| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.5 LAccepted-Finance CHEMBISSERY PUTHIYAKAVU TRIPUNITHURA P O KOCHI 682301 | ERNAKULAM | KERALA | 682301 | ₹26.5 L | L1 | Accepted-Finance Accepted being Lowest and reasonable |
| 2 | L2₹27.6 L+₹1.1 L (4.03%)Rejected-Finance KUMMAMKULAM HOUSE KADAVANTHRA KOCHI 682 020 | ERNAKULAM | KERALA | 682020 | ₹27.6 L+₹1.1 L (4.03%) | L2 | Rejected-Finance Rejected due to not being L1 |
| 3 | L3₹29.6 L+₹3.0 L (11.4%)Rejected-Finance 18 837 KILIYARAA HOUSE PERUMPADAPPU PALLURUTHY PO KOCHI 682 006 | KOCHI | ERNAKULAM | KERALA | 682006 | ₹29.6 L+₹3.0 L (11.4%) | L3 | Rejected-Finance Rejected due to not being L1 |
| 4 | L4₹31.6 L+₹5.1 L (19.2%)Rejected-Finance MATTILIPARAMBIL HOUSE SAHODHARAN AYYAPPAN ROAD EROOR WEST PO THIRUPUNITHURA 682306 | THIRUPUNITHURA | ERNAKULAM | KERALA | 682306 | ₹31.6 L+₹5.1 L (19.2%) | L4 | Rejected-Finance Rejected due to not being L1 |
| 5 | L5₹31.7 L+₹5.2 L (19.6%)Rejected-Finance | ₹31.7 L+₹5.2 L (19.6%) | L5 | Rejected-Finance Rejected due to not being L1 |
| Sl No | Description | Qty | Unit | Oriental Constructions L4 | M/s.Rejoy Constructions L1 | Phejays Agencies L5 | POOJA ENGINEERING WORKS L2 | Anaswara Constructions L3 | Bell Builders L6 | S&C ENTERPRISES L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Opening the man holes of septic tanks, removing night soil, other sediments, solid waste, and liquid waste in any condition by pumping or any other mechanical means, using sewage sucking truck cleaning internal surfaces of the tank with clean water and refix the man hole cover on completion of work, complete all as specified and as directed by Engineer In Charge.
Notes:- (a) The night soil, other sediments, solid waste, and liquid waste in any condition removed from septic tank shall be taken away from respective vicinities and NB(K) Premises on closed containers/conveyance and disposed off out of defence land
(b) Disposal of the same shall be the responsibility of the contractor with out any extra expenditure to government. Disposal of waste shall be made in accordance with the regulations of authorities concerned.
c) The unit rate quoted shall be deemed to be inclusive of cleaning the neared MH & sewage line from that MH to septic tank. | 150 | Cum | 350 ₹52,500 | 200 ₹30,000 | 100 ₹15,000 Lowest | 320 ₹48,000 | 180 ₹27,000 | 120.33 ₹18,049.5 | 250 ₹37,500 |
| 2.00 | All as per item No 1 above but for manhole of plan area n exc 1 Sqm and depth upto 0.50m. | 250 | Each | 330 ₹82,500 | 200 ₹50,000 | 40 ₹10,000 | 45 ₹11,250 | 40 ₹10,000 | 25.3 ₹6,325 Lowest | 250 ₹62,500 |
| 3.00 | All as per item No 1 above but for manhole of plan area n exc 1 Sqm and depth from 0.50 to 1.00 m. | 50 | Each | 40 ₹2,000 | 25 ₹1,250 Lowest | 40 ₹2,000 | 50 ₹2,500 | 60 ₹3,000 | 30 ₹1,500 | 30 ₹1,500 |
| 4.00 | All as per item No 1 above but for manhole of plan area n exc 1 Sqm and depth more than 1.00m. | 50 | Each | 45 ₹2,250 | 26 ₹1,300 Lowest | 50 ₹2,500 | 49 ₹2,450 | 80 ₹4,000 | 35 ₹1,750 | 34 ₹1,700 |
| 5.00 | All as item No 1 above but for cleaning of sewage line/effluent drains 100mm dia below/above GL. | 400 | RM | 55 ₹22,000 | 31 ₹12,400 | 25 ₹10,000 | 45 ₹18,000 | 20 ₹8,000 Lowest | 40 ₹16,000 | 40 ₹16,000 |
| 6.00 | All as item No 1 above but for cleaning of sewage line/effluent drains 150mm dia below/above GL. | 500 | RM | 40 ₹20,000 | 22 ₹11,000 Lowest | 25 ₹12,500 | 50 ₹25,000 | 25 ₹12,500 | 50 ₹25,000 | 30 ₹15,000 |
| 7.00 | Cleaning of culvert and covered drains of any size incl removal of RCC cover slab and refixing in same position after the cleaning incl necessary minor repairs to wide wall of brick masonery/concrete incl setting and joining the cover slab in cement mortar 1:6 and removing the silt and dirt to a distance exc 200 and n,exc 250 m from starting point and disposed off (span of culvert upto 1m) complete all as specified and directed. | 500 | RM | 40 ₹20,000 | 24 ₹12,000 | 50 ₹25,000 | 55 ₹27,500 | 55 ₹27,500 | 20 ₹10,000 Lowest | 30 ₹15,000 |
| 8.00 | Removing the chokes of WC/bathroom/kitchen traps/drains up to Ist manholes including cleaning of gully traps in single storied/ground floor of multistoried bldgs complete all as specified and directed. | 400 | Per Chock | 50 ₹20,000 | 26 ₹10,400 | 25 ₹10,000 Lowest | 45 ₹18,000 | 50 ₹20,000 | 50 ₹20,000 | 25 ₹10,000 Lowest |
| 9.00 | M&L for pumping out sludge water from manhole for cleaning blocked sewage line mouth and removing the sludge from any size/depth of manhole and burying the waste material in borrow pits complete all as specified and as directed. Note:- The cost for the borrowpit shall be deemed to be inclusive in the quoted rate of this item. | 200 | Each | 130 ₹26,000 | 71 ₹14,200 | 40 ₹8,000 | 55 ₹11,000 | 35 ₹7,000 Lowest | 75 ₹15,000 | 50 ₹10,000 |
| 10.00 | Cleaning by roding /bamboo split and Jetting Machine and taking out waste soil, sludge and other foreign materials from sewage line/effluent drains below/above GL of any dia of pipe removed with sealed container out side of MOD Land as per CGDA guidelines complete all as specified and directed. | 2,000 | RM | 45 ₹90,000 | 18 ₹36,000 | 25 ₹50,000 | 50 ₹1,00,000 | 15 ₹30,000 Lowest | 35 ₹70,000 | 20 ₹40,000 |
Tender Value
₹39.9 L
EMD Value
₹79,800
Closing Date
14 Aug 2026, 6:00 pmClosed
GE(NW)KOCHI
GARRISON ENGINEER (NW) MILITARY ENGINEER SERVICES NAVAL BASE POST -682 004
AS PER BOQ AND TENDER DOCUMENT
2026_MES_778608_1
8609_GE_NW
Open Tender
Civil Works
Item Rate
365 days
KOCHI
AS PER TENDER DOCUMENT
7 documents required · 7 mandatory
₹500
GE(NW)KOCHI
₹79,800
28 Aug 2026
15 Jul 2026
24 Aug 2026
15 Jul 2026
14 Aug 2026
31 Jul 2026
15 Jul 2026 - 31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Opening the man holes of septic tanks, removing night soil, other sediments, solid waste, and liquid waste in any condition by pumping or any other mechanical means, using sewage sucking truck cleaning internal surfaces of the tank with clean water and refix the man hole cover on completion of work, complete all as specified and as directed by Engineer In Charge.
Notes:- (a) The night soil, other sediments, solid waste, and liquid waste in any condition removed from septic tank shall be taken away from respective vicinities and NB(K) Premises on closed containers/conveyance and disposed off out of defence land
(b) Disposal of the same shall be the responsibility of the contractor with out any extra expenditure to government. Disposal of waste shall be made in accordance with the regulations of authorities concerned.
c) The unit rate quoted shall be deemed to be inclusive of cleaning the neared MH & sewage line from that MH to septic tank. | 150 | Cum | - | - |
| 2 | All as per item No 1 above but for manhole of plan area n exc 1 Sqm and depth upto 0.50m. | 250 | Each | - | - |
| 3 | All as per item No 1 above but for manhole of plan area n exc 1 Sqm and depth from 0.50 to 1.00 m. | 50 | Each | - | - |
| 4 | All as per item No 1 above but for manhole of plan area n exc 1 Sqm and depth more than 1.00m. | 50 | Each | - | - |
| 5 | All as item No 1 above but for cleaning of sewage line/effluent drains 100mm dia below/above GL. | 400 | RM | - | - |
| 6 | All as item No 1 above but for cleaning of sewage line/effluent drains 150mm dia below/above GL. | 500 | RM | - | - |
| 7 | Cleaning of culvert and covered drains of any size incl removal of RCC cover slab and refixing in same position after the cleaning incl necessary minor repairs to wide wall of brick masonery/concrete incl setting and joining the cover slab in cement mortar 1:6 and removing the silt and dirt to a distance exc 200 and n,exc 250 m from starting point and disposed off (span of culvert upto 1m) complete all as specified and directed. | 500 | RM | - | - |
| 8 | Removing the chokes of WC/bathroom/kitchen traps/drains up to Ist manholes including cleaning of gully traps in single storied/ground floor of multistoried bldgs complete all as specified and directed. | 400 | Per Chock | - | - |
| 9 | M&L for pumping out sludge water from manhole for cleaning blocked sewage line mouth and removing the sludge from any size/depth of manhole and burying the waste material in borrow pits complete all as specified and as directed. Note:- The cost for the borrowpit shall be deemed to be inclusive in the quoted rate of this item. | 200 | Each | - | - |
| 10 | Cleaning by roding /bamboo split and Jetting Machine and taking out waste soil, sludge and other foreign materials from sewage line/effluent drains below/above GL of any dia of pipe removed with sealed container out side of MOD Land as per CGDA guidelines complete all as specified and directed. | 2,000 | RM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.34 MB
Tender8609.pdf
Tender Documents • 0.64 MB
PS8609.pdf
Additional Documents • 0.33 MB
Testing.pdf
Additional Documents • 0.40 MB
BOQ_872058.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .