Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Successful₹16.8 LAccepted-AOC | ₹16.8 L | Successful | Accepted-AOC Successful bidder Priyatita Mohanty, C Class Contractor declared as winner in lottery |
| 2 | Unccessful₹16.8 LRejected-Finance AT PO TUMUDIBANDHA P S TUMUDIBANDHA DIST KANDHAMAL ODISHA PIN 762107 | TUMUDIBANDHA | KANDHAMAL | ODISHA | 762107 | ₹16.8 L | Unccessful | Rejected-Finance Unsuccessful bidder |
| 3 | Unccessful₹16.8 LRejected-Finance | ₹16.8 L | Unccessful | Rejected-Finance Unsuccessful bidder |
| 4 | Unccessful₹16.8 LRejected-Finance AT SUNAPANGA P O P S BALIGUDA DIST KANDHAMAL ODISHA | GANJAM | ODISHA | 761108 | ₹16.8 L | Unccessful | Rejected-Finance Unsuccessful bidder |
| 5 | Unccessful₹16.8 LRejected-Finance AT KAUGUDA P O JHIRIPANI P S BELGHAR DIST KANDHAMAL ODISHA PIN 762107 | KANDHAMAL | ODISHA | 762107 | ₹16.8 L | Unccessful | Rejected-Finance Unsuccessful bidder |
Tender Value
₹17.0 L
EMD Value
₹16,950
Closing Date
13 Mar 2026, 5:00 pmClosed
Executive Engineer,RWD Balliguda
Executive Engineer,RWD Balliguda
SR to Jhiripani to Kalahandi Border Via Baraguda Road for the year 2025-26
2026_CERWI_126929_3
Online Tender- 18/EERWDBLG/2025-26
National Competitive Bid
Civil Works - Roads
Percentage
60 days
Balliguda/Kandhamal/Odisha
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,000
₹16,950
Yes
8 Sept 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
6 Mar 2026 - 12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 2,184 | Sqm | 8.44 | ₹18,432.96 |
| 2 | Clearing the existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and /or compressed air to recieved bituminous. | 4,095 | Sqm | 5.46 | ₹22,358.7 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5 kms spreading, grading to required slope and compacting to meet requirement. | 118.8 | Cum | 168.8 | ₹20,053.44 |
| 4 | Construction of granular sub-base by providing Grade - III well graded material, spreading in uniform layers with motor grader on prepared surface, and compacting with three wheel smooth roller at OMC to achieve the desired density, complete as per Technical Specification Clause 401 of MORD and direction of Engineer-in-Charge. | 81.9 | Cum | 734.15 | ₹60,126.89 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel statick roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density as per Technical Specification Clause 405 of MORD and as per direction of Enginner-in-Charge. bu mamual means | 9.7 | Cum | 4,110.69 | ₹39,873.69 |
| 6 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 of MORD and as per direction of Enginner-in-Charge. | 129.36 | Cum | 64.73 | ₹8,373.47 |
| 7 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 of MORD and as per direction of Enginner-in-Charge. | 4,095 | Sqm | 15.64 | ₹64,045.8 |
| 8 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH spefn. clause No. 508 complete. | 112.18 | Cum | 13,030.39 | ₹14,61,749.15 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_584135.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 4.41 MB
Tendernotice_3.pdf
PDF • 0.77 MB
BOQ_584135.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .