock by manual means with lead up to 50 M for carrying of cut earth to embankment ( Half cut and half fill ) as directed by Engineer-in-charge and MORD Specification Clause 302.3 For making dameged super Elevation .
Construction of Embankment with Material Obtained from Roadway Cutting with approved materials deposited at site from roadway as directed by Engineer-in-charge and MORD Specification 301.5.5 for Filling/Patri Filling
PROTECTION WORK
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90
Excavation for Structures: - Earth work in Excavation foundation for cross drainage structures, retaining walls, breast walls & other similar structures in all types of soils and rocks as met at site with all leads, lifts and disposal of surplus earth as directed by engineer in charge including supply of all material labour, T&P etc. required for proper completion of work in accordance with the MORD specification.
Random Rubble stone masonry for structure laid dry by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge.
Random Rubble stone masonry for structure laid 1:5 by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge.
Hand packed stone filling in the back of retaining walls, abutments, wing walls etc. by locally available approved stone including supply of all material, labour, T&P etc. required for proper completion of the work as directed by Engineer in charge.
Providing and fixing of C.C. edge stones 12cm*12cm*60cm size precast in M15 cement concrete with 4 nos. 8mm dia HYSD vertical bars and 3 nos. 6mm dia MS bar stirrups as per approved drawing including two coat white washing on valley side formation
Parapet in R.R. 1:5
Excavation
25mm thick Coping M-20
Pointing 1:3
plastering 1:4
White washing two coats on parapet walls and tree turnks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916 of MoRD specifications for Rural Roads 2014.
Providing and laying of boulder apron laid in wire crates with 4 mm dia G.I. Wire conforming to IS: 280 & IS: 4826 in 100mm x 100mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specification of MORD and as directed by Engineer in charge.
Hill Side Drain
Construction of Hill side pucca drain in accordance with the requirement of specification true to lines and grades. Dimensions and other perticulars as per drawing including all material, labour, T&P ect. Required for proper completion of the work and technical
Excavation
Plaster in 1:4 cement sand mortar
Maintenance of Drains. The maintenance of Kutcha drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907
SUB-BASE COURSE / BASE COURSE
Stablllz€d Sub-base/Base: Providing, laying, spreading and compacting chemically Stabilized soil mix for Base Course on prepared Subgrade, including Pulverising, adding Designed quantity of IRC Accredited Additives/ Cement /Lime to the spreaded soil, proper mixing of soil & granular material with mixing in place method with Rotavator, Grading with Motor Grader and Compacting with Road Roller at OMC to achieve the Designed Unconfined Compressive Strength and to form a layer of base strictly as per technical specification clause 404 and Method Statement of Technology provider (Procedure and Method Statement duly Approved by IRC). including cost of all material, labour, T&P €tc required for proper completion of work, (Soil Stabilisation Design will be provided by the contractor from NABL Accredited Laboratory), followed by Field Tests for CBR, Field Dry Density, UCS, Durability as per defined Sampling Frequency specified in MORD. Post Laying Tests and Soll Properties shall fullfil the Design Requirement.
Surface Waterproofing on top of the sub Grade/ soil base/Earthen Shoulder with appropriate Technology duly Accredited by IRC, based according to the Recommended Doses and Method Statement by the Manufacturer / Technolory Provider duly Approved and Accredited by IRC
PAVEMENT
Prime Coat with Appropriate Technologr duly Accredited by IRC to achieve Enhanced Spreadibility, Uniform Coverage, Penetration Improvement, Lower Residual Bitumen, Improved Water Resistance, euick Setting and Reduced Consumption used with cationic bitumen emulsion CSS1 (lRC Approved)- as per MORD Section 502 used with Recommended Doses and Method Statement of Additive by Manufacturer / Technolory Provider (Duly Approved and Accredited by IRC)
OGPC with Appropriate Technolopr duly Accredited by IRC: Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates with using penetration grade Bitumen mixed with Additive for enhansed performance and durability to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity as per MORD Section 506, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause S08. The Additive shall be IRC Accredited and Doses and Method Statement as Recommended by Manufacturer / Technology Provider (Duly Approved and Accredited by tRC)
Seal Coat with Appropriate Technolory duly Accredited by IRC: providing and laying seal coat mixed with Additive, sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type & Type B and Type C as per Technical Specification Clause 510. The Additive shall be IRC Accredited and Doses and Method Statement as Recommended by Manufacturer / Technology Provider
CROSS DRAINAGE WORKS
Construction of R.C.C. slab scupper including catchpit with R.R. stone masonry laid in 1:5 cement, mortar & RCC M25 grade slab, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & directed by Engineer-in-Charge.
Excavation
PCC M-10 (1:3:6) (Hand mixing)
HYSD Reinforcement bar
H.P Stone Filling
Construction of 1 Nos. Causeway with R.R dry Khranja, Plain cement concrete 1:3:6, R.C.C 1:1.5:3 including supply and fixing of H.Y.S.D Steel reinforcement and required excavation etc. complete all respect as per drawing approved by CE Level- I P.W.D Uttarakhand
Excavation
Kharanja
HYSD Reinforcement bar
ROAD FURNITURE
Providing & fixing of PMGSY Logo Board at starting point, end point and at every 2 Km distance of road length as per attached standard drawing duly painted and written and as directed by Engineer in charge. as per MORD specification Clause 1701
Providing fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and written as directed by Engineer in charge. as per MORD specification Clause 1701 .
Providing & fixing of Citizen Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .
Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by mean of properly designed foundations with M-15 grade cement concrete 450x450x600 mm, 600 mm below ground level as per approved drawing Clause 1701.2.2. 600 mm equilateral & triangle
Providing & fixing of Maintenance Information Board with PMGSY Logo at starting or prominent location (where maximum no. of citizens can view the detail of the road) as per attached standard drawing dully painted and written as directed by Engineer in charge. as per MoRD specification Clause 1701 .
Prepairing the Plane Table survey & Levelling for completion Plan as per Engineer-in-Charge & as per P.W.D. specification.
Emergency Maintenance
Major Slip Clearence in all type of soils, Rocks and boulders including cost of all material, Machine, T&p etc required for proper completion of work as per MoRD specifications of work 1611.
1st year
2nd year
3rd year
4th year
5th year
Deploying Hydraulic Excavators of 0.90 cum Bucket for clearence of Major Slip in all type of Soil, Rock and Boulders including its Operator, POL, and all other charges required for proper completion of work.
1st year
2nd year
3rd year
4th year
5th year
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing notless than 25 kg each as directed by Engineer-in-charge and MoRD specification 1301 .
1st year
2nd year
3rd year
4th year
5th year
Coolie walling including supply of all material, labour, T&P , royalty etc. required for proper completion of the work , as directed by Engineer-in-charge and as per PWD specifications 8.90
1st year
2nd year
3rd year
4th year
5th year
Maintainance Activities:
Maintenance Under PBMC for (1) Trimming of grass and weeds from the shoulders/Berms and disposing of the same to suitable locations as per technical specification clause 1914. (2) Maintenance of road side drain including minor slip clearence reshaping, deepening and regrading as well as catch water drains as per technical specification clause 1907. (3) Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per technical specification clause 1903 (4) Maintenance of scuppers & culverts by way of clearing, cleaning, erosion repair, repair to crack, parapet walls and protection works as per technical specification clause 1908. (5) Maintenance of Causeway by way of minor surface repairs, replacing guide posts, repair of fixed gauges, removal of debris providing boulders and protection works and painting as per technical specification clause 1909. (6) Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. (7)Maintenance of 200 metre, km stones, by way of refixing of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 meter, km stone and 5th km stone as per drawing and technical specification Clause 1912. (8)Repairing of pot holes by removal of loose material, trimming of sides, cleaning of surface and providind tack coat bitumen emulsion and patch repair with 20 mm thick premix carpeting and type B seal coat using biyumen bitumen emuision(in 3rd and 5th year) (9)Two coat White washing on parapet walls of CD work, edge stones, tree truncks and prominent rocks, patches on hill sides including preparation of surface by cleaning scrapping etc. as per Technical specification Clause 191.
1st year
2nd year
3rd year
4th year
5th year
Amit Joshi
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .