Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.0 LAccepted-AOC 21 408 2 HAYA TOWER POOTHOLE ROAD WEST FORT THRISSUR KERALA 680004 | THRISSUR | KERALA | 680004 | L1 | Accepted-AOC Work awarded | |
| 2 | L1₹6.6 CrAccepted-AOC | L1 | Accepted-AOC work awarded | |
| 3 | L2₹10.9 CrRejected-Finance | L2 | Rejected-Finance Higher rate | |
| 4 | Rejected-Technical PLOT NO 3821 PHASE IV GIDC VATVA VATVA AHMEDABAD GUJARAT 382445 | AHMADABAD | GUJARAT | 382445 | - | Rejected-Technical Technical Committee |
Tender Value
₹12.3 Cr
EMD Value
₹12.3 L
Closing Date
7 Feb 2023, 2:00 pmClosed
Director of Agriculture Kerala
Director of Agriculture Directorate of Agriculture Development and Farmers Welfare Department Thiruvananthapuram Kerala Pin 695033
Supply, installation, trial run and commissioning of Submersible Axial Flow pump sets in KOLE LANDS of THRISSUR and MALAPPURAM Districts of KERALA
2022_AGRI_545418_1
ADFW/11420/2022-TG3/NS
Open Tender
Equipments
Item Wise
180 days
Thrissur Ponnani Kole
Please refer Tender documents.
6 documents required · 6 mandatory
₹25,000
₹12.3 L
Yes
7 Feb 2024
7 Jan 2023
9 Feb 2023
7 Jan 2023
7 Feb 2023
7 Jan 2023
7 Jan 2023 - 7 Feb 2023
Minimum discharge at duty point head (lps): 140 Duty point head (m): 3.0 Working head range (m): 0.5-5.0 Available power allocation (hp): 10 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 125 Duty point head (m): 4.0 Working head range (m): 0.5-5.0 Available power allocation (hp): 10 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 325 Duty point head (m): 3.0 Working head range (m): 0.5-5.0 Available power allocation (hp): 20 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 250 Duty point head (m): 4.0 Working head range (m): 0.5-5.0 Available power allocation (hp): 20 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 265 Duty point head (m): 4.0 Working head range (m): 0.5-6.0 Available power allocation (hp): 25 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 475 Duty point head (m): 3.0 Working head range (m): 0.5-5.0 Available power allocation (hp): 30 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 350 Duty point head (m): 4.0 Working head range (m): 0.5-6.0 Available power allocation (hp): 30 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 275 Duty point head (m): 5.0 Working head range (m): 0.5-7.0 Available power allocation (hp): 30 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 525 Duty point head (m): 3.0 Working head range (m): 0.5-5.0 Available power allocation (hp): 40 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 450 Duty point head (m): 4.0 Working head range (m): 0.5-6.0 Available power allocation (hp): 40 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 775 Duty point head (m): 3.0 Working head range (m): 0.5-5.0 Available power allocation (hp): 50 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 575 Duty point head (m): 4.0 Working head range (m): 0.5-6.0 Available power allocation (hp): 50 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 475 Duty point head (m): 5.0 Working head range (m): 0.5-7.0 Available power allocation (hp): 50 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 700 Duty point head (m): 4.0 Working head range (m): 0.5-6.0 Available power allocation (hp): 60 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 550 Duty point head (m): 5.0 Working head range (m): 0.5-7.0 Available power allocation (hp): 60 Overall efficiency at duty point head (%): 70
Minimum discharge at duty point head (lps): 700 Duty point head (m): 5.0 Working head range (m): 0.5-7.0 Available power allocation (hp): 70 Overall efficiency at duty point head (%): 70
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_800959.xls
BOQ Document • 0.32 MB
112312814.pdf
Tender Document • 0.42 MB
LOCATIONAnnexureI.pdf
Tender Document • 0.04 MB
AnnexureIIIagreement.pdf
Tender Document • 0.18 MB
AnnexureIVformoftender.pdf
Tender Document • 0.25 MB
AnnexureIIdeclaration.pdf
Tender Document • 0.36 MB
112312816.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .