Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Tender Fee not deposited |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
27 Jan 2024, 12:00 pmClosed
Executive Engineer
ETD-I, UPPTCL, Room No. 115 to 120, Pareshan Bhawan, Near Mantri Awas, Vibhuti Khand, Gomti Nagar, Lucknow
Painting Work at 132 KV S/S TRT
2024_UPTCL_880304_1
TERM E-TENDER 09/ETD-I (L)/2023-24
Open Tender
Electrical Works
Item Rate
30 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AC No 0758002100008830 IFSC PUNB0691100
₹4,000
30 Jan 2024
12 Jan 2024
27 Jan 2024
12 Jan 2024
27 Jan 2024
12 Jan 2024
Amount
Following works are to be carried out and completed at 132 KV S/S TRT under ETD-I, Lucknow.
Spray/ Brush Painting work of various equipment’s done after removing foreign material from the surface. The surface to be painted is to be cleaned again and again by dry cotton and steel wire brushes. After proper cleaning red oxide primer is to be applied on the surface is to be painted and left to be dried for 24-48 hrs. After drying of red oxide primer the surface is to be painted by smoke grey paint of best quality in two coats/ as per instruction of AE (M)/ JE (M) on the following equipment’s.
132 KV CBs
132 KV Isolators Junction Box
132 KV CT/PT/CVT
132 KV CT/PT/CT Junction Box
33 KV CT/PT
33 KV CT/PT Junction Box
33 KV Isolators Junction Box
Repairing/ Painting of the fire bucket stands by post office red colour paint and writing on it various fire S/S telephone numbers on one side and S/S name on other side and writing, Writing “AAG” (in Hindi) and ‘FIRE’ on sand stands.
Painting of Sand buckets/drums available at the following 132 KV Substation TRT, Lucknow. The sand buckets shall be painted by post office red colour paint in two coats after proper preparation of surface. Topping up of sand in sand buckets and writing “AAG” (in Hindi) and ‘FIRE’ on sands buckets.
Brush painting of complete surface of the Pale Fencing including its MS strip Horizontal Runners MS Angle Frames, MS Angle Vertical Uprights etc around the substation by due rubbing with sand paper & wire Brush, cleaning with thin cotton cloth and finally applying 1 cost of red oxide primer and then 2 coat of Green colour 1 st quality synthetic enamel Paints of Asian/ Berger make at the gap of 48 hours each after due repairing of damaged pale by welding/knitting etc. as per requirement. (Note- The second coat shall be applied when Ist coat of paint is done and checked by AE (M)/JE (M) concerned).
shiva enterprises
POWERTECH GREEN ENERGY
M/S YUVAN ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .