Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.3 LAccepted-AOC KALLIYOOR P O THIRUVANANTHAPURAM 42 KERALA | 42 | L1 | Accepted-AOC Agreement Executed |
Tender Value
₹24.6 L
EMD Value
₹50,000
Closing Date
6 Nov 2023, 2:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, PWD, ROADS DIVISION, THIRUVANANTHAPURAM
RC WORK
2023_PWD_617271_1
PWD/RB/TR/8755/2022_5_2_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
THIRUVANANTHAPURAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
5 Dec 2023
30 Oct 2023
8 Nov 2023
30 Oct 2023
6 Nov 2023
30 Oct 2023
Amount
Initial Rectification Works
OD32888/2022-2023:Clearing chocked up drain by manual means including removal of debris with in a distance of 1000 m
OD29441/2022-2023:Filling up potholes with bituminous ready mix compound(25kg bag) and compacting by ramming to get a compact surface including of cost of materials, laying charges,transportation to site etc. complete.Rate isarrived for a bag of 25kg
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.1.a:Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. By Manual Means.
OD32893/2022-2023:Hire Charge For Wood Cutting Equipment's, pulleys etc.
OD32894/2022-2023:Engaging wood cutters for cutting of trees and removal of fell down trees and branches etc complete
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
OD259011/2022-2023:Providing and fixing of DLP board for running contract work with non retro-reflectorised vinyl sign with 1 year warranty manufactured by Vinyl printed sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
Road furnitures and appurtenance works
12.1.A.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3 m - Manual Means
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
Premonsoon Works
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
OD29434/2022-2023:Engaging man Mazdoor For Removing / Cleaning the rubbish and other aligned activities etc.
OD29435/2022-2023:Tipper for removal of all debris and excavated waste materials away from site
OD29436/2022-2023:Lifting and Replacing the RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
OD29437/2022-2023:Hire Charge For Wood Cutting Equipment's, pulleys etc.
OD29438/2022-2023:Cleaning chocked up side drain by manual means and depositing the waste materials for a minimum distance of 5 KM lorry conveyance as per clause 305.etc. complete.
OD29439/2022-2023:Engaging Man Mazdoor
OD29440/2022-2023:Engaging wood cutters for cutting of trees and removal of fell down trees and branches etc complete
OD32929/2022-2023:Filling up potholes with bituminous ready mix compound(25kg bag) and compacting by ramming to get a compact surface including of cost of materials, laying charges,transportation to site etc. complete.Rate isarrived for a bag of 25kg
OD136912/2022-2023:Hire charges for Gas cutter.
OD136913/2022-2023:Engaging Blacksmith for cutting the boards, hordings, sheets, lean to roof portions etc as directed by the departmental officers at site.
OD136914/2022-2023:Engaging crane for the removal of cut down branches of trees.
OD136915/2022-2023:Bailing out water with 5 HP Engine and Pump set including conveyance to the site and erection cost of fuel, lubrication and other stores pay of staff etc
Anticipatory Patch work
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.3:Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.1.a:Providing, laying and rolling of open graded premix carpet of 20 mm thickness with 0.27 cum of 12 mm departmental aggregates premixed with 12.96 kg of bitumen per 10 sqm using penetration grade bitumen to required line, grade and level on a previously prepared base, after priming the existing surface with 5 kg of bitumen (VG 30) 10 sqm including mixing in a suitable plant, laying and rolling with a three wheel static roller of 80-100 KN capacity, finished to required level and grades,followed by a seal coat of 0.09 cum of 6 mm departmental aggregates premixed with 8.64 kg of bitumen per 10 sqm. By Manual Means.
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
Bidder Name
SARATH S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_925959.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .